| Owner | Filings | Most Recent |
|---|---|---|
| CHURCH OF JESUS CHRIST OF LATTE | 11 | 09/14/2026 |
| PLAINVIEW FM GROUP | 1 | 03/21/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| CELIN MUNOZ CONSULTING ENGINEER, PC | 2 | 07/22/2026 |
| IP PROFESSIONAL ENGINEERING, PC | 4 | 07/15/2026 |
| LOCAL PARTI ARCHITECTURE | 1 | 01/15/2026 |
| Representative | Filings | Most Recent |
|---|---|---|
| NEW CODE CONSULTING LLC | 10 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| BEHNAMBAKHSH, SHAYAN | Electrical | 1 | 03/21/2026 |
| CASTILLO JR, JORGE | Electrical | 1 | 03/21/2026 |
| C SCHLOSBERG INC | Electrical | 1 | 03/21/2026 |
| KRSLOVIC, ANTE | Electrical | 1 | 03/21/2026 |
| OTTEN, GERALD | Electrical | 1 | 03/21/2026 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/15/2026 | — | — | 145 heads |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/22/2026 | — | — | Steel, Concrete, Wood |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 06/18/2026 | Post-installed Anchors | — | special |
| 06/18/2026 | Seismic Isolation Systems | — | special |
| 06/18/2026 | Sprinkler Systems | — | special |
| 06/18/2026 | Fire-Resistant Penetrations and Joints | — | special |
| 06/04/2026 | Concrete - Cast-In-Place | — | special |
| 06/04/2026 | Structural Stability – Alterations of existing buildings | — | special |
| 06/04/2026 | Structural Steel - Welding | — | special |
| 06/04/2026 | Excavations - Sheeting, Shoring, and Bracing | — | special |
| 01/24/2026 | HVAC-R and service water piping design and insulation | — | energy_progress |
| 01/24/2026 | Fire-Resistant Penetrations and Joints | — | special |
| 01/15/2026 | Structural Steel - Details | — | special |
| 01/15/2026 | Wood – Seismic Resistance | — | special |
| 01/09/2026 | Energy Code Compliance Inspections | — | progress |
| 11/03/2025 | Final | — | progress |