← Back
Elevator cooperative
86-10 34 AVENUE
QUEENS · BIN 4035594
💬 Discuss this project
1937Year Built
6Stories
D4Building Class
R7-1Zoning
104,476 sfGross Floor Area
84Units
LL97 CoveredRent Stabilized1 Open Violation ▸
Elevator cooperative · Owner of record: 86-10 34TH AVE. OWNERS CORP. · 23,000 sf lot · 4.54 FAR built · Flood zone X
Locations of Work
Structural
Roof1p · 1 filing · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
JASCO603/22/2026
TOTAL MANAGEMENT NYC603/22/2026
PRECISION MGMT303/22/2026
86-10 34 AVE OWNER CORP1703/22/2026
NEW BEDFORD MAIN CORP.103/22/2026
PRIDE MGMT CO203/22/2026
OWNER OF PREMISES 86-10 3103/22/2026
THE OWNER OF103/22/2026
JACKSON 34TH ASSOCIATION203/22/2026
MR. JOSE LARACUC OWNER OF103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MSM ENGINEERING SERVICES, PLLC110/10/2024
EOC-NY109/16/2024
TSS ENGINEERS308/13/2024
URBAN PIONEERING ARCHITECTURE103/07/2022
WILLIAM F. RYAN, JR. P.E. PC102/03/2022
ARQUITECTURA VARELA110/05/2021
SYED ENGINEERING, P.C.109/12/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JENNY FLORES EXPEDITING303/21/2026
ROCKAWAY BEACH BLVD CONSTRUCITON203/21/2026
ADVANCED BUILDERS SERVICES103/21/2026
MMSR CONSULTING GROUP LLC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SASCO BUILDERS INCGeneral Contractor403/21/2026
R.N.K. ROMEO CONST INCGeneral Contractor303/21/2026
JASCO, INCGeneral Contractor303/21/2026
LXS AIR INCGeneral Contractor303/21/2026
ADVANCED PLUMBING MECHPlumbing207/08/2026
RICHARD NEUElectrical103/22/2026
WJ CONTRACTING CORPGeneral Contractor107/08/2026
BROOKYLN SOLARWORKS, LLCElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
EOC-NY6548109/16/2024
LEO Y LEE ASSOCIATES2481109/16/2024
TSS ENGINEERS4492308/13/2024
URBAN PIONEERING ARCHITEC6521103/07/2022
RYAN SPECIAL ENGINEERING2018102/03/2022
BUTTERFIELD & O'CONNOR4189110/05/2021
Building Lifecycle
All (106)Filed (9)Permit Issued (8)Signed Off (7)Violation (60)Special Inspection (22)
10/06/2025
Violation issued (HPD, closed)
B
10/06/2025
Violation issued (HPD, closed)
C
10/06/2025
Violation issued (HPD, closed)
A
10/06/2025
Violation issued (HPD, closed)
B
10/06/2025
Violation issued (HPD, closed)
B
10/06/2025
Violation issued (HPD, closed)
B
10/06/2025
Violation issued (HPD, closed)
A
10/06/2025
Violation issued (HPD, closed)
C
07/28/2025
Signed off — Alteration
HEREWITH FILE FACADE RESTORATION AS PER PLANS
Q01110914-I1
07/17/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
Q01124526-I1
03/10/2025
Signed off — Alteration
INSTALLATION OF A TOTAL VENTILAITON SYSTEM FOR 8 GAS DRYERS INCLUDING MAKEUP AND EXHAUST AIR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00454760-I1
03/06/2025
Signed off — Alteration
INSTALLATION OF GAS DRYERS, WASHING MACHINES AND SPRINKLER HEADS OFF THE DOMESTIC IN THE CELLAR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00454730-I1
10/23/2024
Permit issued — General Construction
Q01110914-I1-GC
10/16/2024
Permit issued — Sidewalk Shed
Q01124526-I1-SH
10/10/2024
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
Q01124526-I1
09/16/2024
Filed — Alteration
HEREWITH FILE FACADE RESTORATION AS PER PLANS
Q01110914-I1
09/13/2024
Special inspection requirement — Final
David Merabyan
09/13/2024
Special inspection requirement — Tenant Protection Plan Compliance
Leo Lee
09/13/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
David Merabyan
09/13/2024
Special inspection requirement — Post-installed Anchors
David Merabyan
09/13/2024
Special inspection requirement — Masonry
David Merabyan
08/15/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
bassam (sam) rimawi
08/13/2024
Filed — Alteration
INSTALLATION OF GAS DRYERS, WASHING MACHINES AND SPRINKLER HEADS OFF THE DOMESTIC IN THE CELLAR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00454730-P1
07/05/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
bassam (sam) rimawi
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/20/2023
Permit issued — Plumbing
Q00454730-I1-PL
07/20/2022
Signed off — Alteration
Q00685190-I1
06/22/2022
Permit issued — General Construction
Q00685190-I1-GC
03/07/2022
Filed — Alteration
Q00685190-I1
02/23/2022
Special inspection requirement — Fire-Resistance Rated Construction
James Hill
02/22/2022
Special inspection requirement — Final
James Hill
02/22/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
James Hill
02/03/2022
Filed — Alteration
Q00642836-I1
12/20/2021
Signed off — Alteration
Brick replacement, re-pointing, window lintel replacement and window sill replacement as per plan.
Q00591299-I1
12/13/2021
Signed off — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2014 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Q00591434-I1
12/06/2021
Special inspection requirement — Final
William Ryan
12/06/2021
Special inspection requirement — Mechanical Systems
William Ryan
10/08/2021
Permit issued — General Construction
Q00591299-I1-GC
10/05/2021
Filed — Alteration
Brick replacement, re-pointing, window lintel replacement and window sill replacement as per plan.
Q00591299-I1
09/13/2021
Permit issued — Sidewalk Shed
Q00591434-I1-SH
09/12/2021
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2014 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Q00591434-I1
09/10/2021
Special inspection requirement — Final
RAFI HAMID
09/09/2021
Special inspection requirement — Final
Vicente Varela
09/09/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
BRIAN T. O'CONNOR
09/09/2021
Special inspection requirement — Masonry
BRIAN T. O'CONNOR
06/11/2021
Permit issued — Plumbing
Q00454730-I1-PL
02/04/2021
Permit issued — Mechanical Systems
Q00454760-I1-MS
01/19/2021
Filed — Alteration
INSTALLATION OF A TOTAL VENTILAITON SYSTEM FOR 8 GAS DRYERS INCLUDING MAKEUP AND EXHAUST AIR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00454760-I1
01/19/2021
Filed — Alteration
INSTALLATION OF GAS DRYERS, WASHING MACHINES AND SPRINKLER HEADS OFF THE DOMESTIC IN THE CELLAR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00454730-I1
01/15/2021
Special inspection requirement — Mechanical Systems
bassam (sam) rimawi
01/15/2021
Special inspection requirement — Final
bassam (sam) rimawi
01/15/2021
Special inspection requirement — Maintenance information
bassam (sam) rimawi
01/15/2021
Special inspection requirement — Preliminary
bassam (sam) rimawi
01/15/2021
Special inspection requirement — Energy Code Compliance Inspections
bassam (sam) rimawi
01/15/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
bassam (sam) rimawi
11/01/2019
Violation issued (HPD, closed)
I
07/29/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/26/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/22/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
04/22/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
Latest 60 of 106 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offSASCO BUILDERS INC10/23/2024
DOB NOWSidewalk ShedSigned-offSASCO BUILDERS INC10/16/2024
DOB NOWPlumbingSigned-offADVANCED PLUMBING MECH03/20/2023
DOB NOWGeneral ConstructionSigned-offWJ CONTRACTING CORP06/22/2022
DOB NOWGeneral ConstructionSigned-offR.N.K. ROMEO CONST INC10/08/2021
DOB NOWSidewalk ShedSigned-offJASCO, INC09/13/2021
DOB NOWPlumbingSigned-offADVANCED PLUMBING MECH06/11/2021
DOB NOWMechanical SystemsSigned-offLXS AIR INC02/04/2021
BISOTISSUEDBROOKLYN SOLARWORKS LLC10/27/2021
BISPLISSUEDTRADELINE PLUMBING INC01/23/2019
BISPLISSUEDCROWN PLUMBING INC12/05/2018
BISFSISSUEDG. BAUER, INC09/22/2016
BISOTISSUEDG. BAUER, INC09/22/2016
BISFSISSUEDC C CONTROLLED COMBUSTION05/14/2012
BISOTISSUEDC C CONTROLLED COMBUSTION04/14/2010
BISPLISSUEDARANDA PLBG & HTG CORP10/13/2004
BISOTISSUEDBUILDING CONSTRUCTION SERVICE08/27/2004
BISOTISSUEDMUNICIPAL BUILDING CONSULTANTS03/22/2004
BISEQISSUEDMUNICIPAL BUILDING CONSULTANTS03/22/2004
BISEQISSUEDMASCON RESTORATION11/16/1999
BISEQISSUEDMASCON RESTORATION01/15/1999
BISEQISSUEDMASCON RESTORATION07/16/1998
BISPLISSUEDEBM PLUMBING CORP09/12/1994
BISOTISSUEDVETA STEAM AND POWER,INC09/08/1994
6 projects · most recent 07/10/2026
General Wiring
FiledStatusContractorScope
07/10/2026Permit IssuedELMAC ELECTRIC INC.General Wiring
10/17/2024CompleteRICHARD NEU—
11/22/2021CompleteBROOKYLN SOLARWORKS, LLC—
09/29/2021Permit IssuedRICHARD NEU—
11/10/2020CompleteLEONE ELECTRIC CO. INCGeneral Wiring
01/24/2019CompleteAPS ELECTRIC INCGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 22
DateRequirementInspectorRole
09/13/2024FinalDavid Merabyanprogress
09/13/2024Tenant Protection Plan ComplianceLeo Leespecial
09/13/2024Structural Stability – Alterations of existing buildingsDavid Merabyanspecial
09/13/2024Post-installed AnchorsDavid Merabyanspecial
09/13/2024MasonryDavid Merabyanspecial
08/15/2024Fire-Resistant Penetrations and Jointsbassam (sam) rimawispecial
07/05/2024Fire-Resistant Penetrations and Jointsbassam (sam) rimawispecial
02/23/2022Fire-Resistance Rated ConstructionJames Hillprogress
02/22/2022FinalJames Hillprogress
02/22/2022Fire-Resistant Penetrations and JointsJames Hillspecial
12/06/2021FinalWilliam Ryanprogress
12/06/2021Mechanical SystemsWilliam Ryanspecial
09/10/2021FinalRAFI HAMIDprogress
09/09/2021FinalVicente Varelaprogress
09/09/2021Structural Stability – Alterations of existing buildingsBRIAN T. O'CONNORspecial
09/09/2021MasonryBRIAN T. O'CONNORspecial
01/15/2021Mechanical Systemsbassam (sam) rimawispecial
01/15/2021Finalbassam (sam) rimawiprogress
01/15/2021Maintenance informationbassam (sam) rimawienergy_progress
01/15/2021Preliminarybassam (sam) rimawiprogress
01/15/2021Energy Code Compliance Inspectionsbassam (sam) rimawiprogress
01/15/2021Fire-Resistant Penetrations and Jointsbassam (sam) rimawispecial
▾Documents — 117 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch6
08/27/2026Q00591434-I1Request digital key ↗
08/27/2026Q00591299-I1Request digital key ↗
08/26/2026Q00642836-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Plumbing2
08/21/2026Q00454730-P1Request digital key ↗
08/21/2026Q00454730-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
08/27/2026Q00454760-I1Request digital key ↗
▸Applications & Permits17
▸BISPLAN / WORK APPROVAL APPLICATION11
05/12/2022421926009Open ↗
04/20/2022421926009Open ↗
03/22/2022421926009Open ↗
Showing 3 of 11 on file for this type
▸BISWORK PERMIT APPLICATION6
10/27/2021440692494Open ↗
01/22/2019440531710Open ↗
12/17/2018421926009Open ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications36
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/27/2026Q00591434-I1Open ↗
08/21/2026Q01124526-I1Open ↗
08/13/2026Q00454760-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
08/28/2026Q00591299-I1Open ↗
08/26/2026Q00591434-I1Open ↗
08/25/2026Q01110914-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
08/31/2026Q00454730-I1Open ↗
08/28/2026Q00591299-I1Open ↗
08/25/2026Q01110914-I1Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
12/19/2018421926009Open ↗
04/14/2017400487996Open ↗
11/30/2016400487996Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
01/22/2019440531710Open ↗
12/19/2018421926009Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
01/22/2019440531710Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
10/20/2021440692494Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
12/19/2018421926009Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
01/22/2019440531710Open ↗
▸Trade Schedules & Equipment6
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT3
04/14/2017400487996Open ↗
11/30/2016400487996Open ↗
11/30/2016400487996Open ↗
▸BISSCHEDULE B - PLUMBING2
03/21/2022421926009Open ↗
01/22/2019440531710Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
12/19/2018421926009Open ↗
▸Safety & Tenant Protection4
▸BISTPP1: TENANT PROTECTION PLAN2
10/27/2021440692494Open ↗
10/20/2021440692494Open ↗
▸BISTenant Protection Plan and Notes2
12/19/2018421926009Open ↗
01/22/2019440531710Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/13/2026Q00454760-I1Open ↗
08/13/2026Q00454730-I1Open ↗
08/13/2026Q00454730-P1Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
10/20/2021440692494Open ↗
01/22/2019440531710Open ↗
12/19/2018421926009Open ↗
▸Energy Compliance14
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
04/22/2022421926009Open ↗
04/13/2022440692494Open ↗
10/20/2021440692494Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS3
05/02/2022421926009Open ↗
04/22/2022421926009Open ↗
04/13/2022440692494Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
12/19/2018421926009Open ↗
11/30/2016400487996Open ↗
▸BISSOLAR TAX ABATEMENT APPLICATION1
04/14/2022440692494Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
10/20/2021440692494Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
01/22/2019440531710Open ↗
▸BISTR8 INSPECTOR TO CONFIRM AS-BUILT VALUES1
05/02/2022421926009Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026Q00454760-I1Open ↗
▸Inspections & Test Reports5
▸BISTECHNICAL REPORT: RESPONSIBILITY5
05/02/2022421926009Open ↗
04/22/2022421926009Open ↗
04/13/2022440692494Open ↗
Showing 3 of 5 on file for this type
▸Approvals, Objections & Sign-offs6
▸BISLETTERS - SUPPORTING DOCUMENTATION3
04/14/2022440692494Open ↗
09/24/2016400487996Open ↗
09/24/2016400487996Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
05/03/2022421926009Open ↗
04/14/2022440692494Open ↗
06/15/2018400487996Open ↗
▸Cost, Insurance & Ownership6
▸BISCOST AFFIDAVIT6
05/02/2022421926009Open ↗
04/22/2022421926009Open ↗
04/13/2022440692494Open ↗
Showing 3 of 6 on file for this type
▸Filing & Intake Forms6
▸BISEFILING JOB APPLICATION COVER SHEET2
10/20/2021440692494Open ↗
01/22/2019440531710Open ↗
▸BISADDITIONAL INFORMATION2
10/20/2021440692494Open ↗
04/14/2017400487996Open ↗
▸BISEFILING COVER SHEET1
12/19/2018421926009Open ↗
▸BISBOROUGH INTAKE FORM1
06/15/2018400487996Open ↗