← Back
Two family converted from one family
86-52 106 STREET
QUEENS · Richmond Hill · BIN 4192033
💬 Discuss this project
1915Year Built
2.75Stories
B3Building Class
R3XZoning
2,236 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Two family converted from one family · 3,975 sf lot · 0.56 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Cellar2p · 2 filings · 18 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AGE ENGINEERING, LLC302/20/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ARCOMETRIC DESIGN603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JUAHOL CONSTRUCTION INCGeneral Contractor107/08/2026
ARANDA PLBG & HTG CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AGE ENGINEERING, LLC6695104/01/2021
Building Lifecycle
All (23)Filed (3)Permit Issued (2)Signed Off (2)Violation (1)Inspection (4)Objection (4)Special Inspection (7)
06/08/2022
Signed off — Alteration
Q00485814-I1
03/28/2022
Signed off — Alteration
INTERIOR RENOVATION INCLUDING MAINTAIN AND LEGALIZE EXIST. (2) PIECES BATHROOM & WASHING MACHINE; REMOVAL OF FULL HEIGHT PARTITIONS & DOOR, AND ILLEGAL STALL SHOWER IN ORDER TO CORRECT VIOLATIONS 039036498Y. NO CHANGE OF USE, EGRESS, OR OCCUPANCY
Q00485706-I1
03/09/2022
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
03/01/2022
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
02/25/2022
Special inspection requirement — Energy Code Compliance Inspections
ROBESPIERRE ARISTILDE
02/25/2022
Special inspection requirement — Lighting in dwelling units
ROBESPIERRE ARISTILDE
02/20/2022
Filed — Alteration
INTERIOR RENOVATION INCLUDING MAINTAIN AND LEGALIZE EXIST. (2) PIECES BATHROOM & WASHING MACHINE; REMOVAL OF FULL HEIGHT PARTITIONS & DOOR, AND ILLEGAL STALL SHOWER IN ORDER TO CORRECT VIOLATIONS 039036498Y. NO CHANGE OF USE, EGRESS, OR OCCUPANCY
Q00485706-P1
02/18/2022
Special inspection requirement — Energy Code Compliance Inspections
ROBESPIERRE ARISTILDE
02/18/2022
Special inspection requirement — Lighting in dwelling units
ROBESPIERRE ARISTILDE
01/05/2022
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
01/05/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/18/2021
Permit issued — Plumbing
Q00485814-I1-PL
09/24/2021
Permit issued — General Construction
Q00485706-I1-GC
06/04/2021
Objection raised — Other
06/04/2021
Objection resolved — Addressed
04/28/2021
Objection raised — Other
04/28/2021
Objection resolved — Addressed
04/01/2021
Filed — Alteration
Q00485814-I1
04/01/2021
Filed — Alteration
INTERIOR RENOVATION INCLUDING MAINTAIN AND LEGALIZE EXIST. (2) PIECES BATHROOM & WASHING MACHINE; REMOVAL OF FULL HEIGHT PARTITIONS & DOOR, AND ILLEGAL STALL SHOWER IN ORDER TO CORRECT VIOLATIONS 039036498Y. NO CHANGE OF USE, EGRESS, OR OCCUPANCY
Q00485706-I1
03/19/2021
Special inspection requirement — Energy Code Compliance Inspections
ROBESPIERRE ARISTILDE
03/19/2021
Special inspection requirement — Metering
ROBESPIERRE ARISTILDE
03/19/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
ROBESPIERRE ARISTILDE
02/22/2021
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offARANDA PLBG & HTG CORP11/18/2021
DOB NOWGeneral ConstructionSigned-offJUAHOL CONSTRUCTION INC09/24/2021
BIS—ISSUEDN/A10/19/1990
BIS—ISSUEDN/A09/27/1990
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
03/09/2022Pass-Final General Construction Non-Directive 14PassView ↗
03/01/2022Fail-Final General Construction Non-Directive 14FailView ↗
01/05/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/05/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
02/25/2022Energy Code Compliance InspectionsROBESPIERRE ARISTILDEprogress
02/25/2022Lighting in dwelling unitsROBESPIERRE ARISTILDEenergy_progress
02/18/2022Energy Code Compliance InspectionsROBESPIERRE ARISTILDEprogress
02/18/2022Lighting in dwelling unitsROBESPIERRE ARISTILDEenergy_progress
03/19/2021Energy Code Compliance InspectionsROBESPIERRE ARISTILDEprogress
03/19/2021MeteringROBESPIERRE ARISTILDEenergy_progress
03/19/2021Fire-Resistant Penetrations and JointsROBESPIERRE ARISTILDEspecial
▾Documents — 18 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/27/2026Q00485814-I1Request digital key ↗
08/26/2026Q00485706-P1Request digital key ↗
08/14/2026Q00485706-I1Request digital key ↗
▸Seals & Professional Certifications10
▸DOB NOWProgress Inspector Seal & Signature6
09/29/2026Q00485814-I1Open ↗
09/29/2026Q00485814-I1Open ↗
08/25/2026Q00485706-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/27/2026Q00485814-I1Open ↗
08/26/2026Q00485706-P1Open ↗
08/26/2026Q00485706-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/29/2026Q00485814-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/27/2026Q00485814-I1Open ↗
08/26/2026Q00485706-P1Open ↗
08/14/2026Q00485706-I1Open ↗
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026Q00485814-I1Open ↗
08/13/2026Q00485706-I1Open ↗