← Back
Cape Cod
86-16 PINTO STREET
QUEENS · BIN 4224106
💬 Discuss this project
1940Year Built
1.75Stories
A0Building Class
R1-2Zoning
3,132 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Cape Cod · 15,120 sf lot · 0.21 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
8616 PINTO LLC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/06/2019$1.1M—Private party → 8616 PINTO LLC$351/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RAS PE CONSULTING ENGINEERS306/30/2026
AMINOV DESIGN ENGINEER, PC304/01/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
A D BUILDING SOLUTIONS403/21/2026
Building Lifecycle
All (60)Filed (6)Violation (1)Objection (23)Special Inspection (30)
07/07/2026
Objection raised — Other
07/01/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
07/01/2026
Special inspection requirement — Mechanical Systems
07/01/2026
Special inspection requirement — Final
07/01/2026
Special inspection requirement — Fire-Resistance Rated Construction
07/01/2026
Special inspection requirement — Energy Code Compliance Inspections
07/01/2026
Special inspection requirement — Metering
07/01/2026
Special inspection requirement — Insulation placement and R values
07/01/2026
Special inspection requirement — Electric vehicle service equipment requirements
07/01/2026
Special inspection requirement — HVAC-R and service water heating system controls
07/01/2026
Special inspection requirement — Fenestration air leakage
07/01/2026
Special inspection requirement — Maintenance information
07/01/2026
Special inspection requirement — Fenestration areas
07/01/2026
Special inspection requirement — Air barrier - visual inspection
07/01/2026
Special inspection requirement — Ventilation and air distribution system
07/01/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
07/01/2026
Special inspection requirement — Interior lighting power
07/01/2026
Special inspection requirement — Protection of exposed foundation insulation
07/01/2026
Special inspection requirement — HVAC-R and service water heating equipment
07/01/2026
Special inspection requirement — Permanent certificate
07/01/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
06/30/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
Herewith filing SOE plans of 2-story ALT-1 building. The SOE involves 1:1 excavation & installation of timber shores.
Q00478730-Z2
06/30/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
Herewith filing SOE plans of 2-story ALT-1 building. The SOE involves 1:1 excavation & installation of timber shores.
Q00478730-Z1
06/30/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
Herewith filing SOE plans of 2-story ALT-1 building. The SOE involves 1:1 excavation & installation of timber shores.
Q00478730-S9
06/30/2026
Special inspection requirement — Concrete - Cast-In-Place
06/30/2026
Special inspection requirement — Subgrade Inspections
06/30/2026
Special inspection requirement — Underpinning
06/30/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
06/30/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
06/30/2026
Special inspection requirement — Final
06/30/2026
Special inspection requirement — Footing and Foundation
06/24/2026
Objection resolved — Addressed
04/06/2026
Objection raised — Scope
04/01/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
Herewith filing SOE plans of 2-story ALT-1 building. The SOE involves 1:1 excavation & installation of timber shores.
Q00478730-P1
12/07/2025
Special inspection requirement — Final
12/07/2025
Special inspection requirement — Mechanical Systems
12/07/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
06/17/2024
Violation issued (ECB, closed)
Construction
10/11/2021
Filed — ALT-CO - New Building with Existing Elements to Remain
Herewith filing SOE plans of 2-story ALT-1 building. The SOE involves 1:1 excavation & installation of timber shores.
Q00478730-S1
09/27/2021
Objection raised — Structural
09/27/2021
Objection resolved — Addressed
09/01/2021
Objection resolved — Addressed
08/31/2021
Objection raised — Scope
08/19/2021
Objection resolved — Addressed
08/03/2021
Objection resolved — Addressed
08/03/2021
Objection resolved — Addressed
08/03/2021
Objection resolved — Addressed
07/19/2021
Objection raised — Scope
07/19/2021
Objection raised — Zoning
07/08/2021
Objection resolved — Addressed
07/08/2021
Objection resolved — Addressed
06/16/2021
Objection resolved — Addressed
05/05/2021
Objection resolved — Addressed
03/26/2021
Objection raised — Other
03/26/2021
Objection raised — Other
03/19/2021
Objection raised — Other
03/19/2021
Objection raised — Other
03/19/2021
Objection raised — Other
03/19/2021
Objection raised — Other
03/03/2021
Filed — ALT-CO - New Building with Existing Elements to Remain
Herewith filing SOE plans of 2-story ALT-1 building. The SOE involves 1:1 excavation & installation of timber shores.
Q00478730-I1
Nothing on file for this building.
1 project · most recent 06/30/2026
Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
06/30/2026——Air Conditioning Systems, Heating Systems
Cooling
Fujitsu AOU48RLXFZ 48,000 BTU · Heat Pump Outdoor ×8
Heating
Fujitsu AOU48RLXFZ 54,000 BTU · Heat Pump Outdoor ×8
1 project · most recent 03/30/2020
FiledStatusContractorScope
03/30/2020Permit IssuedTRIANGLE ELECTRIC INC.1 meters
1 project · most recent 06/30/2026
Steel Concrete Wood
FiledStatusContractorScope
06/30/2026——Steel, Concrete, Wood
1 project · most recent 06/30/2026
Fence
FiledStatusContractorScope
06/30/2026——Fence
▾Special Inspection Requirements (DOB NOW) — 47
DateRequirementInspectorRole
07/01/2026Structural Stability – Alterations of existing buildings—special
07/01/2026Mechanical Systems—special
07/01/2026Final—progress
07/01/2026Fire-Resistance Rated Construction—progress
07/01/2026Energy Code Compliance Inspections—progress
07/01/2026Metering—energy_progress
07/01/2026Insulation placement and R values—energy_progress
07/01/2026Electric vehicle service equipment requirements—energy_progress
07/01/2026HVAC-R and service water heating system controls—energy_progress
07/01/2026Fenestration air leakage—energy_progress
07/01/2026Maintenance information—energy_progress
07/01/2026Fenestration areas—energy_progress
07/01/2026Air barrier - visual inspection—energy_progress
07/01/2026Ventilation and air distribution system—energy_progress
07/01/2026Fenestration and door U-factor and product ratings—energy_progress
07/01/2026Interior lighting power—energy_progress
07/01/2026Protection of exposed foundation insulation—energy_progress
07/01/2026HVAC-R and service water heating equipment—energy_progress
07/01/2026Permanent certificate—energy_progress
07/01/2026HVAC-R and service water piping design and insulation—energy_progress
06/30/2026Concrete - Cast-In-Place—special
06/30/2026Subgrade Inspections—special
06/30/2026Underpinning—special
06/30/2026Structural Stability – Alterations of existing buildings—special
06/30/2026Subsurface Investigations (Borings/Test Pits)—special
Latest 25 of 47.
▾Documents — 36 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/27/2026Q00478730-S9Request digital key ↗
08/27/2026Q00478730-S1Request digital key ↗
08/27/2026Q00478730-Z1Request digital key ↗
Showing 3 of 6 on file for this type
▸Applications & Permits2
▸BISBPP-5 - Authorization to the Department of Transportation1
11/12/2021440685992Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
10/10/2021440685992Open ↗
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram2
08/15/2026Q00478730-P1Open ↗
08/15/2026Q00478730-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/15/2026Q00478730-I1Open ↗
▸Seals & Professional Certifications8
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/27/2026Q00478730-S1Open ↗
08/27/2026Q00478730-Z1Open ↗
08/27/2026Q00478730-S9Open ↗
Showing 3 of 6 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
10/10/2021440685992Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
10/10/2021440685992Open ↗
▸Trade Schedules & Equipment2
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/15/2026Q00478730-P1Open ↗
08/15/2026Q00478730-I1Open ↗
▸Safety & Tenant Protection1
▸BISSTREET TREE CHECKLIST1
11/12/2021440685992Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/27/2026Q00478730-Z1Open ↗
08/27/2026Q00478730-S9Open ↗
08/27/2026Q00478730-S1Open ↗
Showing 3 of 6 on file for this type
▸Inspections & Test Reports1
▸DOB NOWSOIL REPORT1
08/27/2026Q00478730-Z1Open ↗
▸Filing & Intake Forms2
▸BISEFILING JOB APPLICATION COVER SHEET1
10/10/2021440685992Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
10/10/2021440685992Open ↗
▸Other Documents5
▸DOB NOWSite Survey: Initial2
08/15/2026Q00478730-P1Open ↗
08/15/2026Q00478730-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/15/2026Q00478730-P1Open ↗
08/15/2026Q00478730-I1Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
10/10/2021440685992Open ↗