← Back
Two family converted from one family
856 EAST 18 STREET
BROOKLYN · Flatbush (West)-Ditmas Park-Parkville · BIN 3179401
💬 Discuss this project
1905Year Built
2.75Stories
B3Building Class
R4AZoning
2,970 sfGross Floor Area
2Units
5 Open Violations 3 unresolved · 2 paperwork only ▸FDNY Report ↗
Two family converted from one family · 4,000 sf lot · 0.74 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingGeneral
Attic17p · 3 filings · 20 docs
Floor 217p · 3 filings · 20 docs
Floor 118p · 3 filings · 20 docs
Cellar20p · 3 filings · 20 docs
Filed — no permit issued2p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
VIOLET HOLDINGS2207/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/23/2023$2.4M—— → —$808/sf building
07/19/2021$990K—— → —$333/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BADALY ENGINEERING PLLC810/13/2022
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MAMC CONSULTING REPS LLCGeneral Contractor407/08/2026
2260 MAG CORPGeneral Contractor207/08/2026
DPH PLUMBING & HTG CORPPlumbing207/08/2026
5 J'S ELECTL CONTS CORPElectrical103/22/2026
JOSE GONZALEZElectrical103/21/2026
F.W. SIMS INCGeneral Contractor103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BADALY ARCHITECT PLLC7137810/13/2022
Building Lifecycle
All (65)Filed (8)Permit Issued (4)Signed Off (2)Violation (14)Inspection (11)Special Inspection (26)
11/06/2024
Signed off — Alteration
B00586185-I1
10/15/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/14/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/14/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
04/12/2023
Permit issued — Mechanical Systems
B00586185-I1-MS
03/27/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/23/2023
Permit issued — General Construction
B00555720-I1-GC
03/16/2023
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
03/14/2023
Signed off — Alteration
REPLACEMENT OF PLUMBING FIXTURES PER PLANS, NEW GAS APPLIANCES PER PLANS
B00586186-I1
10/24/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/24/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/20/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/14/2022
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/14/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
SHAHIN BADALY
10/14/2022
Special inspection requirement — HVAC-R and service water heating equipment
SHAHIN BADALY
10/14/2022
Special inspection requirement — HVAC-R and service water heating system controls
SHAHIN BADALY
10/14/2022
Special inspection requirement — Permanent certificate
SHAHIN BADALY
10/14/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
SHAHIN BADALY
10/13/2022
Filed — Alteration
REPLACEMENT OF PLUMBING FIXTURES PER PLANS, NEW GAS APPLIANCES PER PLANS
B00586186-P3
10/12/2022
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
09/23/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/23/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/16/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
SHAHIN BADALY
09/16/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
SHAHIN BADALY
09/16/2022
Special inspection requirement — Energy Code Compliance Inspections
SHAHIN BADALY
09/16/2022
Special inspection requirement — Fire-Resistance Rated Construction
SHAHIN BADALY
09/16/2022
Special inspection requirement — Fenestration areas
SHAHIN BADALY
09/16/2022
Special inspection requirement — Fenestration air leakage
SHAHIN BADALY
09/16/2022
Special inspection requirement — Insulation placement and R values
SHAHIN BADALY
09/15/2022
Filed — Alteration CO
ALTERATIONS AS PER PLANS. ALL EXISTING WINDOWS TO BE REPLACED WITH NEW. NEW ROOFING AND SIDING MATERIAL TO BE INSTALLED ON TOP EXISTING.
B00555720-P2
09/14/2022
Special inspection requirement — Fenestration air leakage
SHAHIN BADALY
09/14/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
SHAHIN BADALY
09/14/2022
Special inspection requirement — Fenestration areas
SHAHIN BADALY
09/14/2022
Special inspection requirement — Energy Code Compliance Inspections
SHAHIN BADALY
09/14/2022
Special inspection requirement — Fire-Resistance Rated Construction
SHAHIN BADALY
09/14/2022
Special inspection requirement — Insulation placement and R values
SHAHIN BADALY
09/14/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
SHAHIN BADALY
04/15/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/06/2022
Permit issued — Plumbing
B00586186-I1-PL
01/31/2022
Violation issued (ECB, closed)
Construction
01/26/2022
Violation issued (ECB, closed)
Construction
12/16/2021
Filed — Alteration
REPLACEMENT OF PLUMBING FIXTURES PER PLANS, NEW GAS APPLIANCES PER PLANS
B00586186-P1
11/12/2021
Filed — Alteration CO
ALTERATIONS AS PER PLANS. ALL EXISTING WINDOWS TO BE REPLACED WITH NEW. NEW ROOFING AND SIDING MATERIAL TO BE INSTALLED ON TOP EXISTING.
B00555720-P1
11/11/2021
Special inspection requirement — Fire-Resistance Rated Construction
SHAHIN BADALY
11/11/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
SHAHIN BADALY
11/11/2021
Special inspection requirement — Fenestration air leakage
SHAHIN BADALY
11/11/2021
Special inspection requirement — Fenestration areas
SHAHIN BADALY
11/11/2021
Special inspection requirement — Insulation placement and R values
SHAHIN BADALY
11/11/2021
Special inspection requirement — Fenestration and door U-factor and product ratings
SHAHIN BADALY
11/11/2021
Special inspection requirement — Energy Code Compliance Inspections
SHAHIN BADALY
10/12/2021
Permit issued — General Construction
B00555720-I1-GC
09/27/2021
Filed — Alteration
B00569825-I1
09/01/2021
Filed — Alteration
B00586185-I1
09/01/2021
Filed — Alteration
REPLACEMENT OF PLUMBING FIXTURES PER PLANS, NEW GAS APPLIANCES PER PLANS
B00586186-I1
08/11/2021
Filed — Alteration CO
ALTERATIONS AS PER PLANS. ALL EXISTING WINDOWS TO BE REPLACED WITH NEW. NEW ROOFING AND SIDING MATERIAL TO BE INSTALLED ON TOP EXISTING.
B00555720-I1
07/30/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/09/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/29/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/17/2014
Violation issued (ECB, closed)
Construction
01/17/2014
Violation issued (ECB, open)
Construction
Latest 60 of 65 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offMAMC CONSULTING REPS LLC04/12/2023
DOB NOWGeneral ConstructionPermit IssuedMAMC CONSULTING REPS LLC03/23/2023
DOB NOWPlumbingSigned-offDPH PLUMBING & HTG CORP04/06/2022
DOB NOWGeneral ConstructionPermit Issued2260 MAG CORP10/12/2021
BISOTISSUEDSHANE WALTERS08/11/2014
2 projects · most recent 05/20/2024
General Wiring
FiledStatusContractorScope
05/20/2024Permit Issued5 J'S ELECTL CONTS CORPGeneral Wiring
12/03/2021CompleteSKY ELECTRIC LLCGeneral Wiring
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
10/15/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/14/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/14/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
03/27/2023Pass-Final CND-Occupancy InspectionPassView ↗
03/16/2023Fail-Final CND-Occupancy InspectionFailView ↗
10/24/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/24/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/20/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/14/2022Pass-Final CND-Occupancy InspectionPassView ↗
10/12/2022Fail-Final CND-Occupancy InspectionFailView ↗
04/15/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 26
DateRequirementInspectorRole
10/14/2022Fire-Resistant Penetrations and JointsSHAHIN BADALYspecial
10/14/2022HVAC-R and service water heating equipmentSHAHIN BADALYenergy_progress
10/14/2022HVAC-R and service water heating system controlsSHAHIN BADALYenergy_progress
10/14/2022Permanent certificateSHAHIN BADALYenergy_progress
10/14/2022HVAC-R and service water piping design and insulationSHAHIN BADALYenergy_progress
09/16/2022Fenestration and door U-factor and product ratingsSHAHIN BADALYenergy_progress
09/16/2022Fire-Resistant Penetrations and JointsSHAHIN BADALYspecial
09/16/2022Energy Code Compliance InspectionsSHAHIN BADALYprogress
09/16/2022Fire-Resistance Rated ConstructionSHAHIN BADALYprogress
09/16/2022Fenestration areasSHAHIN BADALYenergy_progress
09/16/2022Fenestration air leakageSHAHIN BADALYenergy_progress
09/16/2022Insulation placement and R valuesSHAHIN BADALYenergy_progress
09/14/2022Fenestration air leakageSHAHIN BADALYenergy_progress
09/14/2022Fire-Resistant Penetrations and JointsSHAHIN BADALYspecial
09/14/2022Fenestration areasSHAHIN BADALYenergy_progress
09/14/2022Energy Code Compliance InspectionsSHAHIN BADALYprogress
09/14/2022Fire-Resistance Rated ConstructionSHAHIN BADALYprogress
09/14/2022Insulation placement and R valuesSHAHIN BADALYenergy_progress
09/14/2022Fenestration and door U-factor and product ratingsSHAHIN BADALYenergy_progress
11/11/2021Fire-Resistance Rated ConstructionSHAHIN BADALYprogress
11/11/2021Fire-Resistant Penetrations and JointsSHAHIN BADALYspecial
11/11/2021Fenestration air leakageSHAHIN BADALYenergy_progress
11/11/2021Fenestration areasSHAHIN BADALYenergy_progress
11/11/2021Insulation placement and R valuesSHAHIN BADALYenergy_progress
11/11/2021Fenestration and door U-factor and product ratingsSHAHIN BADALYenergy_progress
Latest 25 of 26.
▾Documents — 67 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
09/01/2026B00586185-I1Request digital key ↗
09/01/2026B00586186-P3Request digital key ↗
09/01/2026B00586186-P1Request digital key ↗
Showing 3 of 8 on file for this type
▸Applications & Permits3
▸BISPLAN / WORK APPROVAL APPLICATION2
04/10/2023320929616Open ↗
05/30/2014320929616Open ↗
▸BISWORK PERMIT APPLICATION1
08/12/2014320929616Open ↗
▸Seals & Professional Certifications37
▸DOB NOWProgress Inspector Seal & Signature22
09/30/2026B00555720-P2Open ↗
09/30/2026B00555720-P2Open ↗
09/30/2026B00555720-P2Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
09/01/2026B00586185-I1Open ↗
09/01/2026B00586186-P3Open ↗
09/01/2026B00586186-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/30/2026B00555720-P2Open ↗
09/14/2026B00555720-P1Open ↗
08/28/2026B00555720-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
05/30/2014320929616Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
05/30/2014320929616Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
05/30/2014320929616Open ↗
▸Safety & Tenant Protection5
▸DOB NOWStreet Tree Checklist3
08/13/2026B00555720-P2Open ↗
08/13/2026B00555720-P1Open ↗
08/13/2026B00555720-I1Open ↗
▸BISSTREET TREE CHECKLIST1
05/30/2014320929616Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00555720-I1Open ↗
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
09/01/2026B00586185-I1Open ↗
09/01/2026B00586186-P3Open ↗
09/01/2026B00586186-P1Open ↗
Showing 3 of 8 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
05/30/2014320929616Open ↗
▸Energy Compliance3
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026B00586186-I1Open ↗
08/13/2026B00586185-I1Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
05/30/2014320929616Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
05/30/2014320929616Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
05/30/2014320929616Open ↗