← Back
Primarily 2 family with 1 store or office
86-04 117 STREET
QUEENS · BIN 4193385
💬 Discuss this project
1920Year Built
3Stories
S2Building Class
R6BZoning
3,300 sfGross Floor Area
3Units
18 Open Violations ▸FDNY Report ↗
Primarily 2 family with 1 store or office · Owner of record: GSP 117 LLC · 1,860 sf lot · 1.77 FAR built · Flood zone X
Locations of Work
ArchitectureElectrical
Roof1p · 1 filing · 20 docs
Floor 32p · 1 filing · 20 docs
Floor 2
Floor 1
Cellar1p · 1 filing · 16 docs
1 job · most recent 06/02/2025
Gas Water/Sanitary
FiledStatusContractorScope
06/02/2025Signed-offSAI JI PLUMBING, INCGas, Water/Sanitary
3 jobs · most recent 10/19/2024
General Wiring
FiledStatusContractorScope
10/19/2024Permit IssuedRICHARD NEU—
10/10/2024CompleteJKC ELECTRICAL INCGeneral Wiring
01/03/2024Permit IssuedCARRASCO ELECTRIC INCGeneral Wiring
1 job · most recent 10/14/2024
Sidewalk Shed
FiledStatusContractorScope
10/14/2024Permit IssuedINDER CONSTRUCTION INCSidewalk Shed
Building Lifecycle
All (78)Filed (9)Permit Issued (5)Signed Off (2)Violation (20)Inspection (6)Objection (6)Special Inspection (30)
07/29/2026
Violation issued (ECB, open)
Construction
07/29/2026
Violation issued (ECB, open)
Construction
07/29/2026
Violation issued (ECB, open)
Construction
07/17/2026
Special inspection requirement — Fire-Resistance Rated Construction
Vicente Varela
07/17/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
BRIAN T. O'CONNOR
07/17/2026
Special inspection requirement — Mechanical Systems
BRIAN T. O'CONNOR
07/17/2026
Special inspection requirement — Energy Code Compliance Inspections
Vicente Varela
07/17/2026
Special inspection requirement — Final
Vicente Varela
06/11/2026
Filed — Alteration
Q01354272-P1
06/10/2026
Special inspection requirement — Mechanical Systems
BRIAN T. O'CONNOR
06/10/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
BRIAN T. O'CONNOR
06/10/2026
Special inspection requirement — Fire-Resistance Rated Construction
Vicente Varela
06/10/2026
Special inspection requirement — Final
Vicente Varela
06/10/2026
Special inspection requirement — Energy Code Compliance Inspections
Vicente Varela
05/12/2026
Filed — Alteration
Q01354272-I1
10/15/2025
Violation issued (ECB, open)
Construction
10/15/2025
Violation issued (ECB, open)
Construction
10/15/2025
Violation issued (ECB, open)
Construction
07/21/2025
Signed off — Alteration
PROPOSED MINOR INTERIOR ALTERATION AT 2ND AND 3RD FLOOR. REPLACE EXISTING BOILERS AND H.W.H. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q00950998-S2
07/21/2025
Signed off — Alteration
PROPOSED MINOR INTERIOR ALTERATION AT 2ND AND 3RD FLOOR. REPLACE EXISTING BOILERS AND H.W.H. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q00950998-I1
07/16/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
06/23/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
06/23/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/20/2025
Special inspection requirement — Maintenance information
KY FU
06/20/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
KY FU
06/20/2025
Special inspection requirement — HVAC-R and service water heating system controls
KY FU
06/20/2025
Special inspection requirement — Energy Code Compliance Inspections
KY FU
06/20/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
KY FU
06/20/2025
Special inspection requirement — HVAC-R and service water heating equipment
KY FU
06/02/2025
Filed — Alteration
PROPOSED MINOR INTERIOR ALTERATION AT 2ND AND 3RD FLOOR. REPLACE EXISTING BOILERS AND H.W.H. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q00950998-P4
05/19/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/12/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
KY FU
02/12/2025
Special inspection requirement — Interior lighting power
KY FU
02/12/2025
Special inspection requirement — Fire-Resistance Rated Construction
KY FU
02/12/2025
Special inspection requirement — Energy Code Compliance Inspections
KY FU
02/12/2025
Special inspection requirement — Lighting in dwelling units
KY FU
02/07/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
02/07/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/05/2025
Filed — Alteration
PROPOSED MINOR INTERIOR ALTERATION AT 2ND AND 3RD FLOOR. REPLACE EXISTING BOILERS AND H.W.H. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q00950998-P3
01/31/2025
Special inspection requirement — Fire-Resistance Rated Construction
KY FU
01/31/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
KY FU
01/31/2025
Special inspection requirement — Energy Code Compliance Inspections
KY FU
01/31/2025
Special inspection requirement — Lighting in dwelling units
KY FU
01/31/2025
Special inspection requirement — Interior lighting power
KY FU
11/07/2024
Permit issued — Plumbing
Q00950998-S2-PL
11/06/2024
Permit issued — General Construction
Q00950998-I1-GC
10/18/2024
Permit issued — Sidewalk Shed
Q01125667-I1-SH
10/14/2024
Filed — Alteration
INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Q01125667-I1
08/12/2024
Filed — Alteration
PROPOSED MINOR INTERIOR ALTERATION AT 2ND AND 3RD FLOOR. REPLACE EXISTING BOILERS AND H.W.H. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q00950998-P2
07/18/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
KY FU
07/18/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
KY FU
07/18/2024
Special inspection requirement — HVAC-R and service water heating equipment
KY FU
07/18/2024
Special inspection requirement — Maintenance information
KY FU
07/09/2024
Filed — Alteration
PROPOSED MINOR INTERIOR ALTERATION AT 2ND AND 3RD FLOOR. REPLACE EXISTING BOILERS AND H.W.H. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q00950998-P1
03/05/2024
Violation issued (HPD, open)
B
03/05/2024
Violation issued (HPD, open)
B
03/05/2024
Violation issued (HPD, open)
C
01/06/2024
Violation issued (HPD, open)
B
01/06/2024
Violation issued (HPD, open)
C
01/06/2024
Violation issued (HPD, open)
B
Latest 60 of 78 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SGP 2191907/08/2026
INDER CONSTRUCTION504/08/2026
GSP 117 LLC403/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/29/2023$1.0M—HELEN AND MARY 1956 LLC → GSP 117 LLC$311/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ARQUITECTURA VARELA206/11/2026
HT ASSOCIATES606/02/2025
SYED ENGINEERING, P.C.110/14/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
HAOTIAN & ASSOCIATES INC.603/21/2026
ADVANCED BUILDERS SERVICES103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SAI JI PLUMBING INCGeneral Contractor307/08/2026
SAI JI PLUMBING, INCPlumbing207/08/2026
RICHARD NEUElectrical103/22/2026
INDER CONSTRUCTION INCGeneral Contractor104/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BUTTERFIELD & O'CONNOR4189206/11/2026
FLUSHING ENGINEERING SERV4373606/02/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offSAI JI PLUMBING, INC11/07/2024
DOB NOWGeneral ConstructionSigned-offSAI JI PLUMBING INC11/06/2024
DOB NOWSidewalk ShedPermit IssuedINDER CONSTRUCTION INC10/18/2024
DOB NOWGeneral ConstructionSigned-offSAI JI PLUMBING INC12/28/2023
DOB NOWPlumbingSigned-offSAI JI PLUMBING, INC12/21/2023
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
07/16/2025Pass-Final General Construction Non-Directive 14PassView ↗
06/23/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/23/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/19/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/07/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
02/07/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 37
DateRequirementInspectorRole
07/17/2026Fire-Resistance Rated ConstructionVicente Varelaprogress
07/17/2026Fire-Resistant Penetrations and JointsBRIAN T. O'CONNORspecial
07/17/2026Mechanical SystemsBRIAN T. O'CONNORspecial
07/17/2026Energy Code Compliance InspectionsVicente Varelaprogress
07/17/2026FinalVicente Varelaprogress
06/10/2026Mechanical SystemsBRIAN T. O'CONNORspecial
06/10/2026Fire-Resistant Penetrations and JointsBRIAN T. O'CONNORspecial
06/10/2026Fire-Resistance Rated ConstructionVicente Varelaprogress
06/10/2026FinalVicente Varelaprogress
06/10/2026Energy Code Compliance InspectionsVicente Varelaprogress
06/20/2025Maintenance informationKY FUenergy_progress
06/20/2025HVAC-R and service water piping design and insulationKY FUenergy_progress
06/20/2025HVAC-R and service water heating system controlsKY FUenergy_progress
06/20/2025Energy Code Compliance InspectionsKY FUprogress
06/20/2025Fire-Resistant Penetrations and JointsKY FUspecial
06/20/2025HVAC-R and service water heating equipmentKY FUenergy_progress
02/12/2025Fire-Resistant Penetrations and JointsKY FUspecial
02/12/2025Interior lighting powerKY FUenergy_progress
02/12/2025Fire-Resistance Rated ConstructionKY FUprogress
02/12/2025Energy Code Compliance InspectionsKY FUprogress
02/12/2025Lighting in dwelling unitsKY FUenergy_progress
01/31/2025Fire-Resistance Rated ConstructionKY FUprogress
01/31/2025Fire-Resistant Penetrations and JointsKY FUspecial
01/31/2025Energy Code Compliance InspectionsKY FUprogress
01/31/2025Lighting in dwelling unitsKY FUenergy_progress
Latest 25 of 37.
▾Documents — 51 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/23/2026Q00950998-P1Request digital key ↗
08/23/2026Q00950998-S2Request digital key ↗
08/23/2026Q00950998-P4Request digital key ↗
Showing 3 of 9 on file for this type
▸Seals & Professional Certifications34
▸DOB NOWProgress Inspector Seal & Signature16
09/01/2026Q00950998-S2Open ↗
09/01/2026Q00950998-S2Open ↗
09/01/2026Q00950998-P1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/23/2026Q00950998-P1Open ↗
08/23/2026Q00950998-S2Open ↗
08/23/2026Q00950998-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/01/2026Q00950998-S2Open ↗
09/01/2026Q00950998-P1Open ↗
08/29/2026Q01354272-P1Open ↗
Showing 3 of 9 on file for this type
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/23/2026Q00950998-P1Open ↗
08/23/2026Q00950998-S2Open ↗
08/23/2026Q00950998-P4Open ↗
Showing 3 of 8 on file for this type