← Back
Miscellaneous religious facility
86-81 102 STREET
QUEENS · Richmond Hill · BIN 4194273
💬 Discuss this project
1930Year Built
2Stories
M9Building Class
R3-1Zoning
2,160 sfGross Floor Area
1Units
52 Open Violations ▸FDNY Report ↗
Miscellaneous religious facility · Owner of record: MUSLIM COMMUNITY CENTER OF RICHMOND HILL INC. · 2,400 sf lot · 0.9 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
RONALD SAINTIL 1103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ARCALHEK405/25/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
A&A BUILDING CONSULTANTS INC.803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TRI STATE PLBG & HTG INCPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ARCHITECTURAL CONCEPT3642201/15/2021
Building Lifecycle
All (71)Filed (4)Permit Issued (2)Signed Off (2)Violation (60)Inspection (1)Special Inspection (2)
09/21/2022
Signed off — Alteration
Propose new plumbing fixtures and Hot and cold water lines in cellar (3 toilets , 1 Lavatory, 1 Non-residential sink, 10 floor drains , 1 new boiler, 1 new hot water heater. In first floor propose 1 toilet, 1 lavatory and 1 floor drain.
Q00390676-I1
08/01/2022
Signed off — Alteration
Propose Boiler for worship establishment
Q00644139-I1
06/08/2022
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
05/25/2022
Filed — Alteration
Propose Boiler for worship establishment
Q00644139-P1
04/19/2022
Violation issued (ECB, closed)
Construction
04/19/2022
Violation issued (ECB, closed)
Construction
03/03/2022
Permit issued — Boiler Equipment
Q00644139-I1-BE
02/23/2022
Filed — Alteration
Propose Boiler for worship establishment
Q00644139-I1
01/15/2021
Filed — Alteration
Propose new plumbing fixtures and Hot and cold water lines in cellar (3 toilets , 1 Lavatory, 1 Non-residential sink, 10 floor drains , 1 new boiler, 1 new hot water heater. In first floor propose 1 toilet, 1 lavatory and 1 floor drain.
Q00390676-P1
01/07/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
MUZAFFAR JAMAL
01/07/2021
Special inspection requirement — Fire-Resistance Rated Construction
MUZAFFAR JAMAL
11/12/2020
Permit issued — Plumbing
Q00390676-I1-PL
08/26/2020
Filed — Alteration
Propose new plumbing fixtures and Hot and cold water lines in cellar (3 toilets , 1 Lavatory, 1 Non-residential sink, 10 floor drains , 1 new boiler, 1 new hot water heater. In first floor propose 1 toilet, 1 lavatory and 1 floor drain.
Q00390676-I1
09/28/2019
Violation issued (ECB, closed)
Construction
08/02/2019
Violation issued (ECB, closed)
Construction
03/30/2019
Violation issued (ECB, closed)
Construction
10/11/2018
Violation issued (ECB, closed)
Construction
05/12/2018
Violation issued (ECB, closed)
Construction
03/22/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/22/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/15/2018
Violation issued (ECB, closed)
Construction
02/09/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/31/2018
Violation issued (ECB, closed)
Construction
01/02/2018
Violation issued (ECB, closed)
Construction
12/05/2017
Violation issued (ECB, closed)
Construction
11/09/2017
Violation issued (ECB, closed)
Construction
10/20/2017
Violation issued (ECB, closed)
Construction
09/13/2017
Violation issued (HPD, open)
B
09/13/2017
Violation issued (HPD, open)
B
09/13/2017
Violation issued (ECB, closed)
Construction
09/13/2017
Violation issued (HPD, open)
A
09/13/2017
Violation issued (HPD, open)
B
09/06/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/05/2017
Violation issued (ECB, closed)
Construction
08/08/2017
Violation issued (ECB, closed)
Construction
07/27/2017
Violation issued (ECB, closed)
Construction
07/12/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/16/2017
Violation issued (ECB, closed)
Construction
06/16/2017
Violation issued (ECB, closed)
Construction
05/04/2017
Violation issued (HPD, open)
B
05/04/2017
Violation issued (HPD, open)
A
05/04/2017
Violation issued (HPD, closed)
C
04/21/2017
Violation issued (HPD, closed)
C
04/21/2017
Violation issued (HPD, open)
B
04/21/2017
Violation issued (HPD, open)
B
04/18/2017
Violation issued (ECB, closed)
Construction
02/10/2017
Violation issued (HPD, closed)
C
02/10/2017
Violation issued (HPD, closed)
C
02/01/2017
Violation issued (HPD, open)
B
02/01/2017
Violation issued (HPD, closed)
C
02/01/2017
Violation issued (HPD, open)
B
02/01/2017
Violation issued (HPD, open)
B
02/01/2017
Violation issued (HPD, open)
B
02/01/2017
Violation issued (HPD, open)
A
02/01/2017
Violation issued (HPD, open)
C
02/01/2017
Violation issued (HPD, open)
C
02/01/2017
Violation issued (HPD, open)
B
02/01/2017
Violation issued (HPD, open)
B
02/01/2017
Violation issued (HPD, open)
B
02/01/2017
Violation issued (HPD, open)
B
Latest 60 of 71 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offDW PLUMBING INC03/03/2022
DOB NOWPlumbingSigned-offDW PLUMBING INC11/12/2020
BIS—ISSUEDCITY BUILDING CONSULTANTS08/17/2020
BIS—ISSUEDLEVEL UP RESTORATION CORP01/03/2020
BISPLISSUEDCITY TESTING & PLUMBING I03/07/2019
BISOTISSUEDCONSTRUCTION HEADS INC03/06/2019
1 project · most recent 07/26/2021
General Wiring
FiledStatusContractorScope
07/26/2021CompleteFIBERTEK DATA & ELEC CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
06/08/2022Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
01/07/2021Fire-Resistant Penetrations and JointsMUZAFFAR JAMALspecial
01/07/2021Fire-Resistance Rated ConstructionMUZAFFAR JAMALprogress
▾Documents — 76 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch2
08/26/2026Q00644139-I1Request digital key ↗
08/26/2026Q00644139-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing2
08/28/2026Q00390676-I1Request digital key ↗
08/15/2026Q00390676-P1Request digital key ↗
▸Applications & Permits15
▸BISPLAN / WORK APPROVAL APPLICATION10
11/29/2022421797746Open ↗
11/03/2022421925929Open ↗
10/11/2022421797746Open ↗
Showing 3 of 10 on file for this type
▸BISWORK PERMIT APPLICATION4
09/10/2020421797746Open ↗
01/06/2020421797746Open ↗
03/12/2019421925929Open ↗
Showing 3 of 4 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
07/01/2021421797746Open ↗
▸Zoning, Tax Lot & Property Records2
▸BISVERIFY TAX LOT1
08/02/2022421797746Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
09/06/2022421797746Open ↗
▸Seals & Professional Certifications11
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/28/2026Q00390676-I1Open ↗
08/26/2026Q00644139-I1Open ↗
08/13/2026Q00644139-P1Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
01/02/2020421797746Open ↗
11/04/2019421797746Open ↗
12/15/2018421925929Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
12/15/2018421925929Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
12/15/2018421925929Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/22/2026Q00390676-P1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/22/2026Q00390676-P1Open ↗
▸Trade Schedules & Equipment4
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
10/24/2019421925929Open ↗
08/19/2019421925929Open ↗
12/15/2018421925929Open ↗
▸BISFINAL ELEVATOR SIGNOFF1
03/22/2023421797746Open ↗
▸Safety & Tenant Protection1
▸BISSTREET TREE CHECKLIST1
09/13/2019421797746Open ↗
▸Environmental & Asbestos4
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
11/04/2019421797746Open ↗
12/15/2018421925929Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/28/2026Q00390676-I1Open ↗
08/13/2026Q00390676-P1Open ↗
▸Energy Compliance11
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
01/02/2020421797746Open ↗
11/04/2019421797746Open ↗
12/15/2018421925929Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
04/12/2023421797746Open ↗
▸BISFENESTRATION AREAS1
08/22/2022421797746Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
08/22/2022421797746Open ↗
▸BISLIGHTING IN DWELLING UNITS1
08/22/2022421797746Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
08/22/2022421797746Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
08/22/2022421797746Open ↗
▸BISFENESTRATION AIR LEAKAGE1
08/22/2022421797746Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
08/22/2022421797746Open ↗
▸Inspections & Test Reports4
▸BISSTRUCTURAL STABILITY - EXISTING BUILDINGS1
08/22/2022421797746Open ↗
▸BISFRAME (2008)/STRUCTURAL WOOD FRAME (2014) INSPECTION1
08/22/2022421797746Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
08/22/2022421797746Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
08/22/2022421797746Open ↗
▸Approvals, Objections & Sign-offs8
▸BISSCHEDULE A - OCCUPANCY / USE5
11/29/2022421797746Open ↗
10/11/2022421797746Open ↗
08/23/2022421797746Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter2
08/28/2026Q00390676-I1Open ↗
08/13/2026Q00390676-P1Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
09/13/2019421797746Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT2
09/13/2019421797746Open ↗
12/15/2018421925929Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
08/08/2022421797746Open ↗
▸Filing & Intake Forms7
▸BISADDITIONAL INFORMATION5
08/24/2022421797746Open ↗
04/27/2022421797746Open ↗
03/18/2022421797746Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING COVER SHEET2
09/13/2019421797746Open ↗
12/14/2018421925929Open ↗
▸Other Documents2
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
09/10/2020421797746Open ↗
▸BISPLOT DIAGRAM1
09/13/2019421797746Open ↗