← Back
Two stories - detached, small or mid-size
86-55 MARENGO STREET
QUEENS · BIN 4224295
💬 Discuss this project
1950Year Built
2Stories
A1Building Class
R1-2Zoning
1,998 sfGross Floor Area
1Units
2 Open Violations ▸FDNY Report ↗
Two stories - detached, small or mid-size · Owner of record: 8655 MARENGO HOLDINGS LLC · 19,968 sf lot · 0.1 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Permit Issued — active, not yet Signed-off
Floor 2Under Construction9p · 1 filing · 20 docs
Floor 1Under Construction9p · 1 filing · 20 docs
CellarUnder Construction9p · 1 filing · 20 docs
1 job · most recent 08/05/2026
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
08/05/2026Permit IssuedEMPIRE HOME SERVICES CORPAir Conditioning Systems
Cooling
Mitsubishi Electric M4H36W06060615-B 40,000 BTU ×9
Heating
Mitsubishi Electric M4H36W06060615-B 40,000 BTU ×9
Ventilation
Mitsubishi Electric M4H36W06060615-B 40,000 BTU ×9
1 job · most recent 08/05/2026
Gas Water/Sanitary
FiledStatusContractorScope
08/05/2026Permit IssuedFOUR POINTS P & H CORPGas, Water/Sanitary
2 jobs · most recent 04/11/2025
FiledStatusContractorScope
04/11/2025Permit IssuedMDC SECURITY AND ELEC'L—
10/22/2024Permit IssuedKINGS ELECTRIC CO., INC.1 meters, 1 new_meters
1 job · most recent 08/05/2026
Wood
FiledStatusContractorScope
08/05/2026Permit IssuedEMPIRE HOME SERVICES CORPWood
1 job · most recent 08/05/2026
Fence
FiledStatusContractorScope
08/05/2026Permit IssuedEMPIRE HOME SERVICES CORPFence
Building Lifecycle
All (61)Filed (5)Permit Issued (5)Violation (4)Inspection (3)Objection (20)Special Inspection (24)
09/10/2026
Permit issued — Structural
Q01129234-I1-GC-CX
08/06/2026
Special inspection requirement — Mechanical Systems
Younes Abouyaala
08/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
08/06/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Younes Abouyaala
08/06/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
Younes Abouyaala
08/06/2026
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
08/06/2026
Special inspection requirement — Final
NAVEEN KUMAR
08/05/2026
Filed — Alteration
HEREWITH FILE ALTERATION IN ORDER TO DO AN INTERIOIR RENOVATION TO AN EXISTING TWO STORY ONE FAMILY DWELLING WITH GARAGE, TO ERECT POOL IN REAR AND TO DO PLUMBING WORK AND TO OBTAIN A LETTER OF COMPLETEION, NO CHANGE TO USE OCCUPANCY OR EGRESS.
Q01129234-P3
08/05/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
Younes Abouyaala
08/05/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
08/05/2026
Special inspection requirement — Mechanical Systems
Younes Abouyaala
08/05/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Younes Abouyaala
08/05/2026
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
08/05/2026
Special inspection requirement — Final
NAVEEN KUMAR
07/21/2026
Violation issued (ECB, closed)
Construction
07/21/2026
Violation issued (ECB, open)
Construction
07/21/2026
Violation issued (ECB, open)
Construction
06/04/2026
Permit issued — Construction Fence
Q01129234-S2-FN
06/03/2026
Objection resolved — Addressed
06/02/2026
Objection raised — Other
05/30/2026
Filed — Alteration
HEREWITH FILE ALTERATION IN ORDER TO DO AN INTERIOIR RENOVATION TO AN EXISTING TWO STORY ONE FAMILY DWELLING WITH GARAGE, TO ERECT POOL IN REAR AND TO DO PLUMBING WORK AND TO OBTAIN A LETTER OF COMPLETEION, NO CHANGE TO USE OCCUPANCY OR EGRESS.
Q01129234-S2
02/19/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
02/19/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/19/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
01/12/2026
Permit issued — Structural
Q01129234-I1-GC-CX
01/12/2026
Permit issued — Plumbing
Q01129234-S1-PL
12/22/2025
Filed — Alteration
HEREWITH FILE ALTERATION IN ORDER TO DO AN INTERIOIR RENOVATION TO AN EXISTING TWO STORY ONE FAMILY DWELLING WITH GARAGE, TO ERECT POOL IN REAR AND TO DO PLUMBING WORK AND TO OBTAIN A LETTER OF COMPLETEION, NO CHANGE TO USE OCCUPANCY OR EGRESS.
Q01129234-P1
12/20/2025
Objection resolved — Addressed
12/20/2025
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
Younes Abouyaala
12/20/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
12/20/2025
Special inspection requirement — Mechanical Systems
Younes Abouyaala
12/20/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Younes Abouyaala
12/20/2025
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
12/20/2025
Special inspection requirement — Final
NAVEEN KUMAR
12/12/2025
Objection raised — Cost
12/12/2025
Objection resolved — Addressed
12/12/2025
Objection raised — Plumbing
12/12/2025
Objection raised — Plumbing
12/12/2025
Objection resolved — Addressed
12/12/2025
Objection raised — Plumbing
12/12/2025
Objection resolved — Addressed
12/12/2025
Objection raised — Plumbing
12/12/2025
Objection resolved — Addressed
11/21/2025
Objection resolved — Addressed
11/21/2025
Objection resolved — Addressed
11/21/2025
Objection resolved — Addressed
11/20/2025
Objection raised — Fire_Protection
11/20/2025
Objection raised — Plumbing
11/20/2025
Objection raised — Scope
10/31/2025
Objection resolved — Addressed
10/21/2025
Objection raised — Plumbing
09/28/2025
Filed — Alteration
HEREWITH FILE ALTERATION IN ORDER TO DO AN INTERIOIR RENOVATION TO AN EXISTING TWO STORY ONE FAMILY DWELLING WITH GARAGE, TO ERECT POOL IN REAR AND TO DO PLUMBING WORK AND TO OBTAIN A LETTER OF COMPLETEION, NO CHANGE TO USE OCCUPANCY OR EGRESS.
Q01129234-S1
09/24/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
09/24/2025
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
09/24/2025
Special inspection requirement — HVAC-R and service water heating equipment
Younes Abouyaala
09/24/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Younes Abouyaala
09/24/2025
Special inspection requirement — Maintenance information
Younes Abouyaala
09/24/2025
Special inspection requirement — Permanent certificate
Younes Abouyaala
12/06/2024
Violation issued (ECB, closed)
Construction
10/22/2024
Permit issued — Mechanical Systems
Q01129234-I1-GC-CX
Latest 60 of 61 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
8655 MARENGO HOLDINGS LLC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/17/2024$2.8M—Private party → 8655 MARENGO HOLDINGS LLC$1,376/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SELF EMPLOYED308/05/2026
AA BLDG & INSP SVC LLC205/30/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
DMCONSULTING6860603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JH CREW INCGeneral Contractor507/08/2026
EMPIRE HOME SERVICES CORPGeneral Contractor109/12/2026
FOUR POINTS P & H CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AA BUILDING & INSPECTION1519408/05/2026
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralPermit IssuedEMPIRE HOME SERVICES CORP09/10/2026
DOB NOWConstruction FencePermit IssuedJH CREW INC06/04/2026
DOB NOWStructuralPermit IssuedJH CREW INC01/12/2026
DOB NOWPlumbingPermit IssuedFOUR POINTS P & H CORP01/12/2026
DOB NOWMechanical SystemsPermit IssuedJH CREW INC10/22/2024
BISPLISSUEDALL-BORO REHAB CONST CORP09/26/2022
BISPLISSUEDALL-BORO REHAB CONST CORP12/12/2018
BISOTISSUEDALL-BORO REHAB CONSTRCT C05/08/2003
BISPLISSUEDALL-BORO REHAB CONST CORP05/08/2003
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
02/19/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
02/19/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/19/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 24
DateRequirementInspectorRole
08/06/2026Mechanical SystemsYounes Abouyaalaspecial
08/06/2026Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
08/06/2026Structural Stability – Alterations of existing buildingsYounes Abouyaalaspecial
08/06/2026Exterior Insulation and Finish Systems (EIFS)Younes Abouyaalaspecial
08/06/2026Energy Code Compliance InspectionsYounes Abouyaalaprogress
08/06/2026FinalNAVEEN KUMARprogress
08/05/2026Exterior Insulation and Finish Systems (EIFS)Younes Abouyaalaspecial
08/05/2026Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
08/05/2026Mechanical SystemsYounes Abouyaalaspecial
08/05/2026Structural Stability – Alterations of existing buildingsYounes Abouyaalaspecial
08/05/2026Energy Code Compliance InspectionsYounes Abouyaalaprogress
08/05/2026FinalNAVEEN KUMARprogress
12/20/2025Exterior Insulation and Finish Systems (EIFS)Younes Abouyaalaspecial
12/20/2025Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
12/20/2025Mechanical SystemsYounes Abouyaalaspecial
12/20/2025Structural Stability – Alterations of existing buildingsYounes Abouyaalaspecial
12/20/2025Energy Code Compliance InspectionsYounes Abouyaalaprogress
12/20/2025FinalNAVEEN KUMARprogress
09/24/2025Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
09/24/2025Energy Code Compliance InspectionsYounes Abouyaalaprogress
09/24/2025HVAC-R and service water heating equipmentYounes Abouyaalaenergy_progress
09/24/2025HVAC-R and service water piping design and insulationYounes Abouyaalaenergy_progress
09/24/2025Maintenance informationYounes Abouyaalaenergy_progress
09/24/2025Permanent certificateYounes Abouyaalaenergy_progress
▾Documents — 47 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/16/2026Q01129234-P3Request digital key ↗
08/16/2026Q01129234-S1Request digital key ↗
08/16/2026Q01129234-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits6
▸BISPLAN / WORK APPROVAL APPLICATION5
08/14/2023401622213Open ↗
05/22/2023401622213Open ↗
05/20/2023401622213Open ↗
Showing 3 of 5 on file for this type
▸BISWORK PERMIT APPLICATION1
12/22/2018401622213Open ↗
▸Seals & Professional Certifications20
▸DOB NOWProgress Inspector Seal & Signature8
09/23/2026Q01129234-P3Open ↗
09/23/2026Q01129234-P3Open ↗
09/16/2026Q01129234-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/23/2026Q01129234-P3Open ↗
09/23/2026Q01129234-P3Open ↗
09/16/2026Q01129234-P1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/16/2026Q01129234-S2Open ↗
08/16/2026Q01129234-P3Open ↗
08/16/2026Q01129234-I1Open ↗
Showing 3 of 5 on file for this type
▸Trade Schedules & Equipment4
▸BISSCHEDULE B - PLUMBING3
08/14/2023401622213Open ↗
05/22/2023401622213Open ↗
05/20/2023401622213Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
05/20/2019401622213Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/16/2026Q01129234-P3Open ↗
08/16/2026Q01129234-I1Open ↗
08/13/2026Q01129234-P1Open ↗
Showing 3 of 4 on file for this type
▸Inspections & Test Reports5
▸BIS* STRUCTURAL STABILITY 1 RCNY:16-011
05/25/2023401622213Open ↗
▸BIS* TR2: CONCRETE TEST CYLINDERS TECHNICAL REPORT1
05/25/2023401622213Open ↗
▸BIS* DRYWELL INST RET/DET : TR1-DRYWELL RS16-P110.131
05/25/2023401622213Open ↗
▸BIS* SOIL PERCOLATE TEST-DRY WELL RS16-P1131
05/25/2023401622213Open ↗
▸BIS* FINAL INSPECTION DIRECTIVE 14 OF 19751
05/25/2023401622213Open ↗
▸Approvals, Objections & Sign-offs1
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
11/09/2023401622213Open ↗
▸Other Documents2
▸BIS* FIRE STOPS 27-3451
05/25/2023401622213Open ↗
▸BIS* * SUBGRADE 27-723,DIRC 15/711
05/25/2023401622213Open ↗