← Back
BuildNYC
Two stories - detached, small or mid-size
86-78 CHEVY CHASE STREET
QUEENS · BIN 4213552
💬 Discuss this project
1935Year Built
2Stories
A1Building Class
R1-2Zoning
1,800 sfGross Floor Area
1Units
0 Active ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · Owner of record: Rahaman Trust Dated July 23 · 10,235 sf lot · 0.18 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingCivil
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 21p · 1 filing · 20 docs
Floor 1Curb cut along street6p · 2 filings · 20 docs
Cellar5p · 1 filing · 20 docs
Site & exteriorAlteration of existing 2 story building1p · 1 filing · 2 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
M.S. Savani Architect401/21/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Safe Assure ConstructionScaffold304/09/2026
Safe Assure ConstructionGeneral Contractor203/21/2026
Johnnys Plumbing & HeatingPlumbing203/21/2026
Safe Assure Constructionspecialty_contractor204/09/2026
BT's Plumbing and HeatingPlumbing107/08/2026
Johnny's Plumbing & HeatingPlumbing202/17/1999
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AA Building & Inspection1519212/19/2024
Building Lifecycle
11/03/2026
Permit expired, never signed off — Mechanical Systems
The city's record still shows this permit as issued, with no sign-off on its filing
Q01146669-I1-GC-CX
04/16/2026
Signed off — Alteration
Q01145487-I1
11/03/2025
Permit renewed — Mechanical Systems
Renewed without changes
Q01146669-I1-GC-CX
11/03/2025
Permit renewed — Construction Fence
Renewed without changes
Q01145487-I1-FN
09/09/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
62 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedSafe Assure Construction11/03/2025
DOB NOWConstruction FenceSigned-offSafe Assure Construction11/03/2025
DOB NOWMechanical SystemsPermit IssuedSafe Assure Construction05/12/2025
DOB NOWPlumbingSigned-offBT's Plumbing and Heating04/29/2025
DOB NOWCurb CutSigned-offSafe Assure Construction04/29/2025
DOB NOWConstruction FenceSigned-offSafe Assure Construction04/28/2025
BISOTISSUEDJohnny's P&H02/17/1999
BISPLISSUEDJohnny's P&H02/09/1999
BISOTISSUEDNA02/08/1999
BISOTISSUEDN/A10/19/1998
1 project · most recent 12/19/2024
Ventilation Systems
FiledStatusContractorScope
12/19/2024Permit IssuedSafe Assure ConstructionVentilation Systems
1 project · most recent 10/16/2026
General Wiring
FiledStatusContractorScope
10/16/2026CompleteThree Son's ElectricalGeneral Wiring
1 project · most recent 12/19/2024
Steel Wood
FiledStatusContractorScope
12/19/2024Permit IssuedSafe Assure ConstructionSteel, Wood
1 project · most recent 12/19/2024
Earthwork
FiledStatusContractorScope
12/19/2024Permit IssuedSafe Assure ConstructionEarthwork
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
09/09/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/03/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
07/03/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
07/03/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/03/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 26
DateRequirementInspectorRole
01/15/2025Electric vehicle service equipment requirementsYounes Abouyaalaenergy_progress
12/10/2024Concrete - Cast-In-PlaceYounes Abouyaalaspecial
12/10/2024Excavations - Sheeting, Shoring, and BracingYounes Abouyaalaspecial
12/10/2024Exterior Insulation and Finish Systems (EIFS)Younes Abouyaalaspecial
12/10/2024Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
12/10/2024MasonryYounes Abouyaalaspecial
12/10/2024Structural Stability – Alterations of existing buildingsYounes Abouyaalaspecial
12/10/2024Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
12/10/2024Interior lighting powerYounes Abouyaalaenergy_progress
12/10/2024Fenestration air leakageYounes Abouyaalaenergy_progress
12/10/2024Insulation placement and R valuesYounes Abouyaalaenergy_progress
12/10/2024HVAC-R and service water piping design and insulationYounes Abouyaalaenergy_progress
12/10/2024Fenestration and door U-factor and product ratingsYounes Abouyaalaenergy_progress
12/10/2024Energy Code Compliance InspectionsYounes Abouyaalaprogress
12/10/2024Fire-Resistance Rated ConstructionYounes Abouyaalaprogress
12/10/2024Structural Wood FrameYounes Abouyaalaprogress
12/10/2024Permanent certificateYounes Abouyaalaenergy_progress
12/10/2024HVAC-R and service water heating equipmentYounes Abouyaalaenergy_progress
12/10/2024Air barrier - visual inspectionYounes Abouyaalaenergy_progress
12/10/2024Protection of exposed foundation insulationYounes Abouyaalaenergy_progress
12/10/2024Fenestration areasYounes Abouyaalaenergy_progress
12/10/2024HVAC-R and service water heating system controlsYounes Abouyaalaenergy_progress
11/22/2024FinalNAVEEN KUMARprogress
11/22/2024Footing and FoundationYounes Abouyaalaprogress
11/22/2024Mechanical SystemsYounes Abouyaalaspecial
Latest 25 of 26.
36 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account