← Back
Two stories - detached, small or mid-size
86-32 249 STREET
QUEENS · BIN 4176031
💬 Discuss this project
1935Year Built
2.5Stories
A1Building Class
R2AZoning
1,120 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 3,680 sf lot · 0.3 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC108/20/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUNRUN103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUNRUN INSTALLATION SVCGeneral Contractor104/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272108/20/2025
Building Lifecycle
All (7)Filed (1)Permit Issued (1)Special Inspection (5)
08/26/2025
Permit issued — Solar
Q01274110-I1-SL
08/20/2025
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01274110-I1
08/19/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
08/19/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
08/19/2025
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
08/19/2025
Special inspection requirement — Final
Walid Abdulla
08/19/2025
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC08/26/2025
1 job · most recent 08/20/2025
FiledStatusContractorScope
08/20/2025CompleteSUNRUN SOLAR ELECTL CORP—
1 job · most recent 08/20/2025
FiledStatusContractorScope
08/20/2025Signed-offSUNRUN INSTALLATION SVC20 panels, 8.2 kw, 210.23 roof_area_sqft
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
08/19/2025Fire-Resistant Penetrations and JointsWalid Abdullaspecial
08/19/2025Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
08/19/2025Energy Code Compliance InspectionsWalid Abdullaprogress
08/19/2025FinalWalid Abdullaprogress
08/19/2025Air barrier - visual inspectionWalid Abdullaenergy_progress
▾Documents — 9 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/19/2026Q01274110-I1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWProgress Inspector Seal & Signature3
09/01/2026Q01274110-I1Open ↗
09/01/2026Q01274110-I1Open ↗
09/01/2026Q01274110-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/01/2026Q01274110-I1Open ↗
09/01/2026Q01274110-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026Q01274110-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026Q01274110-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01274110-I1Open ↗