← Back
BuildNYC
Old law tenement
859 HUNTS POINT AVENUE
BRONX · Hunts Point · BIN 2005947
💬 Discuss this project
1904Year Built
4Stories
C4Building Class
R6Zoning
10,560 sfGross Floor Area
8Units
0 Active Violations
Old law tenement · Owner of record: NYC Housing Authority · 3,900 sf lot · 2.71 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofRoofing replacement and rooftop structure renovation22p · 2 filings · 20 docs
Floor 4HVAC system replacement1 filing · 12 docs
Floor 3HVAC system replacement1 filing · 12 docs
Floor 2HVAC system replacement1 filing · 12 docs
Floor 1HVAC system replacement1 filing · 12 docs
CellarHVAC system replacement1 filing · 12 docs
Site & exteriorRoofing replacement and rooftop structure renovation54p · 5 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
New York City Housing Authority2911/10/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Old Structures Engineering111/09/2026
IMEG Consulting203/26/2026
Curtis + Ginsberg Architects103/25/2026
Odc Associates308/26/2024
Dseny Engineering Services402/05/2024
Joel Phagoo P.E.203/27/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AK Consulting Services403/21/2026
Sharon Rader103/21/2026
Dseny Engineering Services803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Raven Construction ServicesScaffold807/08/2026
Adam's European ContractingGeneral Contractor507/08/2026
Vikrant Contracting & BuilderScaffold407/08/2026
Zoria HousingScaffold307/08/2026
Q.Y. ElectricElectrical203/22/2026
Arcadia Elect'lElectrical103/22/2026
Dreamland ConstructionGeneral Contractor309/14/2013
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
20/20 Inspections1471508/26/2024
Building Lifecycle
11/09/2026
Filed — Alteration
INTERIOR AND EXTERIOR RENOVATION OF EXISTING MULTIFAMILY BUILDING, AND RENOVATION OF INTERIOR UNITS AND CORRIDORS. NO CHANGE TO EXISTING USE, OCCUPANCY OR EGRESS IS PROPOSED UNDER THIS APPLICATION.
X01363397-S4
11/03/2026
Special inspection requirement — Post-installed Anchors
11/03/2026
Special inspection requirement — Masonry
11/03/2026
Special inspection requirement — Preliminary
11/03/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
89 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offAdam's European Contracting12/31/2024
DOB NOWStructuralSigned-offAdam's European Contracting09/30/2024
DOB NOWSidewalk ShedSigned-offVikrant Contracting & Builders04/18/2024
DOB NOWConstruction FenceSigned-offZoria Housing03/22/2024
DOB NOWSidewalk ShedSigned-offVikrant Contracting & Builders03/21/2024
DOB NOWSupported ScaffoldSigned-offRaven Construction Services03/12/2024
DOB NOWSidewalk ShedSigned-offRaven Construction Services03/06/2024
DOB NOWGeneral ConstructionSigned-offAdam's European Contracting01/10/2024
DOB NOWSupported ScaffoldSigned-offRaven Construction Services12/28/2023
DOB NOWSidewalk ShedSigned-offVikrant Contracting & Builders03/27/2023
DOB NOWConstruction FenceSigned-offZoria Housing03/27/2023
DOB NOWSidewalk ShedSigned-offRaven Construction Services03/01/2023
BISOTISSUEDDreamland Construction09/14/2013
BISEQISSUEDDreamland Construction06/10/2013
BISEQISSUEDDreamland Construction05/17/2012
1 project · most recent 11/09/2026
Gas Water/Sanitary
FiledStatusContractorScope
11/09/2026——Gas, Water/Sanitary
2 projects · most recent 12/18/2023
FiledStatusContractorScope
12/18/2023CompleteArcadia Elect'l—
03/14/2023Permit IssuedQ.Y. Electric—
1 project · most recent 11/09/2026
Concrete Masonry
FiledStatusContractorScope
11/09/2026——Concrete, Masonry
▾Special Inspection Requirements (DOB NOW) — 29
DateRequirementInspectorRole
11/03/2026Post-installed Anchors—special
11/03/2026Masonry—special
11/03/2026Preliminary—progress
11/03/2026Structural Stability – Alterations of existing buildings—special
06/25/2026Tenant Protection Plan Compliance—special
06/25/2026Final—progress
03/05/2026Fenestration air leakage—energy_progress
02/23/2026Exterior lighting power—energy_progress
02/23/2026Fenestration and door U-factor and product ratings—energy_progress
02/23/2026Lighting controls—energy_progress
02/23/2026Interior lighting power—energy_progress
02/23/2026Lighting in dwelling units—energy_progress
02/23/2026Fire-Resistance Rated Construction—progress
02/23/2026Energy Code Compliance Inspections—progress
02/23/2026Fire-Resistant Penetrations and Joints—special
02/23/2026Final—progress
02/23/2026Tenant Protection Plan Compliance—special
04/17/2024Post-installed AnchorsJACOB HAASspecial
04/17/2024FinalJACOB HAASprogress
04/17/2024Tenant Protection Plan ComplianceJACOB HAASspecial
04/17/2024MasonryJACOB HAASspecial
04/17/2024Structural Stability – Alterations of existing buildingsJACOB HAASspecial
03/15/2024FinalJACOB HAASprogress
03/15/2024Structural Stability – Alterations of existing buildingsJACOB HAASspecial
03/15/2024Tenant Protection Plan Compliance—special
Latest 25 of 29.
78 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account