← Back
Two family frame
86-32 111 STREET
QUEENS · Richmond Hill · BIN 4192611
💬 Discuss this project
1901Year Built
2.5Stories
B2Building Class
R3XZoning
2,334 sfGross Floor Area
2Units
3 Open Violations ▸FDNY Report ↗
Two family frame · 5,000 sf lot · 0.47 FAR built · Flood zone X
Locations of Work
Electrical
Roof3p · 1 filing · 8 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC108/21/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUNRUN103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUNRUN INSTALLATION SVCGeneral Contractor203/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272108/21/2024
Building Lifecycle
All (11)Filed (1)Permit Issued (1)Violation (4)Special Inspection (5)
09/04/2024
Permit issued — Solar
Q01091346-I1-SL
08/21/2024
Filed — Alteration
Q01091346-I1
08/05/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
08/05/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
08/05/2024
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
08/05/2024
Special inspection requirement — Final
Walid Abdulla
08/05/2024
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
07/09/2011
Violation issued (ECB, closed)
Construction
03/16/2011
Violation issued (HPD, open)
B
03/16/2011
Violation issued (HPD, open)
B
03/16/2011
Violation issued (HPD, open)
B
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarPermit IssuedSUNRUN INSTALLATION SVC09/04/2024
1 project · most recent 08/21/2024
FiledStatusContractorScope
08/21/2024Permit IssuedSUNRUN SOLAR ELECTL CORP—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
08/05/2024Fire-Resistant Penetrations and JointsWalid Abdullaspecial
08/05/2024Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
08/05/2024Energy Code Compliance InspectionsWalid Abdullaprogress
08/05/2024FinalWalid Abdullaprogress
08/05/2024Air barrier - visual inspectionWalid Abdullaenergy_progress
▾Documents — 8 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/21/2026Q01091346-I1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWProgress Inspector Seal & Signature3
09/02/2026Q01091346-I1Open ↗
09/02/2026Q01091346-I1Open ↗
09/02/2026Q01091346-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/02/2026Q01091346-I1Open ↗
09/02/2026Q01091346-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026Q01091346-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026Q01091346-I1Open ↗