LL97 Covered6 Open Violations 5 unresolved · 1 paperwork only▸
DOB05/03/2012FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
DOB03/26/2002V-DOB VIOLATION - ACTIVE
DOB08/29/1995V-DOB VIOLATION - ACTIVE
DOB06/07/1994V-DOB VIOLATION - ACTIVE
DOB06/28/1993V-DOB VIOLATION - ACTIVE
ECB02/25/20251RCNY 103-09(E). FAILURE TO FILE A RETAINING WALL CONDITION ASSESSMENTREPORT BY THE DEADLINE AS REQUIRED BY 1RCNY 103-09(E)(2) AND (5). TO DATE, THE DEPARTMENT HAS NOT RECEIVED A RETAINING WALL CONDITION ASSESSHearing held — result not yet published$1K proposed
School or academy · 151,600 sf lot · 0.41 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.