86-01 JAMAICA AVENUE
QUEENS · Woodhaven · BIN 4181753
💬 Discuss this project
1965Year Built
2Stories
K4Building Class
R6AZoning
5,280 sfGross Floor Area
3Units
Rent Stabilized7 Open Violations ▸FDNY Report ↗
Predominantly retail with other uses · Owner of record: GDJJ AMERICAN AVENUE LLC · 4,357 sf lot · 1.21 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingCivilGeneral
Permit Issued — active, not yet Signed-off
Floor 53p · 2 filings · 11 docs
Floor 43p · 2 filings · 11 docs
Floor 33p · 2 filings · 11 docs
Floor 23p · 2 filings · 11 docs
Floor 1Under Construction17p · 4 filings · 20 docs
CellarUnder Construction12p · 2 filings · 20 docs
Site & exteriorUnder Construction15p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
DOB SERVICES804/09/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/17/2024$1.7M—86-03 JAMAICA AVE, LLC → GDJJ AMERICAN AVENUE LLC$322/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LUCID BUILDING ENGINEERING P.C.308/24/2026
Alan Yang Architecture DPC603/27/2026
LEON SKVIRSKY PE212/19/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
LOUIS STRIAR403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
L S SIGNScaffold207/08/2026
VOLTRON ELECTRIC LLCElectrical103/22/2026
KALE CONSTRUCTION INCGeneral Contractor104/09/2026
AUR0RA ELECL CONTG INCElectrical103/22/2026
AMERICAN STANDARD P&H CORORP.Plumbing107/08/2026
A1 SPECIALIZED, INCScaffold107/08/2026
TGB CREATIVE DESIGN INCGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ALAN YANG ARCHITECTURE9490603/27/2026
LUCID BUILDING ENGINEERIN8196109/22/2025
Building Lifecycle
All (78)Filed (11)Permit Issued (6)Signed Off (4)Violation (10)Inspection (17)Special Inspection (30)
08/24/2026
Filed — Alteration
PROPOSE NEW ILLUMINATED CHANNEL LETTERS SIGN ON EXISTING STOREFRONT FOR EXISTING COMMERCIAL SPACE. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Q01250649-P3
07/31/2026
Special inspection requirement — Final
YUNHO LEE
04/20/2026
Signed off — Alteration
PROPOSE NEW ILLUMINATED CHANNEL LETTERS SIGN ON EXISTING STOREFRONT FOR EXISTING COMMERCIAL SPACE. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Q01250649-I1
04/17/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
04/10/2026
Signed off — Alteration
TO PROPOSE PLUMBING & GAS WORK FOR NEW NAIL STORE IN CONJUNCTION WITH ALT-2 JOB Q01250649 AS PER PLAN FILLED HEREWITH. NO CHANGE OF USE, EGRESS OR CERTIFICATE OF OCCUPANCY.
Q01251458-I1
04/06/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/06/2026
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
03/30/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Alan Yang
03/30/2026
Special inspection requirement — Tenant Protection Plan Compliance
Alan Yang
03/30/2026
Special inspection requirement — Fire-Resistance Rated Construction
Alan Yang
03/30/2026
Special inspection requirement — Energy Code Compliance Inspections
Alan Yang
03/30/2026
Special inspection requirement — Mechanical Systems
Alan Yang
03/30/2026
Special inspection requirement — Interior lighting power
Alan Yang
03/30/2026
Special inspection requirement — HVAC-R and service water heating equipment
Alan Yang
03/30/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Alan Yang
03/30/2026
Special inspection requirement — HVAC-R and service water heating system controls
Alan Yang
03/30/2026
Special inspection requirement — Final
Alan Yang
03/27/2026
Filed — Alteration
PROPOSE NEW ILLUMINATED CHANNEL LETTERS SIGN ON EXISTING STOREFRONT FOR EXISTING COMMERCIAL SPACE. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Q01250649-P2
03/26/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Alan Yang
03/26/2026
Special inspection requirement — Mechanical Systems
Alan Yang
03/26/2026
Special inspection requirement — Tenant Protection Plan Compliance
Alan Yang
03/26/2026
Special inspection requirement — Energy Code Compliance Inspections
Alan Yang
03/26/2026
Special inspection requirement — Final
Alan Yang
03/26/2026
Special inspection requirement — Fire-Resistance Rated Construction
Alan Yang
03/26/2026
Special inspection requirement — HVAC-R and service water heating system controls
Alan Yang
03/26/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Alan Yang
03/26/2026
Special inspection requirement — HVAC-R and service water heating equipment
Alan Yang
03/26/2026
Special inspection requirement — Interior lighting power
Alan Yang
03/25/2026
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
03/24/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/24/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Alan Yang
03/24/2026
Special inspection requirement — Tenant Protection Plan Compliance
Alan Yang
03/24/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Alan Yang
03/24/2026
Special inspection requirement — Energy Code Compliance Inspections
Alan Yang
03/20/2026
Filed — Alteration
TO PROPOSE PLUMBING & GAS WORK FOR NEW NAIL STORE IN CONJUNCTION WITH ALT-2 JOB Q01250649 AS PER PLAN FILLED HEREWITH. NO CHANGE OF USE, EGRESS OR CERTIFICATE OF OCCUPANCY.
Q01251458-P2
01/23/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/20/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
01/14/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/07/2026
Permit issued — Sign
Q01250649-S2-SG
01/03/2026
Filed — Alteration
PROPOSE NEW ILLUMINATED CHANNEL LETTERS SIGN ON EXISTING STOREFRONT FOR EXISTING COMMERCIAL SPACE. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Q01250649-S2
12/24/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/16/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
11/25/2025
Violation issued (HPD, open)
I
11/12/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
10/31/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
10/21/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
10/17/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
10/14/2025
Filed — Alteration
TO PROPOSE PLUMBING & GAS WORK FOR NEW NAIL STORE IN CONJUNCTION WITH ALT-2 JOB Q01250649 AS PER PLAN FILLED HEREWITH. NO CHANGE OF USE, EGRESS OR CERTIFICATE OF OCCUPANCY.
Q01251458-P1
10/14/2025
Filed — Alteration
PROPOSE NEW ILLUMINATED CHANNEL LETTERS SIGN ON EXISTING STOREFRONT FOR EXISTING COMMERCIAL SPACE. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Q01250649-P1
10/14/2025
Permit issued — General Construction
Q01290272-I1-GC
10/10/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/09/2025
Special inspection requirement — Energy Code Compliance Inspections
Alan Yang
10/09/2025
Special inspection requirement — Final
Alan Yang
10/09/2025
Special inspection requirement — Fire-Resistance Rated Construction
Alan Yang
10/09/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Alan Yang
10/09/2025
Special inspection requirement — HVAC-R and service water heating system controls
Alan Yang
09/22/2025
Filed — Alteration
FILING TO INSTALL NON-ILLUMINATED ALUMINUM AWNING ON WALL FOR FIRST FLOOR COMMERCIAL SPACE. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Q01290272-I1
08/20/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/20/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
07/23/2025
Permit issued — Plumbing
Q01251458-I1-PL
Latest 60 of 78 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSignPermit IssuedMAD SIGNS INC01/07/2026
DOB NOWGeneral ConstructionSigned-offTGB CREATIVE DESIGN INC10/14/2025
DOB NOWPlumbingSigned-offAMERICAN STANDARD P&H CORORP.07/23/2025
DOB NOWGeneral ConstructionSigned-offKALE CONSTRUCTION INC07/15/2025
DOB NOWSignSigned-offWEINFELD, ELLIOT12/30/2019
DOB NOWSignSigned-offWEINFELD, ELLIOT12/30/2019
BISMHISSUEDSUNSHINE A/C HEATING INC.01/11/2001
1 project · most recent 08/24/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
08/24/2026Signed-offKALE CONSTRUCTION INCHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Aspen CE60B3G-245L-020 120,000 BTU · Fan Coil Indoor ×4
Y91E120D20SMPS1A 120,000 BTU · Ahu ×2
York YC2D60SB21SA 120,000 BTU · Condensing Unit ×6
Ventilation
Captiveaire DMUA14FA 986 CFM · Makeup Air ×6
DU33HFA 2,200 CFM · Exhaust Fan ×6
4 projects · most recent 01/19/2026
General Wiring
FiledStatusContractorScope
01/19/2026Permit IssuedVOLTRON ELECTRIC LLC—
07/22/2025CompleteNY FOREVER ELECTRIC LLCGeneral Wiring
10/24/2019Permit IssuedAUR0RA ELECL CONTG INC—
10/24/2019Permit IssuedAUR0RA ELECL CONTG INC—
▾Field Inspections (DOB CAP) — 17
DateTypeResultReport
04/17/2026Pass-Final General Construction Non-Directive 14PassView ↗
04/06/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/06/2026Fail-Final General Construction Non-Directive 14FailView ↗
03/25/2026Fail-Final General Construction Non-Directive 14FailView ↗
03/24/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/23/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/20/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/14/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/24/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/16/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
11/12/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/31/2025Pass-Final General Construction Non-Directive 14PassView ↗
10/21/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
10/17/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/10/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/20/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/20/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 36
DateRequirementInspectorRole
07/31/2026FinalYUNHO LEEprogress
03/30/2026Fire-Resistant Penetrations and JointsAlan Yangspecial
03/30/2026Tenant Protection Plan ComplianceAlan Yangspecial
03/30/2026Fire-Resistance Rated ConstructionAlan Yangprogress
03/30/2026Energy Code Compliance InspectionsAlan Yangprogress
03/30/2026Mechanical SystemsAlan Yangspecial
03/30/2026Interior lighting powerAlan Yangenergy_progress
03/30/2026HVAC-R and service water heating equipmentAlan Yangenergy_progress
03/30/2026HVAC-R and service water piping design and insulationAlan Yangenergy_progress
03/30/2026HVAC-R and service water heating system controlsAlan Yangenergy_progress
03/30/2026FinalAlan Yangprogress
03/26/2026Fire-Resistant Penetrations and JointsAlan Yangspecial
03/26/2026Mechanical SystemsAlan Yangspecial
03/26/2026Tenant Protection Plan ComplianceAlan Yangspecial
03/26/2026Energy Code Compliance InspectionsAlan Yangprogress
03/26/2026FinalAlan Yangprogress
03/26/2026Fire-Resistance Rated ConstructionAlan Yangprogress
03/26/2026HVAC-R and service water heating system controlsAlan Yangenergy_progress
03/26/2026HVAC-R and service water piping design and insulationAlan Yangenergy_progress
03/26/2026HVAC-R and service water heating equipmentAlan Yangenergy_progress
03/26/2026Interior lighting powerAlan Yangenergy_progress
03/24/2026HVAC-R and service water piping design and insulationAlan Yangenergy_progress
03/24/2026Tenant Protection Plan ComplianceAlan Yangspecial
03/24/2026Fire-Resistant Penetrations and JointsAlan Yangspecial
03/24/2026Energy Code Compliance InspectionsAlan Yangprogress
Latest 25 of 36.
▾Documents — 73 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch9
08/18/2026Q01290272-I1Request digital key ↗
08/18/2026Q01251458-I1Request digital key ↗
08/18/2026Q01251458-P2Request digital key ↗
Showing 3 of 9 on file for this type
▸DOB NOWPlans/Sketch - Sign2
08/28/2026Q00252179-I1Request digital key ↗
08/28/2026Q00252118-I1Request digital key ↗
▸Seals & Professional Certifications47
▸DOB NOWProgress Inspector Seal & Signature25
09/23/2026Q01250649-P3Open ↗
09/01/2026Q00252118-I1Open ↗
08/31/2026Q01250649-P2Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature11
08/31/2026Q01250649-P2Open ↗
08/31/2026Q01250649-P2Open ↗
08/31/2026Q01250649-P2Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature11
08/28/2026Q00252179-I1Open ↗
08/18/2026Q01290272-I1Open ↗
08/18/2026Q01251458-P1Open ↗
Showing 3 of 11 on file for this type
▸Environmental & Asbestos15
▸DOB NOWOER: Notice to Proceed9
08/28/2026Q00252179-I1Open ↗
08/13/2026Q01250649-P2Open ↗
08/13/2026Q00252118-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWOER: Notice of Satisfaction4
08/28/2026Q00252179-I1Open ↗
08/17/2026Q01250649-I1Open ↗
08/13/2026Q00252118-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/28/2026Q00252179-I1Open ↗
08/13/2026Q00252118-I1Open ↗