Office with commercial, 1-6 stories
Park Builders
858 EAST 29TH STREET · BIN 3206416
💬 Discuss this project
2010Year Built
5Stories
O5Building Class
R4Zoning
31,875 sfGross Floor Area
1Units
LL97 Covered0 Active Violations 1 old, status unconfirmed ▸FDNY Report ↗
Office with commercial, 1-6 stories · Owner of record: Nesie Acquisition Co · 12,000 sf lot · 2.66 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire Protection
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofIvdu Boys SchoolUnder Construction8p · 2 filings · 12 docs
BulkheadIvdu Boys School2p · 1 filing · 8 docs
Floor 5Ivdu Boys SchoolUnder Construction81p · 2 filings · 12 docs
Floor 4Ivdu Boys SchoolUnder Construction79p · 2 filings · 12 docs
Floor 3Ivdu Boys SchoolUnder Construction80p · 2 filings · 12 docs
Floor 2Ivdu Boys SchoolUnder Construction80p · 2 filings · 12 docs
Floor 1Ivdu Boys SchoolUnder Construction79p · 3 filings · 12 docs
CellarIvdu Boys SchoolUnder Construction81p · 2 filings · 12 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Park Developers BLDS3610/13/2026
Nesie Aqusition Company1303/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Expediter Group1603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Park Premium EnterprisesGeneral Contractor406/28/2026
A. M. Plumbing CompanyPlumbing207/08/2026
S & J IndustrialFire Protection207/25/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF Services56161209/15/2026
Building Lifecycle
All (137)Filed (13)Permit Issued (8)Signed Off (3)Violation (20)Inspection (12)Objection (51)Special Inspection (30)
09/23/2026
Special inspection requirement — Fire-Resistance Rated Construction
SHAHRIAR QUAYYUM
09/23/2026
Special inspection requirement — Energy Code Compliance Inspections
SHAHRIAR QUAYYUM
09/23/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SHAHRIAR QUAYYUM
09/23/2026
Special inspection requirement — Lighting controls
SHAHRIAR QUAYYUM
09/23/2026
Special inspection requirement — Exterior lighting power
SHAHRIAR QUAYYUM
09/23/2026
Special inspection requirement — Maintenance information
SHAHRIAR QUAYYUM
09/23/2026
Special inspection requirement — Electrical motors and elevators
SHAHRIAR QUAYYUM
09/23/2026
Special inspection requirement — Interior lighting power
SHAHRIAR QUAYYUM
09/15/2026
Filed — Alteration CO
PROPOSED STRUCTURAL PLANS FILED HEREWITH.
B01320240-P5
09/09/2026
Filed — Alteration CO
PROPOSED STRUCTURAL PLANS FILED HEREWITH.
B01320240-P4
09/08/2026
Special inspection requirement — Electrical motors and elevators
SHAHRIAR QUAYYUM
09/08/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SHAHRIAR QUAYYUM
09/08/2026
Special inspection requirement — Maintenance information
SHAHRIAR QUAYYUM
09/08/2026
Special inspection requirement — Lighting controls
SHAHRIAR QUAYYUM
09/08/2026
Special inspection requirement — Exterior lighting power
SHAHRIAR QUAYYUM
09/08/2026
Special inspection requirement — Interior lighting power
SHAHRIAR QUAYYUM
09/08/2026
Special inspection requirement — Fire-Resistance Rated Construction
SHAHRIAR QUAYYUM
09/08/2026
Special inspection requirement — Energy Code Compliance Inspections
SHAHRIAR QUAYYUM
08/27/2026
Special inspection requirement — Energy Code Compliance Inspections
SHAHRIAR QUAYYUM
08/27/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SHAHRIAR QUAYYUM
08/27/2026
Special inspection requirement — HVAC-R and service water heating system controls
SHAHRIAR QUAYYUM
08/27/2026
Special inspection requirement — Maintenance information
SHAHRIAR QUAYYUM
08/27/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
SHAHRIAR QUAYYUM
08/27/2026
Special inspection requirement — HVAC-R and service water heating equipment
SHAHRIAR QUAYYUM
08/14/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
08/14/2026
Inspection — Certified Sprinkler (SP) - Booster Pump Test
Certified
View inspection ↗
08/14/2026
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
08/10/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/31/2026
Inspection — Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve Test
Certified
View inspection ↗
07/31/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
07/31/2026
Inspection — Certified StandPipe-Fire Pump (SD)-Fire Pump Test
Certified
View inspection ↗
07/31/2026
Inspection — Certified StandPipe-SD-Fixtures-Finish-SD
Certified
View inspection ↗
07/31/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/29/2026
Signed off — Alteration
PROPOSED INTERIOR RENOVATION TO EXISTING CELLAR AND 5 STORY COMMUNITY FACILITY BUILDING. PARTITIONS AS PER PLAN. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
B01312914-I1
07/28/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SHAHRIAR QUAYYUM
07/28/2026
Special inspection requirement — Post-installed Anchors
SHAHRIAR QUAYYUM
07/28/2026
Special inspection requirement — Standpipe Systems
SHAHRIAR QUAYYUM
07/28/2026
Special inspection requirement — Sprinkler Systems
SHAHRIAR QUAYYUM
07/24/2026
Filed — Alteration CO
PROPOSED STRUCTURAL PLANS FILED HEREWITH.
B01320240-P3
07/23/2026
Permit issued — Standpipe
B01320240-S6-EW-SD
07/21/2026
Signed off — Alteration CO
PROPOSED STRUCTURAL PLANS FILED HEREWITH.
B01320240-S5
07/20/2026
Special inspection requirement — Standpipe Systems
SHAHRIAR QUAYYUM
07/20/2026
Special inspection requirement — Sprinkler Systems
SHAHRIAR QUAYYUM
07/20/2026
Special inspection requirement — Post-installed Anchors
SHAHRIAR QUAYYUM
07/20/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SHAHRIAR QUAYYUM
07/14/2026
Signed off — Alteration CO
PROPOSED STRUCTURAL PLANS FILED HEREWITH.
B01320240-S4
07/14/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
06/29/2026
Objection resolved — Addressed
06/22/2026
Filed — Alteration
PROPOSED INTERIOR RENOVATION TO EXISTING CELLAR AND 5 STORY COMMUNITY FACILITY BUILDING. PARTITIONS AS PER PLAN. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
B01312914-P1
06/18/2026
Objection resolved — Addressed
06/16/2026
Objection raised — Other
06/16/2026
Objection raised — Other
06/10/2026
Filed — Alteration CO
PROPOSED STRUCTURAL PLANS FILED HEREWITH.
B01320240-P2
06/08/2026
Permit issued — General Construction
B01320240-I1-GC
05/29/2026
Permit issued — Sprinklers
B01320240-S6-EW-SP
03/12/2026
Filed — Alteration CO
PROPOSED STRUCTURAL PLANS FILED HEREWITH.
B01320240-P1
03/12/2026
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
03/12/2026
Objection resolved — Addressed
03/06/2026
Permit issued — Mechanical Systems
B01320240-S4-MS
03/03/2026
Objection raised — Electrical
Latest 60 of 137 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStandpipePermit IssuedS & J Industrial07/23/2026
DOB NOWGeneral ConstructionPermit IssuedPark Premium Enterprises06/08/2026
DOB NOWSprinklersPermit IssuedS & J Industrial05/29/2026
DOB NOWMechanical SystemsSigned-offPark Premium Enterprises03/06/2026
DOB NOWStructuralSigned-offPark Premium Enterprises03/02/2026
DOB NOWPlumbingPermit IssuedA. M. Plumbing Company01/12/2026
DOB NOWPlumbingPermit IssuedA. M. Plumbing Company12/16/2025
DOB NOWGeneral ConstructionSigned-offPark Premium Enterprises11/26/2025
BISPLISSUEDHeadquarters Mechanical04/09/2010
BISSPISSUEDPrecision Plumbing Services03/29/2010
BISPLISSUEDHeadquarters Mechanical03/04/2010
BISMHISSUEDPark Premium Enterprises03/04/2010
BISOTISSUEDPark Premium Enterprises11/06/2009
BIS—ISSUEDPark Premium Enterprises11/04/2009
BISMHISSUEDPark Premium Enterprises11/04/2009
BISEQISSUEDPowers Bridging & Scaffolding04/01/2009
BIS—ISSUEDPark Premium Enterprises12/11/2008
BISEQISSUEDPowers Bridging & Scaffolding09/18/2008
BISMHISSUEDPark Premium Enterprises08/05/2008
BISEQISSUEDPark Premium Enterprises07/30/2008
BISOTISSUEDPark Premium Enterprises07/30/2008
BIS—ISSUEDPark Premium Enterprises07/24/2008
1 project · most recent 09/15/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
09/15/2026Permit IssuedPark Premium EnterprisesHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Daikin REYQ120AATJB 120,000 BTU · Vrf Outdoor ×5
REYQ144AATJB 144,000 BTU · Vrf Outdoor ×4
REYQ168AATJB 168,000 BTU · Vrf Outdoor ×2
REYQ72XATJA 72,000 BTU · Vrf Outdoor ×1
REYQ72XATJB 72,000 BTU · Vrf Outdoor ×1
REYQ96AATJB 96,000 BTU · Vrf Outdoor ×1
RXTA24AAVJU 23,000 BTU · Vrf Outdoor ×1
Ventilation
Renewaire HE3XRT 2,350 BTU · Erv ×3
HE1.5XRT 975 CFM · Erv ×1
HE4XRT 3,050 CFM · Erv ×1
NA 325 CFM · Erv ×1
1 project · most recent 09/15/2026
Sprinkler System
FiledStatusContractorScope
09/15/2026Permit IssuedS & J IndustrialSprinkler System
1 project · most recent 09/15/2026
Gas Water/Sanitary
FiledStatusContractorScope
09/15/2026Permit IssuedMainstreet Works CLSGas, Water/Sanitary
2 projects · most recent 08/19/2026
General Wiring
FiledStatusContractorScope
08/19/2026Permit IssuedMetro Electrical ContractorsGeneral Wiring
05/13/2026CompleteMetro Electrical Contractors—
1 project · most recent 09/15/2026
Steel Concrete
FiledStatusContractorScope
09/15/2026Permit IssuedS & J IndustrialSteel, Concrete
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
08/14/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/14/2026Certified Sprinkler (SP) - Booster Pump TestCertifiedView ↗
08/14/2026Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
08/10/2026Pass-Final CND-Occupancy InspectionPassView ↗
07/31/2026Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve TestCertifiedView ↗
07/31/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/31/2026Certified StandPipe-Fire Pump (SD)-Fire Pump TestCertifiedView ↗
07/31/2026Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
07/31/2026Pass-Final CND-Occupancy InspectionPassView ↗
07/14/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/12/2026Pass-Final PL - UndergroundPassView ↗
01/16/2026Pass-Final PL - Up to 9 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 75
DateRequirementInspectorRole
09/23/2026Fire-Resistant Penetrations and JointsSHAHRIAR QUAYYUMspecial
09/23/2026Interior lighting powerSHAHRIAR QUAYYUMenergy_progress
09/23/2026Exterior lighting powerSHAHRIAR QUAYYUMenergy_progress
09/23/2026Lighting controlsSHAHRIAR QUAYYUMenergy_progress
09/23/2026Maintenance informationSHAHRIAR QUAYYUMenergy_progress
09/23/2026Electrical motors and elevatorsSHAHRIAR QUAYYUMenergy_progress
09/23/2026Fire-Resistance Rated ConstructionSHAHRIAR QUAYYUMprogress
09/23/2026Energy Code Compliance InspectionsSHAHRIAR QUAYYUMprogress
09/08/2026Energy Code Compliance InspectionsSHAHRIAR QUAYYUMprogress
09/08/2026Maintenance informationSHAHRIAR QUAYYUMenergy_progress
09/08/2026Electrical motors and elevatorsSHAHRIAR QUAYYUMenergy_progress
09/08/2026Interior lighting powerSHAHRIAR QUAYYUMenergy_progress
09/08/2026Exterior lighting powerSHAHRIAR QUAYYUMenergy_progress
09/08/2026Lighting controlsSHAHRIAR QUAYYUMenergy_progress
09/08/2026Fire-Resistant Penetrations and JointsSHAHRIAR QUAYYUMspecial
09/08/2026Fire-Resistance Rated ConstructionSHAHRIAR QUAYYUMprogress
08/27/2026Fire-Resistant Penetrations and JointsSHAHRIAR QUAYYUMspecial
08/27/2026Energy Code Compliance InspectionsSHAHRIAR QUAYYUMprogress
08/27/2026HVAC-R and service water heating equipmentSHAHRIAR QUAYYUMenergy_progress
08/27/2026HVAC-R and service water piping design and insulationSHAHRIAR QUAYYUMenergy_progress
08/27/2026Maintenance informationSHAHRIAR QUAYYUMenergy_progress
08/27/2026HVAC-R and service water heating system controlsSHAHRIAR QUAYYUMenergy_progress
07/28/2026Fire-Resistant Penetrations and JointsSHAHRIAR QUAYYUMspecial
07/28/2026Sprinkler SystemsSHAHRIAR QUAYYUMspecial
07/28/2026Post-installed AnchorsSHAHRIAR QUAYYUMspecial
Latest 25 of 75.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Ivdu Boys SchoolEducationCellar, Floors 1–5, Roof
Project B01320240 Alteration CO · Permit Entire · 12/09/2025
Project B01312914 Alteration · LOC Issued · 11/14/2025
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 175 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch10
08/19/2026B01312914-I1Request digital key ↗
08/19/2026B01312914-P1Request digital key ↗
08/16/2026B01320240-P1Request digital key ↗
Showing 3 of 10 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly1
08/14/2026B01352424-I1Request digital key ↗
▸Applications & Permits21
▸BISWORK PERMIT APPLICATION11
04/12/2010320065166Open ↗
03/30/2010320065166Open ↗
03/05/2010320081040Open ↗
Showing 3 of 11 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION10
08/31/2010320081040Open ↗
08/10/2010320081040Open ↗
07/26/2010320065166Open ↗
Showing 3 of 10 on file for this type
▸Seals & Professional Certifications59
▸DOB NOWProgress Inspector Seal & Signature18
09/26/2026B01320240-I1Open ↗
09/26/2026B01320240-I1Open ↗
09/23/2026B01320240-P4Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature13
09/23/2026B01320240-P5Open ↗
09/23/2026B01320240-P4Open ↗
08/19/2026B01312914-P1Open ↗
Showing 3 of 13 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION12
01/03/2011320065166Open ↗
11/04/2010320065166Open ↗
08/26/2010310171612Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
09/26/2026B01320240-I1Open ↗
09/23/2026B01320240-P4Open ↗
09/23/2026B01320240-P5Open ↗
Showing 3 of 12 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
07/24/2008310170784Open ↗
07/22/2008310171612Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
07/24/2008310170784Open ↗
07/22/2008310171612Open ↗
▸Trade Schedules & Equipment30
▸BISSELF-CERT PLUMBING NOTICE6
01/07/2011320065166Open ↗
01/07/2011320065166Open ↗
11/03/2010320065166Open ↗
Showing 3 of 6 on file for this type
▸BISRPZ/DDCV TEST REPORT : GEN215B5
01/07/2011320065166Open ↗
01/07/2011320065166Open ↗
01/07/2011320065166Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE B - PLUMBING5
08/31/2010320081040Open ↗
08/10/2010320081040Open ↗
07/26/2010320065166Open ↗
Showing 3 of 5 on file for this type
▸BISSEWER CUT-OFF4
01/07/2011320065166Open ↗
01/07/2011320065166Open ↗
01/06/2011320081040Open ↗
Showing 3 of 4 on file for this type
▸BISWATER METER PERMIT : DEP-METER4
01/07/2011320065166Open ↗
01/07/2011320065166Open ↗
01/06/2011320081040Open ↗
Showing 3 of 4 on file for this type
▸BISSPRINKLER INSP REPORT : FP-851
01/07/2011320065166Open ↗
▸BISEQUIPMENT USE PERMITS1
01/10/2011320081040Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
10/06/2010320133084Open ↗
▸BISWATER CUT-OFF1
01/07/2011320065166Open ↗
▸BISPLUMBING - SUPPORTING DOCUMENTATION1
11/08/2010320081040Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
01/10/2011320081040Open ↗
▸Safety & Tenant Protection2
▸BISSTREET TREE CHECKLIST2
07/24/2008310170784Open ↗
07/22/2008310171612Open ↗
▸Environmental & Asbestos6
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER3
09/09/2008310192895Open ↗
07/24/2008310170784Open ↗
07/22/2008310171612Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
03/17/2010320133084Open ↗
10/15/2009320081040Open ↗
08/21/2009320065166Open ↗
▸Energy Compliance1
▸DOB NOWPreliminary Commissioning Report Certification1
08/16/2026B01320240-S4Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
08/24/2010310171612Open ↗
08/24/2010310171612Open ↗
▸Approvals, Objections & Sign-offs21
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST7
01/03/2011320081040Open ↗
01/03/2011320133084Open ↗
01/03/2011320065166Open ↗
Showing 3 of 7 on file for this type
▸BISADMINISTRATIVE OBJECTIONS6
03/17/2010320133084Open ↗
10/15/2009320081040Open ↗
08/21/2009320065166Open ↗
Showing 3 of 6 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION6
01/06/2011320081040Open ↗
01/03/2011320133084Open ↗
10/25/2010320133084Open ↗
Showing 3 of 6 on file for this type
▸BISTAP LETTER - DOM SVC : DEP-DOM1
01/07/2011320065166Open ↗
▸BISTAP LETTER - FIRE SVC : DEP-FIRE1
01/06/2011320081040Open ↗
▸Cost, Insurance & Ownership10
▸BISCOST AFFIDAVIT10
01/18/2011320133084Open ↗
01/03/2011320081040Open ↗
01/03/2011320065166Open ↗
Showing 3 of 10 on file for this type
▸Filing & Intake Forms7
▸BISEFILING COVER SHEET5
03/17/2010320133084Open ↗
10/15/2009320081040Open ↗
08/21/2009320065166Open ↗
Showing 3 of 5 on file for this type
▸BISADDITIONAL INFORMATION1
08/30/2010320065166Open ↗
▸BISeFiling Job Application Cover Sheet1
09/09/2008310192895Open ↗
▸Other Documents5
▸DOB NOWProperty Ownership Certification3
09/23/2026B01320240-P5Open ↗
08/16/2026B01320240-I1Open ↗
08/15/2026B01320240-P2Open ↗
▸BISDRY PIPE VALVE TEST : FP-102
01/07/2011320065166Open ↗
11/03/2010320065166Open ↗