← Back
Two family brick
857 BAY RIDGE AVENUE
BROOKLYN · Dyker Heights · BIN 3143015
💬 Discuss this project
1925Year Built
2Stories
B1Building Class
R5BZoning
2,520 sfGross Floor Area
2Units
Two family brick · Owner of record: CJ & S WANG ESTATE LLC · 3,091 sf lot · 0.82 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 26p · 2 filings · 20 docs
Floor 17p · 2 filings · 20 docs
Basement1p · 1 filing · 20 docs
Sub-Basement6p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SD DESIGN STUDIO1907/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/28/2021$1.2M—Private party → CJ & S WANG ESTATE LLC$496/sf building
06/28/2021$1.2M—Private party → CJ & S WANG ESTATE LLC$496/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JIMENEZ BUILDING CONSULTING LLC706/02/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JRL SKYLINE1403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MES CONSTRUCTION CORPPlumbing707/08/2026
WINWAY DEVELOPMENT LLCGeneral Contractor307/08/2026
JIAN YANG YUElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SD TESTING & INSPECTION S7010206/02/2022
JIMENEZ BUILDING CONSULTI7944512/01/2021
Building Lifecycle
All (47)Filed (7)Permit Issued (3)Signed Off (1)Inspection (6)Special Inspection (30)
06/06/2022
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
06/02/2022
Filed — Alteration
PROPOSED INTERIOR RENOVATION ON BASEMENT, 1ST TO 2ND FLOOR. FLOORING, CEILING, PARTITIONS WORKS AS PER PLAN. NO CHANGE IN USE, BULK, EGRESS OR OCCUPANCY.
B00559651-P3
06/02/2022
Special inspection requirement — Energy Code Compliance Inspections
XIUCHENG LI
06/02/2022
Special inspection requirement — Fire-Resistance Rated Construction
XIUCHENG LI
06/02/2022
Special inspection requirement — Maintenance information
XIUCHENG LI
06/02/2022
Special inspection requirement — Interior lighting power
XIUCHENG LI
06/02/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIUCHENG LI
02/24/2022
Signed off — Alteration
PROPOSED INTERIOR RENOVATION ON BAS, 1ST THRU. 2ND FLOOR. PLUMBING & GAS WORKS AS PER PLAN. GENERAL CONSTRUCTION WORK UNDER JOB #: B00559651. NO CHANGE IN USE, BULK, EGRESS OR OCCUPANCY.
B00560349-I1
12/28/2021
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
12/23/2021
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
12/21/2021
Permit issued — General Construction
B00559651-I1-GC
12/03/2021
Special inspection requirement — Energy Code Compliance Inspections
ALEXANDER JIMENEZ
12/03/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
ALEXANDER JIMENEZ
12/03/2021
Special inspection requirement — HVAC-R and service water heating system controls
ALEXANDER JIMENEZ
12/03/2021
Special inspection requirement — Maintenance information
ALEXANDER JIMENEZ
12/03/2021
Special inspection requirement — HVAC-R and service water heating equipment
ALEXANDER JIMENEZ
12/03/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALEXANDER JIMENEZ
12/01/2021
Filed — Alteration
PROPOSED INTERIOR RENOVATION ON BAS, 1ST THRU. 2ND FLOOR. PLUMBING & GAS WORKS AS PER PLAN. GENERAL CONSTRUCTION WORK UNDER JOB #: B00559651. NO CHANGE IN USE, BULK, EGRESS OR OCCUPANCY.
B00560349-P2
12/01/2021
Special inspection requirement — Energy Code Compliance Inspections
ALEXANDER JIMENEZ
12/01/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALEXANDER JIMENEZ
12/01/2021
Special inspection requirement — HVAC-R and service water heating equipment
ALEXANDER JIMENEZ
12/01/2021
Special inspection requirement — Maintenance information
ALEXANDER JIMENEZ
12/01/2021
Special inspection requirement — HVAC-R and service water heating system controls
ALEXANDER JIMENEZ
12/01/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
ALEXANDER JIMENEZ
11/29/2021
Filed — Alteration
PROPOSED INTERIOR RENOVATION ON BASEMENT, 1ST TO 2ND FLOOR. FLOORING, CEILING, PARTITIONS WORKS AS PER PLAN. NO CHANGE IN USE, BULK, EGRESS OR OCCUPANCY.
B00559651-P2
11/26/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALEXANDER JIMENEZ
11/26/2021
Special inspection requirement — Energy Code Compliance Inspections
ALEXANDER JIMENEZ
11/26/2021
Special inspection requirement — Fire-Resistance Rated Construction
ALEXANDER JIMENEZ
11/26/2021
Special inspection requirement — Maintenance information
ALEXANDER JIMENEZ
11/26/2021
Special inspection requirement — Interior lighting power
ALEXANDER JIMENEZ
09/24/2021
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
09/24/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/24/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
09/18/2021
Filed — Alteration
PROPOSED INTERIOR RENOVATION ON BASEMENT, 1ST TO 2ND FLOOR. FLOORING, CEILING, PARTITIONS WORKS AS PER PLAN. NO CHANGE IN USE, BULK, EGRESS OR OCCUPANCY.
B00559651-P1
09/18/2021
Filed — Alteration
PROPOSED INTERIOR RENOVATION ON BAS, 1ST THRU. 2ND FLOOR. PLUMBING & GAS WORKS AS PER PLAN. GENERAL CONSTRUCTION WORK UNDER JOB #: B00559651. NO CHANGE IN USE, BULK, EGRESS OR OCCUPANCY.
B00560349-P1
09/18/2021
Special inspection requirement — HVAC-R and service water heating system controls
ALEXANDER JIMENEZ
09/18/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALEXANDER JIMENEZ
09/18/2021
Special inspection requirement — Energy Code Compliance Inspections
ALEXANDER JIMENEZ
09/18/2021
Special inspection requirement — HVAC-R and service water heating equipment
ALEXANDER JIMENEZ
09/18/2021
Special inspection requirement — Maintenance information
ALEXANDER JIMENEZ
09/18/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
ALEXANDER JIMENEZ
09/15/2021
Special inspection requirement — Maintenance information
ALEXANDER JIMENEZ
09/15/2021
Special inspection requirement — Interior lighting power
ALEXANDER JIMENEZ
07/27/2021
Permit issued — Plumbing
B00560349-I1-PL
07/23/2021
Permit issued — General Construction
B00559651-I1-GC
07/20/2021
Filed — Alteration
PROPOSED INTERIOR RENOVATION ON BAS, 1ST THRU. 2ND FLOOR. PLUMBING & GAS WORKS AS PER PLAN. GENERAL CONSTRUCTION WORK UNDER JOB #: B00559651. NO CHANGE IN USE, BULK, EGRESS OR OCCUPANCY.
B00560349-I1
07/20/2021
Filed — Alteration
PROPOSED INTERIOR RENOVATION ON BASEMENT, 1ST TO 2ND FLOOR. FLOORING, CEILING, PARTITIONS WORKS AS PER PLAN. NO CHANGE IN USE, BULK, EGRESS OR OCCUPANCY.
B00559651-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offWINWAY DEVELOPMENT LLC12/21/2021
DOB NOWPlumbingSigned-offMES CONSTRUCTION CORP07/27/2021
DOB NOWGeneral ConstructionSigned-offWINWAY DEVELOPMENT LLC07/23/2021
1 project · most recent 07/29/2021
General Wiring
FiledStatusContractorScope
07/29/2021CompleteJ Y ELECTRIC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
06/06/2022Pass-Final General Construction Non-Directive 14PassView ↗
12/28/2021Fail-Final PL - Up to 3 Requested FloorsFailView ↗
12/23/2021Fail-Final General Construction Non-Directive 14FailView ↗
09/24/2021Certified Gas-Gas-Piping-RoughingCertifiedView ↗
09/24/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/24/2021Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 33
DateRequirementInspectorRole
06/02/2022Energy Code Compliance InspectionsXIUCHENG LIprogress
06/02/2022Fire-Resistance Rated ConstructionXIUCHENG LIprogress
06/02/2022Maintenance informationXIUCHENG LIenergy_progress
06/02/2022Interior lighting powerXIUCHENG LIenergy_progress
06/02/2022Fire-Resistant Penetrations and JointsXIUCHENG LIspecial
12/03/2021Energy Code Compliance InspectionsALEXANDER JIMENEZprogress
12/03/2021HVAC-R and service water piping design and insulationALEXANDER JIMENEZenergy_progress
12/03/2021HVAC-R and service water heating system controlsALEXANDER JIMENEZenergy_progress
12/03/2021Maintenance informationALEXANDER JIMENEZenergy_progress
12/03/2021HVAC-R and service water heating equipmentALEXANDER JIMENEZenergy_progress
12/03/2021Fire-Resistant Penetrations and JointsALEXANDER JIMENEZspecial
12/01/2021Energy Code Compliance InspectionsALEXANDER JIMENEZprogress
12/01/2021Fire-Resistant Penetrations and JointsALEXANDER JIMENEZspecial
12/01/2021HVAC-R and service water heating equipmentALEXANDER JIMENEZenergy_progress
12/01/2021Maintenance informationALEXANDER JIMENEZenergy_progress
12/01/2021HVAC-R and service water heating system controlsALEXANDER JIMENEZenergy_progress
12/01/2021HVAC-R and service water piping design and insulationALEXANDER JIMENEZenergy_progress
11/26/2021Fire-Resistant Penetrations and JointsALEXANDER JIMENEZspecial
11/26/2021Energy Code Compliance InspectionsALEXANDER JIMENEZprogress
11/26/2021Fire-Resistance Rated ConstructionALEXANDER JIMENEZprogress
11/26/2021Maintenance informationALEXANDER JIMENEZenergy_progress
11/26/2021Interior lighting powerALEXANDER JIMENEZenergy_progress
09/18/2021HVAC-R and service water heating system controlsALEXANDER JIMENEZenergy_progress
09/18/2021Fire-Resistant Penetrations and JointsALEXANDER JIMENEZspecial
09/18/2021Energy Code Compliance InspectionsALEXANDER JIMENEZprogress
Latest 25 of 33.
▾Documents — 41 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
09/01/2026B00560349-P1Request digital key ↗
09/01/2026B00560349-I1Request digital key ↗
09/01/2026B00560349-P2Request digital key ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications25
▸DOB NOWProgress Inspector Seal & Signature12
09/13/2026B00560349-I1Open ↗
09/13/2026B00560349-I1Open ↗
09/01/2026B00559651-P3Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
09/01/2026B00560349-I1Open ↗
09/01/2026B00560349-P2Open ↗
09/01/2026B00560349-P1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/13/2026B00560349-I1Open ↗
09/01/2026B00559651-P3Open ↗
09/01/2026B00559651-P1Open ↗
Showing 3 of 6 on file for this type
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
09/01/2026B00560349-I1Open ↗
09/01/2026B00560349-P2Open ↗
09/01/2026B00560349-P1Open ↗
Showing 3 of 7 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
09/01/2026B00559651-I1Open ↗
08/13/2026B00560349-I1Open ↗