← Back
Two family brick
859 PENFIELD STREET
BRONX · BIN 2100089
💬 Discuss this project
1935Year Built
2Stories
B1Building Class
R4Zoning
2,020 sfGross Floor Area
2Units
Rent Stabilized1 Open Violation ▸
Two family brick · Owner of record: 857-859 PENFIELD LLC · 1,750 sf lot · 1.15 FAR built · Flood zone X
Locations of Work
General
Cellar1p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
859 PENFIELD STREET , BRONX NY 1047607/08/2026
857-859 PENFIELD LLC103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RUDOLPH DUPUY110/05/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
KNOVA EXPEDITING SERVICES INC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JUNIOR CARTER MECH. CORPPlumbing207/08/2026
Building Lifecycle
All (25)Filed (1)Permit Issued (2)Signed Off (1)Violation (19)Inspection (2)
09/15/2024
Violation issued (HPD, open)
A
09/15/2024
Violation issued (HPD, closed)
B
09/15/2024
Violation issued (HPD, closed)
B
09/15/2024
Violation issued (HPD, closed)
C
09/15/2024
Violation issued (HPD, closed)
B
09/15/2024
Violation issued (HPD, closed)
B
09/15/2024
Violation issued (HPD, closed)
B
09/15/2024
Violation issued (HPD, closed)
B
09/15/2024
Violation issued (HPD, closed)
C
09/15/2024
Violation issued (HPD, closed)
B
09/15/2024
Violation issued (HPD, closed)
B
09/15/2024
Violation issued (HPD, closed)
B
09/15/2024
Violation issued (HPD, closed)
B
09/15/2024
Violation issued (HPD, closed)
B
07/21/2023
Signed off — Alteration
Replace 1 existing oil boiler, 1 oil hot water with new natural gas ones with related gas piping, relocate 2 existing gas meters from Cellar to OSP and installation of 1 new gas meter as indicated on plans. No change to existing occupancy use or egress.
X08011778-I1
06/14/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/20/2023
Permit issued — Plumbing
X08011778-I1-PL
02/01/2023
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
01/21/2023
Violation issued (HPD, closed)
C
01/21/2023
Violation issued (HPD, closed)
C
01/21/2023
Violation issued (HPD, closed)
B
01/04/2023
Violation issued (HPD, closed)
I
01/03/2023
Violation issued (HPD, closed)
C
10/24/2022
Permit issued — Plumbing
X08011778-I1-PL
10/05/2022
Filed — Alteration
Replace 1 existing oil boiler, 1 oil hot water with new natural gas ones with related gas piping, relocate 2 existing gas meters from Cellar to OSP and installation of 1 new gas meter as indicated on plans. No change to existing occupancy use or egress.
X08011778-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offJUNIOR CARTER MECH. CORP03/20/2023
DOB NOWPlumbingSigned-offJUNIOR CARTER MECH. CORP10/24/2022
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
06/14/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/01/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
▾Documents — 3 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/23/2026X08011778-I1Request digital key ↗
▸Seals & Professional Certifications1
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026X08011778-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026X08011778-I1Open ↗