← Back
Four families
857 46 STREET
BROOKLYN · BIN 3341149
💬 Discuss this project
1925Year Built
2Stories
C3Building Class
R6Zoning
2,747 sfGross Floor Area
4Units
0 Open ViolationsFDNY Report ↗
Four families · 2,955 sf lot · 0.93 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CITY BUILDING NY ARCHITECT P.C.208/15/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Y & W NY CONSTRUCTION INCGeneral Contractor207/08/2026
AAA TOTAL PLUMBING, INCPlumbing107/08/2026
Building Lifecycle
All (15)Filed (2)Permit Issued (3)Signed Off (2)Violation (2)Inspection (2)Objection (4)
01/09/2024
Signed off — Alteration
To file PL plumbing work in conjunction with DOB Now Build application job#B00913093. Remedy ECB violations 39091065K and 39091066M. Remove and cap plumbing fixtures. Restore the garage back to prior legal condition. No change in use, egress or occupancy
B00913106-I1
01/05/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
01/03/2024
Signed off — Alteration
Remedy ECB violations 39091065K and 39091066M. Restore the existing garage door. Remove illegal partitions and elect cooking range. Restore the garage back to prior legal condition. No change in use, egress or occupancy under this application
B00913093-I1
12/29/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
12/19/2023
Permit issued — Plumbing
B00913106-I1-PL
10/24/2023
Permit issued — General Construction
B00913093-I1-GC
09/19/2023
Permit issued — General Construction
B00913093-I1-GC
08/22/2023
Violation issued (ECB, closed)
Unknown
08/15/2023
Filed — Alteration
To file PL plumbing work in conjunction with DOB Now Build application job#B00913093. Remedy ECB violations 39091065K and 39091066M. Remove and cap plumbing fixtures. Restore the garage back to prior legal condition. No change in use, egress or occupancy
B00913106-I1
08/15/2023
Objection resolved — Addressed
08/15/2023
Objection resolved — Addressed
08/14/2023
Objection raised — Scope
08/14/2023
Objection raised — Scope
08/09/2023
Filed — Alteration
Remedy ECB violations 39091065K and 39091066M. Restore the existing garage door. Remove illegal partitions and elect cooking range. Restore the garage back to prior legal condition. No change in use, egress or occupancy under this application
B00913093-I1
07/26/2023
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offAAA TOTAL PLUMBING, INC12/19/2023
DOB NOWGeneral ConstructionSigned-offY & W NY CONSTRUCTION INC10/24/2023
DOB NOWGeneral ConstructionSigned-offY & W NY CONSTRUCTION INC09/19/2023
1 project · most recent 09/15/2023
General Wiring
FiledStatusContractorScope
09/15/2023CompleteKWONG MING ELECTRIC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
01/05/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/29/2023Pass-Final General Construction Non-Directive 14PassView ↗
▾Documents — 6 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/27/2026B00913106-I1Request digital key ↗
08/15/2026B00913093-I1Request digital key ↗
▸Seals & Professional Certifications2
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/13/2026B00913093-I1Open ↗
08/13/2026B00913106-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/13/2026B00913093-I1Open ↗
08/13/2026B00913106-I1Open ↗