← Back
BuildNYC
Elevator cooperative
86-10 GRAND AVENUE
QUEENS · Elmhurst · BIN 4064930
💬 Discuss this project
1959Year Built
6Stories
D4Building Class
R6BZoning
66,924 sfGross Floor Area
100Units
LL97 CoveredRent Stabilized9 Active Violations ▸FISP: SAFE
Elevator cooperative · 19,800 sf lot · 3.38 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanical
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofDomnitch Management CO LLC1p · 1 filing · 3 docs
Site & exteriorDomnitch Management CO LLC10p · 2 filings · 6 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
KZ Engineering106/08/2021
Cataldo Properties105/11/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Municipal Building Consultants103/21/2026
Synergy Building Consultants103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RCD RestorationsGeneral Contractor107/08/2026
Arsenal ScaffoldScaffold107/08/2026
BMC PLGPlumbing105/26/1995
Everest ScaffoldingGeneral Contractor108/15/2011
Building Lifecycle
02/20/2027
Facade inspection report due (FISP Cycle 9, sub-cycle A)
The filing window opened 02/21/2025. No Cycle 9 filing on record yet
08/26/2026
Boiler inspection report filed
Subsequent · no defects · Accepted
07/10/2026
Elevator Category 1 inspection report filed
06/25/2026
Boiler inspection report filed
Initial · defects found · Accepted
05/01/2026
Failure to maintain parking structures in safe conditions. As noted: at time of inspection on an occupied parking structures consisting of 01…
ECB violation · open
95 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedSigned-offArsenal Scaffold06/09/2021
DOB NOWGeneral ConstructionSigned-offRCD Restorations05/19/2021
BISEQISSUEDEverest Scaffolding08/15/2011
BISFSISSUEDA.L. Eastmond09/12/2003
BISFSISSUEDAbilene05/26/1995
BISPLISSUEDBMC PLG05/26/1995
1 project · most recent 05/12/2021
FiledStatusContractorScope
05/12/2021CompleteNash Electric Services—
▾Special Inspection Requirements (DOB NOW) — 1
DateRequirementInspectorRole
05/13/2021FinalKarol Zdancewiczprogress
46 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account