← Back
BRONX
856 EAST 223 STREET
BRONX · Williamsbridge-Olinville · BIN 2130970
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbing
Roof1p · 1 filing · 8 docs
Floor 351p · 1 filing · 20 docs
Floor 270p · 2 filings · 20 docs
Floor 164p · 3 filings · 20 docs
Sub-Basement15p · 1 filing · 8 docs
Site & exterior49p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
VUCINAJ203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
THOMAS J. CURRO ARCHITECT, PC804/03/2026
PARKER AND WEST ENGINEERING, PLLC103/18/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Younes Abouyaala PE303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PEEPS SERVICES INCGeneral Contractor1107/08/2026
B36 SERVICES INCGeneral Contractor303/21/2026
DOUG'S PLBG & HTG SERV COFire Protection107/08/2026
NEW LINE CONSTRUCTION LLCGeneral Contractor107/08/2026
SUNRUN INSTALLATION SVCGeneral Contractor104/09/2026
DOUG'S PLBG & HTG SERV COPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AA BUILDING & INSPECTION1519304/03/2026
PARKER AND WEST ENGINEERI5272103/18/2026
THOMAS J. CURRO ARCHITECT718309/11/2025
Building Lifecycle
All (115)Filed (9)Permit Issued (10)Signed Off (3)Inspection (11)Objection (52)Special Inspection (30)
06/26/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/25/2026
Signed off — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X01374409-I1
06/04/2026
Permit issued — Structural
X01049885-I1-FO
06/02/2026
Permit issued — Mechanical Systems
X01049885-I1-MS
05/26/2026
Signed off — Alteration
NEW 7 FOOT WIDE CURB CUT WITH (2) 1.5 FT. SPLAYS
X01057562-I1
05/22/2026
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
05/15/2026
Signed off — Alteration
PLUMBING AND SPRINKLER WORK FILED IN CONJUNCTION WITH DOBNOW JOB X01049885 FOR NEW 3 FAMILY DWELLING.
X01096662-I1
05/13/2026
Permit issued — Curb Cut
X01057562-I1-CC
05/06/2026
Special inspection requirement — Mechanical Systems
Younes Abouyaala
05/06/2026
Special inspection requirement — Masonry
Younes Abouyaala
05/06/2026
Special inspection requirement — Wood – Seismic Resistance
Younes Abouyaala
05/06/2026
Special inspection requirement — Footing and Foundation
Younes Abouyaala
05/06/2026
Special inspection requirement — Final
THOMAS CURRO
05/06/2026
Special inspection requirement — Ventilation and air distribution system
Younes Abouyaala
05/06/2026
Special inspection requirement — Fenestration air leakage
THOMAS CURRO
05/06/2026
Special inspection requirement — HVAC-R and service water heating system controls
Younes Abouyaala
05/06/2026
Special inspection requirement — Fenestration areas
THOMAS CURRO
05/06/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
THOMAS CURRO
05/06/2026
Special inspection requirement — Air barrier — testing
Younes Abouyaala
05/06/2026
Special inspection requirement — Insulation placement and R values
THOMAS CURRO
05/06/2026
Special inspection requirement — Permanent certificate
THOMAS CURRO
05/06/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Younes Abouyaala
05/06/2026
Special inspection requirement — Air barrier - visual inspection
THOMAS CURRO
05/06/2026
Special inspection requirement — HVAC-R and service water heating equipment
Younes Abouyaala
04/15/2026
Objection resolved — Resolved
04/14/2026
Objection raised — Zoning
04/03/2026
Filed — New Building
NEW 3 FAMILY DWELLING
X01049885-P4
04/03/2026
Special inspection requirement — Wood – Seismic Resistance
04/02/2026
Special inspection requirement — HVAC-R and service water heating system controls
Younes Abouyaala
04/02/2026
Special inspection requirement — Masonry
Younes Abouyaala
04/02/2026
Special inspection requirement — Mechanical Systems
Younes Abouyaala
04/02/2026
Special inspection requirement — Final
THOMAS CURRO
04/02/2026
Special inspection requirement — Footing and Foundation
Younes Abouyaala
04/02/2026
Special inspection requirement — Air barrier - visual inspection
THOMAS CURRO
04/02/2026
Special inspection requirement — Air barrier — testing
Younes Abouyaala
04/02/2026
Special inspection requirement — Insulation placement and R values
THOMAS CURRO
04/02/2026
Special inspection requirement — Fenestration air leakage
THOMAS CURRO
04/02/2026
Special inspection requirement — Fenestration areas
THOMAS CURRO
04/02/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
THOMAS CURRO
04/02/2026
Special inspection requirement — Permanent certificate
THOMAS CURRO
04/02/2026
Special inspection requirement — Ventilation and air distribution system
Younes Abouyaala
03/23/2026
Permit issued — Solar
X01374409-I1-SL
03/18/2026
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X01374409-I1
12/31/2025
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
12/23/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
12/19/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
12/19/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/23/2025
Filed — New Building
NEW 3 FAMILY DWELLING
X01049885-P3
09/11/2025
Filed — Alteration
PLUMBING AND SPRINKLER WORK FILED IN CONJUNCTION WITH DOBNOW JOB X01049885 FOR NEW 3 FAMILY DWELLING.
X01096662-P2
09/05/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/15/2025
Permit issued — Foundation
X01049885-I1-GC-CX
07/07/2025
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
06/23/2025
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
05/21/2025
Filed — Alteration
PLUMBING AND SPRINKLER WORK FILED IN CONJUNCTION WITH DOBNOW JOB X01049885 FOR NEW 3 FAMILY DWELLING.
X01096662-P1
04/24/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
04/24/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
04/09/2025
Permit issued — Foundation
X01049885-I1-GC-CX
04/03/2025
Permit issued — General Construction
X01049885-I1-FO
03/24/2025
Permit issued — Plumbing
X01096662-I1-PL
03/24/2025
Permit issued — Plumbing
X01096662-I1-EW-SP
Latest 60 of 115 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offPEEPS SERVICES INC06/04/2026
DOB NOWMechanical SystemsSigned-offPEEPS SERVICES INC06/02/2026
DOB NOWCurb CutSigned-offNEW LINE CONSTRUCTION LLC05/13/2026
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC03/23/2026
DOB NOWFoundationPermit IssuedPEEPS SERVICES INC08/15/2025
DOB NOWFoundationPermit IssuedPEEPS SERVICES INC04/09/2025
DOB NOWGeneral ConstructionSigned-offPEEPS SERVICES INC04/03/2025
DOB NOWPlumbingSigned-offDOUG'S PLBG & HTG SERV CO03/24/2025
DOB NOWPlumbingSigned-offDOUG'S PLBG & HTG SERV CO03/24/2025
DOB NOWMechanical SystemsSigned-offB36 SERVICES INC03/07/2025
1 project · most recent 04/03/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
04/03/2026Signed-offPEEPS SERVICES INCHeating and Air Conditioning Systems
Heat / Cool
General Electric AZ65H07DQC 11,800 BTU · Ptac ×24
1 project · most recent 09/11/2025
FiledStatusContractorScope
09/11/2025Signed-offDOUG'S PLBG & HTG SERV CO45 heads
1 project · most recent 09/11/2025
Storm Water/Sanitary
FiledStatusContractorScope
09/11/2025Signed-offDOUG'S PLBG & HTG SERV COStorm, Water/Sanitary
2 projects · most recent 03/18/2026
General Wiring
FiledStatusContractorScope
03/18/2026CompleteSUNRUN SOLAR ELECTL CORP—
09/02/2025CompleteDENNISON ELECTRIC CORPGeneral Wiring
1 project · most recent 04/03/2026
Masonry Wood
FiledStatusContractorScope
04/03/2026Signed-offPEEPS SERVICES INCMasonry, Wood
1 project · most recent 03/18/2026
FiledStatusContractorScope
03/18/2026Signed-offSUNRUN INSTALLATION SVC10 panels, 4.1 kw, 210 roof_area_sqft
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
06/26/2026Pass-Final CND-Occupancy InspectionPassView ↗
05/22/2026Pass-Final Curb Cut Non-Directive 14PassView ↗
12/31/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
12/23/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/19/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/19/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/05/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/07/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
06/23/2025Pass-Final PL - UndergroundPassView ↗
04/24/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
04/24/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 55
DateRequirementInspectorRole
05/06/2026Mechanical SystemsYounes Abouyaalaspecial
05/06/2026MasonryYounes Abouyaalaspecial
05/06/2026Wood – Seismic ResistanceYounes Abouyaalaspecial
05/06/2026Footing and FoundationYounes Abouyaalaprogress
05/06/2026FinalTHOMAS CURROprogress
05/06/2026Ventilation and air distribution systemYounes Abouyaalaenergy_progress
05/06/2026Fenestration air leakageTHOMAS CURROenergy_progress
05/06/2026HVAC-R and service water heating system controlsYounes Abouyaalaenergy_progress
05/06/2026Fenestration areasTHOMAS CURROenergy_progress
05/06/2026Fenestration and door U-factor and product ratingsTHOMAS CURROenergy_progress
05/06/2026Air barrier — testing Younes Abouyaalaenergy_progress
05/06/2026Insulation placement and R valuesTHOMAS CURROenergy_progress
05/06/2026Permanent certificateTHOMAS CURROenergy_progress
05/06/2026HVAC-R and service water piping design and insulationYounes Abouyaalaenergy_progress
05/06/2026Air barrier - visual inspectionTHOMAS CURROenergy_progress
05/06/2026HVAC-R and service water heating equipmentYounes Abouyaalaenergy_progress
04/03/2026Wood – Seismic Resistance—special
04/02/2026HVAC-R and service water heating system controlsYounes Abouyaalaenergy_progress
04/02/2026MasonryYounes Abouyaalaspecial
04/02/2026Mechanical SystemsYounes Abouyaalaspecial
04/02/2026FinalTHOMAS CURROprogress
04/02/2026Footing and FoundationYounes Abouyaalaprogress
04/02/2026Air barrier - visual inspectionTHOMAS CURROenergy_progress
04/02/2026Air barrier — testing Younes Abouyaalaenergy_progress
04/02/2026Insulation placement and R valuesTHOMAS CURROenergy_progress
Latest 25 of 55.
▾Documents — 115 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/26/2026X01374409-I1Request digital key ↗
08/21/2026X01057562-I1Request digital key ↗
08/18/2026X01096662-P2Request digital key ↗
Showing 3 of 9 on file for this type
▸Zoning, Tax Lot & Property Records12
▸DOB NOWZD1: DOB Zoning Diagram4
08/13/2026X01049885-P4Open ↗
08/13/2026X01049885-I1Open ↗
08/13/2026X01049885-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWZoning Exhibit form (1-5)4
08/13/2026X01049885-P3Open ↗
08/13/2026X01049885-I1Open ↗
08/13/2026X01049885-P4Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp3
08/13/2026X01049885-P1Open ↗
08/13/2026X01049885-I1Open ↗
08/13/2026X01049885-P3Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
11/25/2024240359688Open ↗
▸Seals & Professional Certifications63
▸DOB NOWProgress Inspector Seal & Signature42
08/28/2026X01049885-P3Open ↗
08/28/2026X01049885-P3Open ↗
08/28/2026X01049885-P3Open ↗
Showing 3 of 42 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature11
09/01/2026X01096662-P1Open ↗
08/28/2026X01049885-P3Open ↗
08/28/2026X01049885-P3Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/26/2026X01374409-I1Open ↗
08/18/2026X01096662-P1Open ↗
08/18/2026X01096662-I1Open ↗
Showing 3 of 9 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
10/25/2024240359688Open ↗
▸Trade Schedules & Equipment3
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/13/2026X01049885-P3Open ↗
08/13/2026X01049885-P1Open ↗
08/13/2026X01049885-I1Open ↗
▸Safety & Tenant Protection9
▸DOB NOWStreet Tree Checklist4
08/13/2026X01049885-P4Open ↗
08/13/2026X01049885-P3Open ↗
08/13/2026X01049885-P1Open ↗
Showing 3 of 4 on file for this type
▸BISBPP: STREET TREES SITE PLAN1
11/25/2024240359688Open ↗
▸BISSTREET TREE CHECKLIST1
11/25/2024240359688Open ↗
▸DOB NOWStreet Tree Sign Off1
08/17/2026X01049885-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026X01049885-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/17/2026X01049885-I1Open ↗
▸Inspections & Test Reports4
▸DOB NOWSOIL REPORT4
08/13/2026X01049885-P1Open ↗
08/13/2026X01049885-P3Open ↗
08/13/2026X01049885-I1Open ↗
Showing 3 of 4 on file for this type
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/26/2026X01374409-I1Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
10/25/2024240359688Open ↗
▸Other Documents13
▸DOB NOWSite Survey: Initial4
08/13/2026X01049885-P3Open ↗
08/13/2026X01049885-I1Open ↗
08/13/2026X01049885-P4Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/13/2026X01049885-P1Open ↗
08/13/2026X01049885-P4Open ↗
08/13/2026X01049885-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProperty Ownership Certification4
08/17/2026X01049885-P4Open ↗
08/17/2026X01049885-P3Open ↗
08/17/2026X01049885-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWFinal Survey1
08/13/2026X01049885-I1Open ↗