1900Year Built
5Stories
O5Building Class
C6-2GZoning
9,433 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Office with commercial, 1-6 stories · Owner of record: SCOOBY DOOBY DOO LLC · 2,250 sf lot · 4.19 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipmentCivilGeneral
Roof36p · 2 filings · 20 docs
Floor 551p · 4 filings · 20 docs
Floor 446p · 4 filings · 20 docs
Floor 348p · 4 filings · 20 docs
Floor 249p · 4 filings · 20 docs
Floor 145p · 3 filings · 20 docs
Site & exterior3p · 1 filing · 2 docs
Filed — no permit issued3p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ACE GROUP NY607/08/2026
LAP REALTY603/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/15/2022$5.1M—— → —$541/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BMB BUILDING CONSULTING2403/21/2026
STUDIO C ARCHITECTS, PLLC603/21/2026
GREEN STUDIO203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JAYA CONTRACTING INCGeneral Contractor1307/08/2026
ACE GROUP NY CORPGeneral Contractor407/08/2026
AMERICAN STANDARD P&H CORORP.Plumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NTD ENGINEERING CONSULTAN76341109/30/2025
STUDIO C ARCHITECTS, PLLC3846206/02/2025
Building Lifecycle
All (105)Filed (16)Permit Issued (10)Signed Off (5)Violation (2)Inspection (10)Objection (32)Special Inspection (30)
12/19/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/12/2025
Signed off — Alteration
INSTALL NEW PLUMBING FIXTURES IN CONJUNCTION WITH APPLICATION #M00826448. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M00869190-I1
10/16/2025
Signed off — Alteration
To create elevator shaft from 1st floor to roof including elevator pit at first floor and elevator bulkhead at roof. This elevator application is in association with M00826448-I1 application.
M00898008-I1
10/14/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
LI-YUAN LIN
10/14/2025
Special inspection requirement — Footing and Foundation
LI-YUAN LIN
10/14/2025
Special inspection requirement — Structural Steel - High Strength Bolting
LI-YUAN LIN
10/14/2025
Special inspection requirement — Concrete - Cast-In-Place
LI-YUAN LIN
10/14/2025
Special inspection requirement — Structural Cold-Formed Steel
LI-YUAN LIN
10/14/2025
Special inspection requirement — Final
LI-YUAN LIN
10/14/2025
Special inspection requirement — Structural Steel - Welding
LI-YUAN LIN
10/14/2025
Special inspection requirement — Masonry
LI-YUAN LIN
10/14/2025
Special inspection requirement — Structural Steel - Details
LI-YUAN LIN
10/09/2025
Signed off — Alteration
PROPOSE NEW MINI-SPLIT SYSTEM AS PER PLAN. THE GENERAL CONSTRUCTION OR PLUMBING WORK WILL BE FILED SEPARATELY. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01163858-I1
09/30/2025
Filed — Alteration
To create elevator shaft from 1st floor to roof including elevator pit at first floor and elevator bulkhead at roof. This elevator application is in association with M00826448-I1 application.
M00898008-P3
09/30/2025
Special inspection requirement — Structural Cold-Formed Steel
LI-YUAN LIN
09/30/2025
Special inspection requirement — Masonry
LI-YUAN LIN
09/30/2025
Special inspection requirement — Concrete - Cast-In-Place
LI-YUAN LIN
09/30/2025
Special inspection requirement — Footing and Foundation
LI-YUAN LIN
09/30/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
LI-YUAN LIN
09/30/2025
Special inspection requirement — Structural Steel - Welding
LI-YUAN LIN
09/30/2025
Special inspection requirement — Structural Steel - High Strength Bolting
LI-YUAN LIN
09/30/2025
Special inspection requirement — Structural Steel - Details
LI-YUAN LIN
09/30/2025
Special inspection requirement — Final
LI-YUAN LIN
09/29/2025
Permit issued — General Construction
M00898008-I1-GC-CX
09/26/2025
Signed off — Alteration
Excavation to
M00899516-I1
09/16/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/12/2025
Special inspection requirement — Energy Code Compliance Inspections
LI-YUAN LIN
09/12/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
LI-YUAN LIN
09/12/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
LI-YUAN LIN
09/12/2025
Special inspection requirement — Maintenance information
LI-YUAN LIN
09/12/2025
Special inspection requirement — HVAC-R and service water heating equipment
LI-YUAN LIN
09/12/2025
Special inspection requirement — HVAC-R and service water heating system controls
LI-YUAN LIN
09/10/2025
Filed — Alteration
INSTALL NEW PLUMBING FIXTURES IN CONJUNCTION WITH APPLICATION #M00826448. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M00869190-P2
09/09/2025
Permit issued — Support of Excavation
M00899516-I1-SE
09/08/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/26/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
08/26/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/15/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/08/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
LI-YUAN LIN
08/08/2025
Special inspection requirement — Electrical motors and elevators
LI-YUAN LIN
08/08/2025
Special inspection requirement — Energy Code Compliance Inspections
LI-YUAN LIN
08/08/2025
Special inspection requirement — Fire-Resistance Rated Construction
LI-YUAN LIN
08/08/2025
Special inspection requirement — Fenestration air leakage
LI-YUAN LIN
08/08/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
LI-YUAN LIN
07/29/2025
Objection resolved — Addressed
07/24/2025
Objection raised — Fire_Protection
07/14/2025
Filed — Alteration CO
Change of Use Group and Occupancy Group at the 2nd, 3rd, 4th and 5th Floor, amend existing C.O. Install a new Elevator. No Change in Egress.
M00826448-P3
07/03/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/25/2025
Signed off — Alteration
M01185408-I1
06/06/2025
Filed — Alteration
PROPOSE NEW MINI-SPLIT SYSTEM AS PER PLAN. THE GENERAL CONSTRUCTION OR PLUMBING WORK WILL BE FILED SEPARATELY. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01163858-P1
06/02/2025
Filed — Alteration CO
Change of Use Group and Occupancy Group at the 2nd, 3rd, 4th and 5th Floor, amend existing C.O. Install a new Elevator. No Change in Egress.
M00826448-P2
02/24/2025
Filed — Alteration
M01185408-I1
02/24/2025
Permit issued — Supported Scaffold
M01185408-I1-SF
02/24/2025
Permit issued — Supported Scaffold
M01185408-I1-SH
02/07/2025
Permit issued — Mechanical Systems
M01163858-I1-MS
01/28/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/28/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
01/16/2025
Filed — Alteration
PROPOSE NEW MINI-SPLIT SYSTEM AS PER PLAN. THE GENERAL CONSTRUCTION OR PLUMBING WORK WILL BE FILED SEPARATELY. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01163858-I1
01/08/2025
Filed — Alteration
To create elevator shaft from 1st floor to roof including elevator pit at first floor and elevator bulkhead at roof. This elevator application is in association with M00826448-I1 application.
M00898008-P2
01/02/2025
Filed — Alteration
INSTALL NEW PLUMBING FIXTURES IN CONJUNCTION WITH APPLICATION #M00826448. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M00869190-P1
Latest 60 of 105 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offJAYA CONTRACTING INC09/29/2025
DOB NOWSupport of ExcavationSigned-offJAYA CONTRACTING INC09/09/2025
DOB NOWSupported ScaffoldSigned-offACE GROUP NY CORP02/24/2025
DOB NOWSupported ScaffoldSigned-offACE GROUP NY CORP02/24/2025
DOB NOWMechanical SystemsSigned-offJAYA CONTRACTING INC02/07/2025
DOB NOWFoundationSigned-offJAYA CONTRACTING INC07/25/2024
DOB NOWPlumbingSigned-offAMERICAN STANDARD P&H CORORP.07/18/2024
DOB NOWGeneral ConstructionPermit IssuedJAYA CONTRACTING INC07/12/2024
DOB NOWGeneral ConstructionPermit IssuedJAYA CONTRACTING INC05/09/2024
DOB NOWGeneral ConstructionPermit IssuedJAYA CONTRACTING INC02/14/2024
BIS—ISSUED458 CONSTRUCTION COMPANY INC10/12/2018
BISPLISSUEDAD PLUMBING CORP12/08/2017
BISOTISSUED458 CONSTRUCTION CO INC10/06/2017
BIS—ISSUED458 CONSTRCUTION COMPANY07/27/2017
BISEQISSUEDCD HOUSING CONSTRUCTION CORP04/03/2002
BISMHISSUEDCD HOUSING CONSTRUCTION CORP04/03/2002
BIS—ISSUEDRABER ENERPRISES LLC01/29/2002
2 projects · most recent 09/22/2025
General Wiring
FiledStatusContractorScope
09/22/2025CompleteKJK ELECTRIC INC—
02/20/2025CompleteA.C. MORGAN ELECTRICGeneral Wiring
1 project · most recent 09/25/2023
FiledStatusContractorScope
09/25/2023——1 scope_items
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
12/19/2025Pass-Final CND-Occupancy InspectionPassView ↗
09/16/2025Pass-Final CND-Occupancy InspectionPassView ↗
09/08/2025Pass-Final CND-Occupancy InspectionPassView ↗
08/26/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/26/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/15/2025Pass-Final CND-Occupancy InspectionPassView ↗
07/03/2025Pass-Final CND-Occupancy InspectionPassView ↗
01/28/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/28/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
07/29/2024Pass-Final CND-Occupancy InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 110
DateRequirementInspectorRole
10/14/2025Structural Steel - DetailsLI-YUAN LINspecial
10/14/2025Structural Stability – Alterations of existing buildingsLI-YUAN LINspecial
10/14/2025Concrete - Cast-In-PlaceLI-YUAN LINspecial
10/14/2025FinalLI-YUAN LINprogress
10/14/2025Footing and FoundationLI-YUAN LINprogress
10/14/2025Structural Cold-Formed SteelLI-YUAN LINspecial
10/14/2025Structural Steel - High Strength BoltingLI-YUAN LINspecial
10/14/2025Structural Steel - WeldingLI-YUAN LINspecial
10/14/2025MasonryLI-YUAN LINspecial
09/30/2025FinalLI-YUAN LINprogress
09/30/2025Footing and FoundationLI-YUAN LINprogress
09/30/2025Concrete - Cast-In-PlaceLI-YUAN LINspecial
09/30/2025MasonryLI-YUAN LINspecial
09/30/2025Structural Cold-Formed SteelLI-YUAN LINspecial
09/30/2025Structural Stability – Alterations of existing buildingsLI-YUAN LINspecial
09/30/2025Structural Steel - DetailsLI-YUAN LINspecial
09/30/2025Structural Steel - High Strength BoltingLI-YUAN LINspecial
09/30/2025Structural Steel - WeldingLI-YUAN LINspecial
09/12/2025HVAC-R and service water piping design and insulationLI-YUAN LINenergy_progress
09/12/2025Fire-Resistant Penetrations and JointsLI-YUAN LINspecial
09/12/2025Energy Code Compliance InspectionsLI-YUAN LINprogress
09/12/2025HVAC-R and service water heating equipmentLI-YUAN LINenergy_progress
09/12/2025HVAC-R and service water heating system controlsLI-YUAN LINenergy_progress
09/12/2025Maintenance informationLI-YUAN LINenergy_progress
08/08/2025Fenestration and door U-factor and product ratingsLI-YUAN LINenergy_progress
Latest 25 of 110.
▾Documents — 321 on file (BIS + DOB NOW)
▸Plans & Drawings16
▸DOB NOWPlans/Sketch16
08/29/2026M00899517-I1Request digital key ↗
08/29/2026M00899516-I1Request digital key ↗
08/29/2026M00898008-I1Request digital key ↗
Showing 3 of 16 on file for this type
▸Applications & Permits32
▸BISPLAN / WORK APPROVAL APPLICATION21
03/24/2020122957693Open ↗
02/13/2020122957693Open ↗
01/10/2020122957693Open ↗
Showing 3 of 21 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION5
09/01/2017122957693Open ↗
09/01/2017122957693Open ↗
09/01/2017122957693Open ↗
Showing 3 of 5 on file for this type
▸BISWORK PERMIT APPLICATION4
10/15/2018122957693Open ↗
12/08/2017123188193Open ↗
10/10/2017123188193Open ↗
Showing 3 of 4 on file for this type
▸BISApplication Withdrawal/Address Change Form OP-1131
08/01/2019103063382Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
08/18/2017122957693Open ↗
▸Zoning, Tax Lot & Property Records2
▸BISTAX LOT: FINAL LOT NUMBER ISSUED2
12/05/2019122957693Open ↗
07/01/2019122957693Open ↗
▸Seals & Professional Certifications129
▸DOB NOWProgress Inspector Seal & Signature57
08/30/2026M00826448-P3Open ↗
08/30/2026M00826448-P3Open ↗
08/30/2026M00826448-P3Open ↗
Showing 3 of 57 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature39
08/31/2026M00899516-I1Open ↗
08/31/2026M00899516-I1Open ↗
08/30/2026M00826448-P3Open ↗
Showing 3 of 39 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature16
08/28/2026M00869190-P2Open ↗
08/28/2026M00869190-I1Open ↗
08/28/2026M00869190-P1Open ↗
Showing 3 of 16 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION13
08/01/2019122957693Open ↗
07/01/2019122957693Open ↗
10/05/2018122957693Open ↗
Showing 3 of 13 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
10/05/2017123188193Open ↗
12/22/2016122957693Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
10/05/2017123188193Open ↗
12/19/2016122957693Open ↗
▸Trade Schedules & Equipment5
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE4
03/16/2018123188193Open ↗
02/20/2018123188193Open ↗
10/05/2017123188193Open ↗
Showing 3 of 4 on file for this type
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
07/24/2018122957693Open ↗
▸Safety & Tenant Protection11
▸BISSTREET TREE CHECKLIST5
07/19/2019122957693Open ↗
07/01/2019122957693Open ↗
10/05/2018122957693Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWStreet Tree Checklist4
08/13/2026M00826448-P2Open ↗
08/13/2026M00826448-P1Open ↗
08/13/2026M00826448-P3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWStreet Tree Sign Off1
08/13/2026M00826448-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026M00826448-I1Open ↗
▸Environmental & Asbestos19
▸DOB NOWDEP ACP-5: Asbestos Assessment Report15
08/28/2026M00869190-P1Open ↗
08/28/2026M00869190-P2Open ↗
08/28/2026M00869190-I1Open ↗
Showing 3 of 15 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
10/10/2017123188193Open ↗
02/25/2014121926648Open ↗
02/25/2014121926648Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance4
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
08/01/2019122957693Open ↗
07/19/2019122957693Open ↗
10/05/2018122957693Open ↗
Showing 3 of 4 on file for this type
▸Approvals, Objections & Sign-offs36
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST24
03/09/2020122957693Open ↗
12/05/2019122957693Open ↗
09/16/2019122957693Open ↗
Showing 3 of 24 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE9
03/24/2020122957693Open ↗
02/13/2020122957693Open ↗
01/10/2020122957693Open ↗
Showing 3 of 9 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
12/05/2019122957693Open ↗
03/19/2018122957693Open ↗
03/19/2018123188193Open ↗
▸Cost, Insurance & Ownership11
▸BISCOST AFFIDAVIT11
07/01/2019122957693Open ↗
10/05/2018122957693Open ↗
07/24/2018122957693Open ↗
Showing 3 of 11 on file for this type
▸Filing & Intake Forms45
▸BISBOROUGH INTAKE FORM34
03/24/2020122957693Open ↗
03/09/2020122957693Open ↗
02/13/2020122957693Open ↗
Showing 3 of 34 on file for this type
▸BISADDITIONAL INFORMATION8
03/24/2020122957693Open ↗
08/13/2019122957693Open ↗
07/01/2019122957693Open ↗
Showing 3 of 8 on file for this type
▸BISEFILING COVER SHEET3
10/05/2017123188193Open ↗
12/19/2016122957693Open ↗
02/25/2014121926648Open ↗
▸Other Documents11
▸DOB NOWProperty Ownership Certification4
08/13/2026M00826448-P1Open ↗
08/13/2026M00826448-P3Open ↗
08/13/2026M00826448-I1Open ↗
Showing 3 of 4 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION3
06/29/2018123188193Open ↗
06/21/2017122957693Open ↗
04/18/2016121926648Open ↗
▸BISPLOT DIAGRAM2
12/05/2019122957693Open ↗
02/25/2014121926648Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026M00899516-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026M00826448-I1Open ↗