Public elementary, junior or senior high
Public School 18
86-35 235TH COURT · Name © OpenStreetMap contributors · Bellerose · BIN 4166561
💬 Discuss this project
1960Year Built
2Stories
W1Building Class
R3-2Zoning
52,000 sfGross Floor Area
0Units
LL97 Covered2 Active Violations 0 unresolved · 2 paperwork only ▸FDNY Report ↗
Public elementary, junior or senior high · Owner of record: NYC Department of Parks and Recreation · 58,140 sf lot · 0.89 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofP.S. 184 - Queens1 filing · 17 docs
Floor 2P.S. 184 - Queens1 filing · 17 docs
Floor 1P.S. 184 - Queens, P.S. 18 Winchester2 filings · 17 docs
CellarP.S. 18 Winchester, P.S. 184 - QueensUnder Construction8p · 2 filings · 18 docs
Site & exteriorP.S. 18 WinchesterUnder Construction24p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC School Construction Authority9507/08/2026
Generate Hudson Solar503/22/2026
NYC Department of Education303/22/2026
National Grid103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NYC School Construction Authority402/12/2025
Eme Consulting Engineering Group110/01/2024
NYMS Consulting807/14/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NYC School Construction Authority403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Central Mechanical SystemsScaffold3707/08/2026
Central Mechanical Systemsspecialty_contractor1807/08/2026
Falcon Electrical ContractingElectrical103/22/2026
Prince ElectricElectrical103/21/2026
Laser Electrical Constr'gElectrical103/22/2026
A & S ElectricElectrical103/21/2026
Ecny Electrical ContractorsElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JPC Logistics Dba JPCL EN351110/01/2024
Universal Testing and Ins400607/14/2022
Building Lifecycle
All (150)Filed (13)Permit Issued (38)Violation (60)Inspection (1)Objection (8)Special Inspection (30)
03/12/2026
Permit issued — Mechanical Systems
Q00758703-S2-MS
03/10/2026
Permit issued — Construction Fence
Q00758703-I1-FN
03/10/2026
Permit issued — Construction Fence
Q00405713-I1-FN
03/10/2026
Permit issued — Mechanical Systems
Q00403339-I1-MS
02/18/2026
Violation issued (ECB, open)
Construction
02/18/2026
Violation issued (ECB, open)
Construction
09/19/2025
Permit issued — Construction Fence
Q00758703-I1-SH
04/08/2025
Objection resolved — Addressed
03/28/2025
Objection resolved — Addressed
03/28/2025
Special inspection requirement — Air barrier - visual inspection
03/28/2025
Special inspection requirement — Insulation placement and R values
03/28/2025
Special inspection requirement — Protection of exposed foundation insulation
03/26/2025
Permit issued — Mechanical Systems
Q00403339-I1-MS
03/26/2025
Objection resolved — Addressed
03/26/2025
Objection resolved — Addressed
03/25/2025
Permit issued — Sidewalk Shed
Q00758703-I1-FN
03/25/2025
Permit issued — Mechanical Systems
Q00758703-S2-MS
03/25/2025
Permit issued — Construction Fence
Q00405713-I1-FN
03/12/2025
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
03/12/2025
Special inspection requirement — Energy Code Compliance Inspections
03/12/2025
Special inspection requirement — Final
03/11/2025
Special inspection requirement — Final
03/03/2025
Violation issued (ECB, closed)
Construction
03/03/2025
Violation issued (ECB, closed)
Construction
03/03/2025
Violation issued (ECB, closed)
Construction
03/03/2025
Violation issued (ECB, closed)
Construction
03/03/2025
Violation issued (ECB, closed)
Construction
02/21/2025
Objection raised — Other
02/21/2025
Objection raised — Other
02/21/2025
Objection raised — Admin
02/21/2025
Objection raised — Other
02/12/2025
Filed — Alteration
Existing Spandrel reinforcing work around the perimeter of the roof.
Q01112506-S4
02/12/2025
Filed — Alteration
Existing Spandrel reinforcing work around the perimeter of the roof.
Q01112506-S3
02/12/2025
Filed — Alteration
Existing Spandrel reinforcing work around the perimeter of the roof.
Q01112506-S5
02/12/2025
Special inspection requirement — Structural Steel - Welding
02/12/2025
Special inspection requirement — Post-installed Anchors
02/12/2025
Special inspection requirement — Concrete - Cast-In-Place
02/11/2025
Filed — Alteration
Existing Spandrel reinforcing work around the perimeter of the roof.
Q01112506-I1
02/11/2025
Special inspection requirement — Post-installed Anchors
02/11/2025
Special inspection requirement — Structural Steel - Details
02/11/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
02/11/2025
Special inspection requirement — Final
02/11/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
02/11/2025
Special inspection requirement — Maintenance information
02/11/2025
Special inspection requirement — Exterior lighting power
02/11/2025
Special inspection requirement — Lighting controls
02/11/2025
Special inspection requirement — Energy Code Compliance Inspections
02/11/2025
Special inspection requirement — Masonry
02/11/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
02/11/2025
Special inspection requirement — Concrete - Cast-In-Place
10/01/2024
Filed — Alteration
Q01088638-I1
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/17/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
09/04/2024
Permit issued — Construction Fence
Q00758703-I1-SH
05/15/2024
Permit issued — Construction Fence
Q00405713-I1-SH
04/04/2024
Permit issued — Sidewalk Shed
Q00405713-I1-FN
03/28/2024
Permit issued — Construction Fence
Q00758703-I1-FN
03/28/2024
Permit issued — Mechanical Systems
Q00758703-S2-MS
03/27/2024
Permit issued — Mechanical Systems
Q00403339-I1-MS
Latest 60 of 150 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedCentral Mechanical System03/12/2026
DOB NOWConstruction FencePermit IssuedCentral Mechanical System03/10/2026
DOB NOWConstruction FencePermit IssuedCentral Mechanical System03/10/2026
DOB NOWMechanical SystemsPermit IssuedCentral Mechanical System03/10/2026
DOB NOWConstruction FencePermit IssuedCentral Mechanical System09/19/2025
DOB NOWMechanical SystemsPermit IssuedCentral Mechanical System03/26/2025
DOB NOWSidewalk ShedPermit IssuedCentral Mechanical System03/25/2025
DOB NOWMechanical SystemsPermit IssuedCentral Mechanical System03/25/2025
DOB NOWConstruction FencePermit IssuedCentral Mechanical System03/25/2025
DOB NOWConstruction FencePermit IssuedCentral Mechanical System09/04/2024
DOB NOWConstruction FencePermit IssuedCentral Mechanical System05/15/2024
DOB NOWSidewalk ShedPermit IssuedCentral Mechanical System04/04/2024
DOB NOWConstruction FencePermit IssuedCentral Mechanical System03/28/2024
DOB NOWMechanical SystemsPermit IssuedCentral Mechanical System03/28/2024
DOB NOWMechanical SystemsPermit IssuedCentral Mechanical System03/27/2024
DOB NOWSidewalk ShedPermit IssuedCentral Mechanical System08/15/2023
DOB NOWSidewalk ShedPermit IssuedCentral Mechanical System07/13/2023
DOB NOWSidewalk ShedPermit IssuedCentral Mechanical System05/25/2023
DOB NOWConstruction FencePermit IssuedCentral Mechanical System03/31/2023
DOB NOWMechanical SystemsPermit IssuedCentral Mechanical System03/30/2023
DOB NOWMechanical SystemsPermit IssuedCentral Mechanical System03/30/2023
DOB NOWSidewalk ShedPermit IssuedCentral Mechanical System03/30/2023
DOB NOWMechanical SystemsPermit IssuedCentral Mechanical System03/21/2023
DOB NOWBoiler EquipmentSigned-offChampion Combustion07/22/2022
DOB NOWMechanical SystemsPermit IssuedCentral Mechanical System07/22/2022
DOB NOWConstruction FencePermit IssuedCentral Mechanical System07/14/2022
DOB NOWSidewalk ShedPermit IssuedCentral Mechanical System07/11/2022
DOB NOWSidewalk ShedPermit IssuedCentral Mechanical System05/25/2022
DOB NOWConstruction FencePermit IssuedCentral Mechanical System05/10/2022
DOB NOWSidewalk ShedPermit IssuedCentral Mechanical System03/22/2022
DOB NOWMechanical SystemsPermit IssuedCentral Mechanical System03/21/2022
DOB NOWMechanical SystemsPermit IssuedCentral Mechanical System03/29/2021
DOB NOWSidewalk ShedPermit IssuedCentral Mechanical System03/29/2021
DOB NOWSidewalk ShedPermit IssuedCentral Mechanical System03/29/2021
DOB NOWBoiler EquipmentPermit IssuedChampion Combustion01/22/2021
DOB NOWMechanical SystemsPermit IssuedCentral Mechanical System10/07/2020
DOB NOWConstruction FencePermit IssuedCentral Mechanical System10/05/2020
DOB NOWConstruction FencePermit IssuedCentral Mechanical System10/05/2020
BISMHISSUEDCentral Mechanical Systems03/27/2026
BISOTISSUEDCentral Mechanical Systems03/27/2026
+ 48 more permits on file
1 project · most recent 02/12/2025
Storm
FiledStatusContractorScope
02/12/2025——Storm
15 projects · most recent 05/14/2026
General Wiring
FiledStatusContractorScope
05/14/2026Permit IssuedJK ElectricalGeneral Wiring
05/11/2026CompleteGemini Electric Co—
10/07/2025CompleteCharan Electrical Enterp's—
08/10/2023CompleteCharan Electrical Enterp's—
01/17/2023CompleteFalcon Electrical ContractingGeneral Wiring
08/25/2022Permit IssuedGemini Electric CoGeneral Wiring
08/08/2022CompleteFalcon Electrical Contracting—
07/14/2022CompleteFalcon Electrical Contracting—
05/10/2021Permit IssuedEcny Electrical Contractors—
03/03/2021CompleteAbm Electric—
10/01/2020Permit IssuedMilad Contracting—
06/01/2020CompleteCharan Electrical Enterp's—
06/19/2019CompleteDouglas Paskor—
10/04/2018CompleteCharan Electrical Enterp's—
02/26/2018CompleteLaser Electrical Constr'g—
1 project · most recent 02/12/2025
Steel Concrete
FiledStatusContractorScope
02/12/2025——Steel, Concrete
2 projects · most recent 07/14/2022
Fence Sidewalk Shed
FiledStatusContractorScope
07/14/2022Permit IssuedCentral Mechanical SystemFence, Sidewalk Shed
10/01/2020Permit IssuedCentral Mechanical SystemFence, Sidewalk Shed
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
09/23/2022Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 36
DateRequirementInspectorRole
03/28/2025Air barrier - visual inspection—energy_progress
03/28/2025Insulation placement and R values—energy_progress
03/28/2025Protection of exposed foundation insulation—energy_progress
03/12/2025Subsurface Conditions – Fill Placement & In-Place Density—special
03/12/2025Energy Code Compliance Inspections—progress
03/12/2025Final—progress
03/11/2025Final—progress
02/12/2025Structural Steel - Welding—special
02/12/2025Post-installed Anchors—special
02/12/2025Concrete - Cast-In-Place—special
02/11/2025Post-installed Anchors—special
02/11/2025Structural Steel - Details—special
02/11/2025Structural Stability – Alterations of existing buildings—special
02/11/2025Final—progress
02/11/2025Fire-Resistant Penetrations and Joints—special
02/11/2025Maintenance information—energy_progress
02/11/2025Exterior lighting power—energy_progress
02/11/2025Lighting controls—energy_progress
02/11/2025Energy Code Compliance Inspections—progress
02/11/2025Masonry—special
02/11/2025Fire-Resistant Penetrations and Joints—special
02/11/2025Concrete - Cast-In-Place—special
09/17/2024Structural Stability – Alterations of existing buildings—special
07/15/2022Post-installed AnchorsNELSON LOPEZspecial
07/15/2022HVAC-R and service water piping design and insulationNELSON LOPEZenergy_progress
Latest 25 of 36.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
P.S. 184 - QueensEducationCellar, Floors 1, 2, Roof
Project Q01112506 Alteration · Approved · 02/11/2025
P.S. 18 WinchesterEducationCellar, Floor 1
Project Q01088638 Alteration · Approved · 10/01/2024
Project Q00758703 Alteration · Permit Entire · 06/30/2022
Project Q00403339 Alteration · Permit Entire · 10/02/2020
Project Q00405713 Alteration · Permit Entire · 10/01/2020
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 110 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch10
08/26/2026Q00758703-P1Request digital key ↗
08/26/2026Q00758703-S2Request digital key ↗
08/26/2026Q00758703-P2Request digital key ↗
Showing 3 of 10 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed1
08/27/2026Q00405713-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
08/27/2026Q00405713-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
08/27/2026Q00403339-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Boiler Equipment1
08/27/2026Q00403339-S2Request digital key ↗
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
06/17/2019440551047Open ↗
▸BISWORK PERMIT APPLICATION1
06/17/2019440551047Open ↗
▸Seals & Professional Certifications31
▸DOB NOWDPL-1: Design Professional Seal & Signature13
08/27/2026Q00405713-I1Open ↗
08/27/2026Q00403339-S2Open ↗
08/27/2026Q00403339-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/23/2026Q00403339-S2Open ↗
09/23/2026Q00758703-S1Open ↗
09/07/2026Q00403339-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/07/2026Q00403339-I1Open ↗
09/07/2026Q00403339-I1Open ↗
08/24/2026Q00758703-S2Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
01/30/2020440551047Open ↗
01/30/2020440551047Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
06/17/2019440551047Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
06/17/2019440551047Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
06/17/2019440551047Open ↗
▸Safety & Tenant Protection3
▸DOB NOWNYCSCA - Approved Site Safety Plans3
08/13/2026Q00403339-S2Open ↗
08/13/2026Q00405713-I1Open ↗
08/13/2026Q00758703-I1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/27/2026Q00403339-I1Open ↗
08/27/2026Q00403339-S2Open ↗
08/13/2026Q00758703-S2Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
06/17/2019440551047Open ↗
▸Energy Compliance5
▸BISAS-BUILT ENERGY ANALYSIS1
01/30/2020440551047Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
06/17/2019440551047Open ↗
▸BISNYCECC ANALYSIS1
06/17/2019440551047Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
01/30/2020440551047Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
06/17/2019440551047Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
06/17/2019440551047Open ↗
06/17/2019440551047Open ↗
▸Approvals, Objections & Sign-offs31
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)13
08/13/2026Q00405713-I1Open ↗
08/13/2026Q01112506-S5Open ↗
08/13/2026Q00403339-S2Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter13
08/21/2026Q01088638-I1Open ↗
08/13/2026Q00403339-I1Open ↗
08/13/2026Q01112506-S5Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)2
08/13/2026Q00403339-I1Open ↗
08/13/2026Q01112506-S4Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
06/17/2019440551047Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
01/30/2020440551047Open ↗
▸BISDESIGN COMM. APPROVAL: CITY-OWNED PROPERTY (EXTERIOR WORK)1
06/17/2019440551047Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
01/30/2020440551047Open ↗
06/17/2019440551047Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
06/17/2019440551047Open ↗
▸Other Documents14
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal13
08/13/2026Q00758703-S2Open ↗
08/13/2026Q00758703-S1Open ↗
08/13/2026Q01088638-I1Open ↗
Showing 3 of 13 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
06/17/2019440551047Open ↗