← Back
Three families
858 LINDEN BOULEVARD
BROOKLYN · BIN 3102279
💬 Discuss this project
1920Year Built
2Stories
C0Building Class
R5Zoning
3,954 sfGross Floor Area
3Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Three families · 2,975 sf lot · 1.33 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ELITE PROPERTIES NYC1007/08/2026
ELITE PROPERTIES NYC HOMES LLC103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/22/2023$830K—— → —$210/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
XC ENGINEERING PC204/25/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
G DESIGN DRAFTING403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
XINLI.CONSTRUCTION LLCGeneral Contractor303/21/2026
PRIME PIPING & HEATING INPlumbing207/08/2026
APPROVED ELECTRIC CORP.Electrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
XC ENGINEERING PC6692104/25/2023
Building Lifecycle
All (49)Filed (2)Permit Issued (3)Signed Off (2)Violation (22)Inspection (6)Special Inspection (14)
05/05/2026
Violation issued (HPD, closed)
A
11/18/2025
Violation issued (HPD, closed)
I
06/10/2025
Violation issued (HPD, closed)
A
12/08/2023
Signed off — Alteration
CAP & REMOVE ILLEGAL (1) SINK, (1) GAS STOVE, (1) 3PC BATHROOM, (1) FINISHED ROOM, (2) BEDROOM AT CELLAR. REMEDY ECB VIOLATION # 34441731Z AND OTHER (8) RELATED VIOLATIONS. PLUMBING WORK IN CONJUNCTION WITH GC/MS APPLICATION #: B00855836.
B00855837-I1
12/08/2023
Signed off — Alteration
CAP & REMOVE ILLEGAL (1) SINK, (1) GAS STOVE, (1) 3PC BATHROOM, (1) FINISHED ROOM, (2) BEDROOM AT CELLAR. REMEDY ECB VIOLATION # 34441731Z AND OTHER (8) RELATED VIOLATIONS. INTERIOR RENOVATION OF (3) FAMILY HOUSE WITH MECHANICAL WORK.
B00855836-I1
12/06/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
10/05/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/04/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/02/2023
Permit issued — Plumbing
B00855837-I1-PL
09/28/2023
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
09/22/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/14/2023
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
05/12/2023
Permit issued — Plumbing
B00855837-I1-PL
05/01/2023
Permit issued — General Construction
B00855836-I1-GC-CX
04/25/2023
Filed — Alteration
CAP & REMOVE ILLEGAL (1) SINK, (1) GAS STOVE, (1) 3PC BATHROOM, (1) FINISHED ROOM, (2) BEDROOM AT CELLAR. REMEDY ECB VIOLATION # 34441731Z AND OTHER (8) RELATED VIOLATIONS. PLUMBING WORK IN CONJUNCTION WITH GC/MS APPLICATION #: B00855836.
B00855837-I1
04/25/2023
Filed — Alteration
CAP & REMOVE ILLEGAL (1) SINK, (1) GAS STOVE, (1) 3PC BATHROOM, (1) FINISHED ROOM, (2) BEDROOM AT CELLAR. REMEDY ECB VIOLATION # 34441731Z AND OTHER (8) RELATED VIOLATIONS. INTERIOR RENOVATION OF (3) FAMILY HOUSE WITH MECHANICAL WORK.
B00855836-I1
04/21/2023
Special inspection requirement — Maintenance information
XIU CHEN
04/21/2023
Special inspection requirement — Interior lighting power
XIU CHEN
04/21/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIU CHEN
04/21/2023
Special inspection requirement — Energy Code Compliance Inspections
XIU CHEN
04/21/2023
Special inspection requirement — Air barrier - visual inspection
XIU CHEN
04/21/2023
Special inspection requirement — Fenestration air leakage
XIU CHEN
04/21/2023
Special inspection requirement — Fenestration areas
XIU CHEN
04/21/2023
Special inspection requirement — HVAC-R and service water heating system controls
XIU CHEN
04/21/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
XIU CHEN
04/21/2023
Special inspection requirement — Duct leakage testing, insulation and design
XIU CHEN
04/21/2023
Special inspection requirement — HVAC-R and service water heating equipment
XIU CHEN
04/21/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
XIU CHEN
04/06/2023
Special inspection requirement — Mechanical Systems
XIU CHEN
04/06/2023
Special inspection requirement — Final
XIU CHEN
03/23/2023
Violation issued (HPD, closed)
A
11/04/2022
Violation issued (HPD, closed)
I
02/25/2022
Violation issued (HPD, closed)
I
02/25/2022
Violation issued (HPD, closed)
A
04/09/2021
Violation issued (HPD, closed)
I
04/09/2021
Violation issued (HPD, closed)
A
10/30/2019
Violation issued (HPD, closed)
I
10/18/2018
Violation issued (HPD, closed)
I
11/27/2017
Violation issued (HPD, closed)
I
11/10/2016
Violation issued (HPD, closed)
I
07/30/2008
Violation issued (ECB, closed)
Construction
03/26/2008
Violation issued (ECB, closed)
Unknown
11/09/2007
Violation issued (ECB, closed)
Unknown
07/28/2007
Violation issued (ECB, closed)
Unknown
03/22/2007
Violation issued (ECB, closed)
Unknown
11/03/2006
Violation issued (ECB, closed)
Unknown
06/17/2006
Violation issued (ECB, closed)
Unknown
08/31/2004
Violation issued (ECB, closed)
Construction
08/31/2004
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offPRIME PIPING & HEATING IN10/02/2023
DOB NOWPlumbingSigned-offPRIME PIPING & HEATING IN05/12/2023
DOB NOWGeneral ConstructionSigned-offXINLI.CONSTRUCTION LLC05/01/2023
1 project · most recent 06/12/2023
General Wiring
FiledStatusContractorScope
06/12/2023Permit IssuedAPPROVED ELECTRIC CORP.General Wiring
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
12/06/2023Pass-Final General Construction Non-Directive 14PassView ↗
10/05/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/04/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/28/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
09/22/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/14/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
▾Special Inspection Requirements (DOB NOW) — 14
DateRequirementInspectorRole
04/21/2023Maintenance informationXIU CHENenergy_progress
04/21/2023Interior lighting powerXIU CHENenergy_progress
04/21/2023Fire-Resistant Penetrations and JointsXIU CHENspecial
04/21/2023Energy Code Compliance InspectionsXIU CHENprogress
04/21/2023Air barrier - visual inspectionXIU CHENenergy_progress
04/21/2023Fenestration air leakageXIU CHENenergy_progress
04/21/2023Fenestration areasXIU CHENenergy_progress
04/21/2023HVAC-R and service water heating system controlsXIU CHENenergy_progress
04/21/2023Fenestration and door U-factor and product ratingsXIU CHENenergy_progress
04/21/2023Duct leakage testing, insulation and designXIU CHENenergy_progress
04/21/2023HVAC-R and service water heating equipmentXIU CHENenergy_progress
04/21/2023HVAC-R and service water piping design and insulationXIU CHENenergy_progress
04/06/2023Mechanical SystemsXIU CHENspecial
04/06/2023FinalXIU CHENprogress
▾Documents — 9 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/27/2026B00855836-I1Request digital key ↗
08/27/2026B00855837-I1Request digital key ↗
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/13/2026B00855837-I1Open ↗
08/13/2026B00855836-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/27/2026B00855836-I1Open ↗
08/27/2026B00855836-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/27/2026B00855836-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/13/2026B00855837-I1Open ↗
08/13/2026B00855836-I1Open ↗