← Back
Church, synagogue, chapel
86-45 87 DRIVE
QUEENS · BIN 4438696
💬 Discuss this project
1928Year Built
4Stories
M1Building Class
R1-2Zoning
216,543 sfGross Floor Area
0Units
LL97 CoveredRent Stabilized27 Open Violations ▸FDNY Report ↗
Church, synagogue, chapel · 301,660 sf lot · 0.72 FAR built · Flood zone X
Locations of Work
MechanicalPlumbing
Floor 18p · 1 filing · 20 docs
Cellar6p · 3 filings · 19 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
IMMACULATE CONCEPTION CHURCH703/21/2026
CHURCH OF THE IMMACULATE CONCEPT103/21/2026
PHOENIX 132 SUTTON STREET103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
COLLADO ENGINEERING304/16/2025
ZAMBRANO ARCHITECTURAL210/16/2024
KPFF CONSULTING ENGINEERS206/06/2022
NEW AGE ENGINEERING PLLC308/24/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ZAMBRANO ARCHITECTURAL DESIGN603/21/2026
BSD CONSULTING403/21/2026
EMPOWER CES403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUNPOWER CORPORATION, SYSGeneral Contractor603/21/2026
JOSEPH PITTELLIElectrical503/21/2026
FAZIO CONSTRUCTION GROUPGeneral Contractor407/08/2026
GUARANTEED HOME IMPROVEMEGeneral Contractor303/21/2026
CN PLUMBING INCPlumbing307/08/2026
ROBERTS, QUINSIEElectrical103/21/2026
KEAVENY, KEVINElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
C.M. TESTING LABORATORY,1352504/16/2025
PACIFICO ENGINEERING PC3157206/06/2022
SOIL MECHANICS DRILLING C2325206/06/2022
NEW AGE ENGINEERING PLLC7746108/24/2021
Building Lifecycle
All (127)Filed (10)Permit Issued (8)Signed Off (3)Violation (34)Inspection (10)Objection (32)Special Inspection (30)
02/05/2026
Violation issued (FDNY_NOV, closed)
12/04/2025
Violation issued (FDNY_ORDER, closed)
12/04/2025
Violation issued (FDNY_NOV, closed)
07/01/2025
Signed off — Alteration
Installation of new make up air for existing kitchen.
Q01031042-S2
04/29/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN SEMIOLI
04/16/2025
Filed — Alteration
Installation of new make up air for existing kitchen.
Q01031042-P2
04/11/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN SEMIOLI
02/11/2025
Signed off — Alteration
Installation of new make up air for existing kitchen.
Q01031042-I1
11/13/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN SEMIOLI
11/13/2024
Special inspection requirement — Fenestration air leakage
JOHN SEMIOLI
11/13/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
JOHN SEMIOLI
11/13/2024
Special inspection requirement — Final
JOHN SEMIOLI
11/13/2024
Special inspection requirement — Energy Code Compliance Inspections
JOHN SEMIOLI
11/13/2024
Special inspection requirement — Fire-Resistance Rated Construction
JOHN SEMIOLI
11/05/2024
Objection resolved — Addressed
10/31/2024
Objection raised — Scope
10/21/2024
Violation issued (FDNY_NOV, closed)
10/16/2024
Filed — Alteration
Installation of new make up air for existing kitchen.
Q01031042-P1
10/14/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
JOHN SEMIOLI
10/14/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN SEMIOLI
10/14/2024
Special inspection requirement — Energy Code Compliance Inspections
JOHN SEMIOLI
10/14/2024
Special inspection requirement — Final
JOHN SEMIOLI
10/14/2024
Special inspection requirement — Fire-Resistance Rated Construction
JOHN SEMIOLI
10/14/2024
Special inspection requirement — Fenestration air leakage
JOHN SEMIOLI
07/31/2024
Inspection — Certified Sprinkler - SP - Roughing
Certified
View inspection ↗
07/19/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/15/2024
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
06/20/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
06/20/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/13/2024
Permit issued — Plumbing
Q01031042-S1-PL
06/13/2024
Permit issued — Mechanical Systems
Q01031042-S2-MS
06/04/2024
Objection resolved — Addressed
06/04/2024
Objection resolved — Addressed
06/04/2024
Objection resolved — Addressed
06/04/2024
Objection resolved — Addressed
06/04/2024
Objection resolved — Addressed
06/04/2024
Objection resolved — Addressed
06/03/2024
Objection raised — Scope
06/03/2024
Objection raised — Scope
05/31/2024
Special inspection requirement — Energy Code Compliance Inspections
JOHN SEMIOLI
05/31/2024
Special inspection requirement — HVAC-R and service water heating system controls
JOHN SEMIOLI
05/31/2024
Special inspection requirement — Maintenance information
JOHN SEMIOLI
05/31/2024
Special inspection requirement — Electrical motors and elevators
JOHN SEMIOLI
05/31/2024
Special inspection requirement — Shutoff dampers
JOHN SEMIOLI
05/31/2024
Special inspection requirement — Duct leakage testing, insulation and design
JOHN SEMIOLI
05/31/2024
Special inspection requirement — HVAC-R and service water heating equipment
JOHN SEMIOLI
05/30/2024
Permit issued — General Construction
Q01031042-I1-GC
05/24/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
JOHN SEMIOLI
05/23/2024
Objection raised — Scope
05/23/2024
Objection resolved — Addressed
05/23/2024
Objection raised — Scope
05/23/2024
Objection resolved — Addressed
05/23/2024
Objection raised — Inspections
05/23/2024
Objection resolved — Addressed
05/23/2024
Objection raised — Scope
05/23/2024
Objection resolved — Addressed
05/23/2024
Objection resolved — Addressed
05/17/2024
Objection raised — Scope
05/17/2024
Objection raised — Inspections
05/17/2024
Objection raised — Scope
Latest 60 of 127 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedCN PLUMBING INC06/13/2024
DOB NOWMechanical SystemsSigned-offFAZIO CONSTRUCTION GROUP06/13/2024
DOB NOWGeneral ConstructionSigned-offFAZIO CONSTRUCTION GROUP05/30/2024
DOB NOWStructuralPermit IssuedSUNPOWER CORPORATION, SYS08/23/2022
DOB NOWStructuralSigned-offSUNPOWER CORPORATION, SYS12/13/2021
DOB NOWMechanical SystemsSigned-offGUARANTEED HOME IMPROVEME08/24/2021
DOB NOWBoiler EquipmentSigned-offCN PLUMBING INC08/18/2021
DOB NOWPlumbingPermit IssuedCN PLUMBING INC08/16/2021
BISOTISSUEDEMPOWER CES LLC09/02/2021
BISOTISSUEDPARISH PROPERTY MANAGEMENT02/18/2016
BISMHISSUEDTERRA NOVA RESTORATION CO05/06/2013
BISPLISSUEDBEST PBG HTG & COOL INC06/22/2009
BISBLISSUEDGEECEE MECHANICAL SVCS INC10/22/2007
BISFSISSUEDBAYSIDE FUEL06/24/2002
BISOTISSUEDYELLOWSTONE INDUSTRIES02/26/2002
BISFBISSUEDVITO VALENTINI04/30/2001
BISMHRE-ISSUEDG.P.J. O'DONOGHUE CONTRACTING12/09/1999
BISOTISSUEDG.P.J. O'DONOGHUE CONTRACTING08/13/1998
BISBLISSUEDCOMMERCIAL COMBUSTION SER03/21/1994
1 project · most recent 04/16/2025
Gas Water/Sanitary
FiledStatusContractorScope
04/16/2025Permit IssuedCN PLUMBING INCGas, Water/Sanitary
1 project · most recent 08/06/2021
FiledStatusContractorScope
08/06/2021CompleteISLAND ELECTRIC CORP1 meters, 1 new_meters
1 project · most recent 06/06/2022
Steel Concrete
FiledStatusContractorScope
06/06/2022Permit IssuedSUNPOWER CORPORATION, SYSSteel, Concrete
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
07/31/2024Certified Sprinkler - SP - RoughingCertifiedView ↗
07/19/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/15/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
06/20/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/20/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/20/2022Pass-Final CND-Occupancy InspectionPassView ↗
09/14/2022Fail-Final CND-Occupancy InspectionFailView ↗
01/10/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
12/14/2021Pass-Final Boiler Equipment InspectionPassView ↗
12/13/2021Certified Gas-Gas-Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 37
DateRequirementInspectorRole
04/29/2025Fire-Resistant Penetrations and JointsJOHN SEMIOLIspecial
04/11/2025Fire-Resistant Penetrations and JointsJOHN SEMIOLIspecial
11/13/2024Fire-Resistant Penetrations and JointsJOHN SEMIOLIspecial
11/13/2024Fenestration air leakageJOHN SEMIOLIenergy_progress
11/13/2024Fenestration and door U-factor and product ratingsJOHN SEMIOLIenergy_progress
11/13/2024FinalJOHN SEMIOLIprogress
11/13/2024Energy Code Compliance InspectionsJOHN SEMIOLIprogress
11/13/2024Fire-Resistance Rated ConstructionJOHN SEMIOLIprogress
10/14/2024Fenestration and door U-factor and product ratingsJOHN SEMIOLIenergy_progress
10/14/2024Fire-Resistant Penetrations and JointsJOHN SEMIOLIspecial
10/14/2024Energy Code Compliance InspectionsJOHN SEMIOLIprogress
10/14/2024FinalJOHN SEMIOLIprogress
10/14/2024Fire-Resistance Rated ConstructionJOHN SEMIOLIprogress
10/14/2024Fenestration air leakageJOHN SEMIOLIenergy_progress
05/31/2024Energy Code Compliance InspectionsJOHN SEMIOLIprogress
05/31/2024HVAC-R and service water heating system controlsJOHN SEMIOLIenergy_progress
05/31/2024Maintenance informationJOHN SEMIOLIenergy_progress
05/31/2024Electrical motors and elevatorsJOHN SEMIOLIenergy_progress
05/31/2024Shutoff dampersJOHN SEMIOLIenergy_progress
05/31/2024Duct leakage testing, insulation and designJOHN SEMIOLIenergy_progress
05/31/2024HVAC-R and service water heating equipmentJOHN SEMIOLIenergy_progress
05/24/2024HVAC-R and service water piping design and insulationJOHN SEMIOLIenergy_progress
05/03/2024Fire-Resistant Penetrations and JointsJOHN SEMIOLIspecial
05/02/2024Mechanical SystemsJOHN SEMIOLIspecial
05/02/2024FinalJOHN SEMIOLIprogress
Latest 25 of 37.
▾Documents — 184 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
08/27/2026Q00552294-I1Request digital key ↗
08/27/2026Q00552275-I1Request digital key ↗
08/27/2026Q00575999-I1Request digital key ↗
Showing 3 of 10 on file for this type
▸Applications & Permits23
▸BISPLAN / WORK APPROVAL APPLICATION16
11/30/2022440684895Open ↗
06/09/2022440684895Open ↗
02/17/2022440684895Open ↗
Showing 3 of 16 on file for this type
▸BISWORK PERMIT APPLICATION7
09/02/2021440684895Open ↗
02/24/2016421244095Open ↗
05/10/2013420834752Open ↗
Showing 3 of 7 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00546977-I1Open ↗
▸Seals & Professional Certifications56
▸DOB NOWProgress Inspector Seal & Signature17
09/23/2026Q00552275-I1Open ↗
09/23/2026Q00552275-I1Open ↗
09/23/2026Q00552275-I1Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
09/01/2026Q01031042-I1Open ↗
08/29/2026Q00575999-I1Open ↗
08/29/2026Q00575999-I1Open ↗
Showing 3 of 12 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION10
01/24/2018421595474Open ↗
02/24/2016421244095Open ↗
02/24/2016421244095Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/27/2026Q00552294-I1Open ↗
08/26/2026Q00546977-P1Open ↗
08/26/2026Q00546977-I1Open ↗
Showing 3 of 10 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
10/08/2010420273590Open ↗
10/22/2007410017119Open ↗
▸BISAPPLICANT OWNER SIGNATURE2
08/31/2021440684895Open ↗
06/10/2021440672372Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
10/08/2010420273590Open ↗
10/19/2007410017119Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
06/10/2021440672372Open ↗
▸Trade Schedules & Equipment9
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT3
06/17/2009420026055Open ↗
06/17/2009420026055Open ↗
10/19/2007410017119Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
07/20/2019421896648Open ↗
12/07/2015421244095Open ↗
▸BISSELF-CERT PLUMBING NOTICE1
07/16/2009420026055Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
10/08/2013420834752Open ↗
▸BISEQUIPMENT USE PERMITS1
02/06/2014420834752Open ↗
▸BISSCHEDULE B - PLUMBING1
06/17/2009420026055Open ↗
▸Safety & Tenant Protection7
▸DOB NOWStreet Tree Checklist2
08/26/2026Q00546977-I1Open ↗
08/26/2026Q00546977-P1Open ↗
▸BISTPP1: TENANT PROTECTION PLAN1
08/31/2021440684895Open ↗
▸BISSTREET TREE CHECKLIST1
01/24/2018421595474Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q00546977-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026Q00546977-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026Q00546977-I1Open ↗
▸Environmental & Asbestos13
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/27/2026Q00552294-I1Open ↗
08/13/2026Q01031042-P1Open ↗
08/13/2026Q01031042-I1Open ↗
Showing 3 of 8 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
10/08/2010420273590Open ↗
06/17/2009420026055Open ↗
10/19/2007410017119Open ↗
▸BISASBESTOS-EXEMPTION (ASB4)1
04/18/2013420834752Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
12/07/2015421244095Open ↗
▸Energy Compliance17
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY5
10/18/2022440684895Open ↗
09/02/2021440684895Open ↗
09/02/2021440684895Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
03/06/2018421595474Open ↗
12/07/2015421244095Open ↗
07/15/2013420834752Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS2
07/15/2013420834752Open ↗
04/18/2013420834752Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
10/18/2022440684895Open ↗
▸BISTR8: Energy Code Progress Inspections1
05/10/2013420834752Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
06/10/2021440672372Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
08/31/2021440684895Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (FINAL)1
10/18/2022440684895Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026Q00552275-I1Open ↗
▸Inspections & Test Reports8
▸BISTECHNICAL REPORT: RESPONSIBILITY5
10/18/2022440684895Open ↗
09/02/2021440684895Open ↗
09/02/2021440684895Open ↗
Showing 3 of 5 on file for this type
▸BISNOTIF.-PROPOSED STEAM/HOT WATER INSPECTION1
10/19/2007410017119Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
06/10/2021440672372Open ↗
▸DOB NOWConcrete Testing Exception Report1
08/13/2026Q00546977-I1Open ↗
▸Approvals, Objections & Sign-offs19
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter8
08/27/2026Q00552294-I1Open ↗
08/13/2026Q01031042-P1Open ↗
08/13/2026Q01031042-P2Open ↗
Showing 3 of 8 on file for this type
▸BISADMINISTRATIVE OBJECTIONS4
10/08/2010420273590Open ↗
06/09/2009420026055Open ↗
11/14/2007410017119Open ↗
Showing 3 of 4 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
01/24/2018421595474Open ↗
01/24/2018421595474Open ↗
09/02/2010410017119Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
01/30/2023440684895Open ↗
10/08/2013420834752Open ↗
09/02/2010410017119Open ↗
▸BISFINAL ELECTRICAL SIGNOFF1
01/30/2023440684895Open ↗
▸Cost, Insurance & Ownership8
▸BISCOST AFFIDAVIT7
08/31/2021440684895Open ↗
06/10/2021440672372Open ↗
01/24/2018421595474Open ↗
Showing 3 of 7 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
10/18/2022440684895Open ↗
▸Filing & Intake Forms11
▸BISEFILING COVER SHEET6
07/20/2019421896648Open ↗
07/20/2019421896648Open ↗
01/24/2018421595474Open ↗
Showing 3 of 6 on file for this type
▸BISADDITIONAL INFORMATION3
06/14/2022440684895Open ↗
02/18/2022440684895Open ↗
02/19/2016421244095Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET2
08/31/2021440684895Open ↗
06/10/2021440672372Open ↗
▸Other Documents2
▸BISTax Abatement Miscellaneous1
10/19/2022440684895Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00546977-I1Open ↗