86-30 BROADWAY
QUEENS · BIN 4038769
💬 Discuss this project
1972Year Built
3Stories
K4Building Class
R7AZoning
3,840 sfGross Floor Area
8Units
0 Open ViolationsFDNY Report ↗
Predominantly retail with other uses · 2,219 sf lot · 1.73 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Cellar3p · 2 filings · 18 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RLM ENGINEERING PLLC504/24/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
FHILAIRE HEATING & COOLGeneral Contractor307/08/2026
METROCITY GROUP,INCPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
RLM ENGINEERING PLLC6913504/24/2023
Building Lifecycle
All (44)Filed (5)Permit Issued (4)Signed Off (3)Violation (10)Inspection (6)Special Inspection (16)
07/18/2023
Signed off — Alteration
Filing for the installation of one new sump pit with sump pump, two new hot water heaters in the cellar and one gas unit space heater on the first floor vented thru roof extension with related gas piping as per plans filed herewith.
Q07994259-I1
07/18/2023
Signed off — Alteration
Filing for the installation of a new 3.5 ton air conditioning system on the first floor as per plans filed herewith.
Q07994261-I1
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/05/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/24/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/19/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/26/2023
Signed off — Alteration
Filing for the replacement of existing gas boiler with new in the cellar connected to existing chimney as per plans filed herewith.
Q07994242-I1
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/24/2023
Filed — Alteration
Filing for the installation of one new sump pit with sump pump, two new hot water heaters in the cellar and one gas unit space heater on the first floor vented thru roof extension with related gas piping as per plans filed herewith.
Q07994259-P1
04/17/2023
Special inspection requirement — Energy Code Compliance Inspections
Ronald Merhige
04/17/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Ronald Merhige
04/17/2023
Special inspection requirement — Maintenance information
Ronald Merhige
04/17/2023
Special inspection requirement — HVAC-R and service water heating equipment
Ronald Merhige
04/17/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ronald Merhige
03/24/2023
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
03/16/2023
Inspection — No Access-Final Boiler Equipment Inspection
No Access
View inspection ↗
02/16/2023
Permit issued — Mechanical Systems
Q07994261-I1-MS
02/10/2023
Permit issued — Boiler Equipment
Q07994242-I1-BE
02/06/2023
Filed — Alteration
Filing for the installation of a new 3.5 ton air conditioning system on the first floor as per plans filed herewith.
Q07994261-P1
02/01/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/24/2023
Special inspection requirement — HVAC-R and service water heating equipment
Ronald Merhige
01/24/2023
Special inspection requirement — Energy Code Compliance Inspections
Ronald Merhige
01/24/2023
Special inspection requirement — Final
Ronald Merhige
01/24/2023
Special inspection requirement — Maintenance information
Ronald Merhige
01/24/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Ronald Merhige
01/24/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ronald Merhige
01/24/2023
Special inspection requirement — Mechanical Systems
Ronald Merhige
01/18/2023
Permit issued — Mechanical Systems
Q07994261-I1-MS
12/31/2022
Permit issued — Plumbing
Q07994259-I1-PL
10/26/2022
Filed — Alteration
Filing for the installation of one new sump pit with sump pump, two new hot water heaters in the cellar and one gas unit space heater on the first floor vented thru roof extension with related gas piping as per plans filed herewith.
Q07994259-I1
10/26/2022
Filed — Alteration
Filing for the installation of a new 3.5 ton air conditioning system on the first floor as per plans filed herewith.
Q07994261-I1
10/26/2022
Filed — Alteration
Filing for the replacement of existing gas boiler with new in the cellar connected to existing chimney as per plans filed herewith.
Q07994242-I1
10/26/2022
Special inspection requirement — HVAC-R and service water heating equipment
Ronald Merhige
10/26/2022
Special inspection requirement — HVAC-R and service water heating system controls
Ronald Merhige
08/26/2022
Special inspection requirement — Maintenance information
Ronald Merhige
08/26/2022
Special inspection requirement — Heating Systems
Ronald Merhige
11/08/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/23/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/26/2010
Violation issued (ECB, closed)
Construction
01/01/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/29/1995
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/07/1994
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/26/1991
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offFHILAIRE HEATING COOL02/16/2023
DOB NOWBoiler EquipmentSigned-offMETROCITY GROUP,INC02/10/2023
DOB NOWMechanical SystemsSigned-offFHILAIRE HEATING COOL01/18/2023
DOB NOWPlumbingSigned-offMETROCITY GROUP,INC12/31/2022
BISEQISSUEDARSENAL SCAFFOLD INC02/15/2013
BISPLISSUEDBEST PLUMBING & HVAC INC08/08/2008
BISOTISSUEDN/A05/11/1994
BISPLISSUEDTOWN & COUNTRY_PLG06/09/1993
BIS—ISSUEDN/A05/20/1993
2 projects · most recent 01/17/2024
FiledStatusContractorScope
01/17/2024CompleteFIU CORP DBA FIU ELECTRIC4 meters, 4 new_meters
03/26/2019Permit IssuedMILLENNIUM MAINT & ELEC'L4 meters, 4 new_meters
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
06/05/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/24/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/19/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/24/2023Pass-Final Boiler Equipment InspectionPassView ↗
03/16/2023No Access-Final Boiler Equipment InspectionNo AccessView ↗
02/01/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 16
DateRequirementInspectorRole
04/17/2023Energy Code Compliance InspectionsRonald Merhigeprogress
04/17/2023HVAC-R and service water piping design and insulationRonald Merhigeenergy_progress
04/17/2023Maintenance informationRonald Merhigeenergy_progress
04/17/2023HVAC-R and service water heating equipmentRonald Merhigeenergy_progress
04/17/2023Fire-Resistant Penetrations and JointsRonald Merhigespecial
01/24/2023HVAC-R and service water heating equipmentRonald Merhigeenergy_progress
01/24/2023Energy Code Compliance InspectionsRonald Merhigeprogress
01/24/2023FinalRonald Merhigeprogress
01/24/2023Maintenance informationRonald Merhigeenergy_progress
01/24/2023HVAC-R and service water piping design and insulationRonald Merhigeenergy_progress
01/24/2023Fire-Resistant Penetrations and JointsRonald Merhigespecial
01/24/2023Mechanical SystemsRonald Merhigespecial
10/26/2022HVAC-R and service water heating equipmentRonald Merhigeenergy_progress
10/26/2022HVAC-R and service water heating system controlsRonald Merhigeenergy_progress
08/26/2022Maintenance informationRonald Merhigeenergy_progress
08/26/2022Heating SystemsRonald Merhigespecial
▾Documents — 53 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/25/2026Q07994242-I1Request digital key ↗
08/25/2026Q07994261-I1Request digital key ↗
08/25/2026Q07994261-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits4
▸BISWORK PERMIT APPLICATION3
08/08/2008410148157Open ↗
08/08/2008410148157Open ↗
08/08/2008410148157Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
08/08/2008410148157Open ↗
▸Seals & Professional Certifications28
▸DOB NOWProgress Inspector Seal & Signature12
09/29/2026Q07994261-P1Open ↗
09/29/2026Q07994261-P1Open ↗
09/29/2026Q07994261-P1Open ↗
Showing 3 of 12 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION5
04/16/2013420813668Open ↗
01/20/2010410148157Open ↗
08/08/2008410148157Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/25/2026Q07994242-I1Open ↗
08/24/2026Q07994259-I1Open ↗
08/24/2026Q07994259-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/29/2026Q07994261-P1Open ↗
09/29/2026Q07994261-P1Open ↗
09/23/2026Q07994242-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
08/08/2008410148157Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
08/08/2008410148157Open ↗
▸Trade Schedules & Equipment2
▸BISSELF-CERT PLUMBING NOTICE1
02/10/2009410148157Open ↗
▸BISSCHEDULE B - PLUMBING1
08/08/2008410148157Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/25/2026Q07994242-I1Open ↗
08/24/2026Q07994259-I1Open ↗
08/24/2026Q07994259-P1Open ↗
Showing 3 of 5 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
08/08/2008410148157Open ↗
▸Approvals, Objections & Sign-offs5
▸BISLETTERS - SUPPORTING DOCUMENTATION2
04/16/2013420813668Open ↗
01/20/2010410148157Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
04/16/2013420813668Open ↗
01/20/2010410148157Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
08/08/2008410148157Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
01/20/2010410148157Open ↗
08/08/2008410148157Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
08/08/2008410148157Open ↗