← Back
Public elementary, junior or senior high
P.S. 250 George H. Lindsay
86 MONTROSE AVENUE · East Williamsburg · BIN 3071199
💬 Discuss this project
1964Year Built
4Stories
W1Building Class
R6Zoning
95,040 sfGross Floor Area
0Units
LL97 Covered6 Open Violations 2 unresolved · 4 paperwork only ▸FDNY Report ↗
Public elementary, junior or senior high · Owner of record: NYC DEPARTMENT OF EDUCATION · 80,000 sf lot · 1.19 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionGeneralOther
Roof53p · 2 filings · 20 docs
Bulkhead1p · 1 filing · 20 docs
Floor 316p · 1 filing · 20 docs
Floor 213p · 1 filing · 20 docs
Floor 131p · 3 filings · 20 docs
Basement30p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC SCHOOL CONSTRUCTION AUTHORITY1209/23/2026
NYC DEPARTMENT OF EDUCATION103/22/2026
DOE PS 250 040403/22/2026
DEPT OF EDUCATION P.S.250503/22/2026
D.O.E. P.S.250 0303/22/2026
DEPARTMENT OF EDUCATION503/22/2026
DOE - PS 250103/22/2026
DOB 040103/22/2026
DOE PS 250 GEORGE H L040103/22/2026
DOE 040303/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
RA1203/21/2026
STEPHEN B JACOBS GROUP403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CHARAN ELEC'L ENTERP'S INElectrical303/22/2026
GIOVANNI DITURIElectrical203/21/2026
BETANCOURT, JOHNElectrical103/21/2026
FRANCIS RICHARDSElectrical103/21/2026
SMITH, STEPHENElectrical103/21/2026
SURAJ RAMDEOElectrical103/21/2026
Building Lifecycle
All (122)Filed (14)Violation (56)Objection (22)Special Inspection (30)
09/23/2026
Objection raised — Other
09/18/2026
Objection raised — Other
09/17/2026
Filed — Alteration
INSTALLATION OF SIDEWALK SHED FOR PUBLIC PROTECTION DURING CONSTRUCTION WORK. FILED IN CONJUNCTION WITH APPLICATION#B01339631-I1.
B01422263-I1
09/16/2026
Filed — Alteration
INSTALLATION OF SUPPORTED SCAFFOLD FOR WORK LOCATION ACCESS. FILED IN CONJUNCTION WITH APPLICATION #B01339631-I1.
B01422265-I1
09/11/2026
Filed — Alteration
SELECTIVE REMOVALS OF EXISTING VENTILATORS, STEAM RADIATORS, AHU, 127 STEAM FINTUBE RADIATORS, EXHAUST FANS, ROOF MOUNTED CHILLER;, MECHANICAL UNIT INSTALLATION AS PER DESIGN PLANS SUMMARY OF WORK.
B01339631-P3
09/10/2026
Special inspection requirement — Post-installed Anchors
09/10/2026
Special inspection requirement — HVAC-R and service water heating system controls
09/10/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
09/10/2026
Special inspection requirement — Metering
09/10/2026
Special inspection requirement — Maintenance information
09/10/2026
Special inspection requirement — Energy Code Compliance Inspections
09/10/2026
Special inspection requirement — HVAC-R and service water heating equipment
09/10/2026
Special inspection requirement — Heating Systems
09/10/2026
Special inspection requirement — Shutoff dampers
09/10/2026
Special inspection requirement — Interior lighting power
09/10/2026
Special inspection requirement — Mechanical Systems
09/10/2026
Special inspection requirement — Final
09/10/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
09/10/2026
Special inspection requirement — Duct leakage testing, insulation and design
09/10/2026
Special inspection requirement — Exterior lighting power
09/10/2026
Special inspection requirement — Electrical motors and elevators
09/10/2026
Special inspection requirement — Lighting controls
06/25/2026
Special inspection requirement — Post-installed Anchors
06/09/2026
Violation issued (ECB, open)
Construction
06/09/2026
Violation issued (ECB, open)
Construction
06/09/2026
Violation issued (ECB, open)
Construction
05/12/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
05/12/2026
Special inspection requirement — Concrete - Cast-In-Place
05/12/2026
Special inspection requirement — Structural Steel - Details
05/12/2026
Special inspection requirement — Structural Steel - High Strength Bolting
05/12/2026
Special inspection requirement — Structural Steel - Welding
05/12/2026
Special inspection requirement — Post-installed Anchors
05/12/2026
Special inspection requirement — Final
05/08/2026
Filed — Alteration
SELECTIVE REMOVALS OF EXISTING VENTILATORS, STEAM RADIATORS, AHU, 127 STEAM FINTUBE RADIATORS, EXHAUST FANS, ROOF MOUNTED CHILLER;, MECHANICAL UNIT INSTALLATION AS PER DESIGN PLANS SUMMARY OF WORK.
B01339631-P1
05/08/2026
Filed — Alteration
SELECTIVE REMOVALS OF EXISTING VENTILATORS, STEAM RADIATORS, AHU, 127 STEAM FINTUBE RADIATORS, EXHAUST FANS, ROOF MOUNTED CHILLER;, MECHANICAL UNIT INSTALLATION AS PER DESIGN PLANS SUMMARY OF WORK.
B01339631-P2
05/07/2026
Special inspection requirement — Concrete - Cast-In-Place
05/07/2026
Special inspection requirement — Post-installed Anchors
05/07/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
05/07/2026
Special inspection requirement — Structural Steel - Details
05/07/2026
Special inspection requirement — Structural Steel - High Strength Bolting
04/10/2026
Objection resolved — Addressed
04/10/2026
Objection resolved — Addressed
04/10/2026
Objection resolved — Addressed
04/09/2026
Objection resolved — Addressed
04/09/2026
Objection resolved — Addressed
04/09/2026
Objection resolved — Addressed
02/09/2026
Objection raised — Other
01/29/2026
Filed — Alteration
SELECTIVE REMOVALS OF EXISTING VENTILATORS, STEAM RADIATORS, AHU, 127 STEAM FINTUBE RADIATORS, EXHAUST FANS, ROOF MOUNTED CHILLER;, MECHANICAL UNIT INSTALLATION AS PER DESIGN PLANS SUMMARY OF WORK.
B01339631-S6
12/31/2025
Objection raised — Other
12/31/2025
Objection raised — Other
12/31/2025
Objection raised — Other
12/30/2025
Objection raised — Other
12/30/2025
Objection raised — Other
12/26/2025
Filed — Alteration
SELECTIVE REMOVALS OF EXISTING VENTILATORS, STEAM RADIATORS, AHU, 127 STEAM FINTUBE RADIATORS, EXHAUST FANS, ROOF MOUNTED CHILLER;, MECHANICAL UNIT INSTALLATION AS PER DESIGN PLANS SUMMARY OF WORK.
B01339631-S3
12/26/2025
Filed — Alteration
SELECTIVE REMOVALS OF EXISTING VENTILATORS, STEAM RADIATORS, AHU, 127 STEAM FINTUBE RADIATORS, EXHAUST FANS, ROOF MOUNTED CHILLER;, MECHANICAL UNIT INSTALLATION AS PER DESIGN PLANS SUMMARY OF WORK.
B01339631-S5
12/26/2025
Filed — Alteration
SELECTIVE REMOVALS OF EXISTING VENTILATORS, STEAM RADIATORS, AHU, 127 STEAM FINTUBE RADIATORS, EXHAUST FANS, ROOF MOUNTED CHILLER;, MECHANICAL UNIT INSTALLATION AS PER DESIGN PLANS SUMMARY OF WORK.
B01339631-S2
12/26/2025
Filed — Alteration
SELECTIVE REMOVALS OF EXISTING VENTILATORS, STEAM RADIATORS, AHU, 127 STEAM FINTUBE RADIATORS, EXHAUST FANS, ROOF MOUNTED CHILLER;, MECHANICAL UNIT INSTALLATION AS PER DESIGN PLANS SUMMARY OF WORK.
B01339631-S1
12/26/2025
Filed — Alteration
SELECTIVE REMOVALS OF EXISTING VENTILATORS, STEAM RADIATORS, AHU, 127 STEAM FINTUBE RADIATORS, EXHAUST FANS, ROOF MOUNTED CHILLER;, MECHANICAL UNIT INSTALLATION AS PER DESIGN PLANS SUMMARY OF WORK.
B01339631-I1
05/27/2025
Violation issued (ECB, open)
Construction
11/26/2024
Objection resolved — Addressed
Latest 60 of 122 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
BISOTISSUEDL & R HOME IMPROVMENT COR11/26/2024
BISOTISSUEDL & R HOME IMPROVMENT COR11/26/2024
BISOTISSUEDL & R HOME IMPROVMENT COR12/01/2023
BISOTISSUEDL & R HOME IMPROVMENT COR12/01/2023
BISOTISSUEDL & R HOME IMPROVMENT COR09/06/2023
BISOTISSUEDL & R HOME IMPROVMENT COR09/06/2023
BISOTISSUEDL & R HOME IMPROVMENT COR11/17/2022
BISOTISSUEDL & R HOME IMPROVMENT COR11/17/2022
BISOTISSUEDWHITESTONE CONSTRUCTION CORP04/06/2020
BISOTISSUEDWHITESTONE CONSTRUCTION CORP03/29/2019
BISOTISSUEDWHITESTONE CONSTRUCTION CORP04/11/2018
BISOTRE-ISSUEDWHITESTONE CONSTRUCTION CORP12/13/2017
BISEQISSUEDCREAMER ENVIRONMENTAL INC07/10/2017
BISOTISSUEDWHITESTONE CONSTRUCTION CORP03/27/2015
BISEQISSUEDWHITESTONE CONSTRUCTION CORP03/31/2014
BISOTISSUEDWHITESTONE CONSTRUCTION CORP03/31/2014
BISEQISSUEDWHITESTONE CONSTRUCTION CORP03/31/2014
BISEQISSUEDWHITESTONE CONSTRUCTION CORP03/31/2014
BISEQISSUEDWHITESTONE CONSTRUCTION CORP02/14/2014
BISEQISSUEDWHITESTONE CONSTRUCTION CORP01/27/2014
BISEQISSUEDWHITESTONE CONSTRUCTION CORP01/27/2014
BISOTISSUEDWHITESTONE CONSTRUCTION CORP11/06/2013
BISPLISSUEDFORSYTHE P&H CORP01/20/2006
BISFPISSUEDFIREMASTERS01/12/2006
BISOTISSUEDMONPAT CONTRUCTION ,INC.06/03/1999
BISPLISSUEDA. BERWIND PLUMBING & HEATING CO06/03/1999
BISOTISSUEDAURASH CONSTRUCTION05/26/1999
BISEQISSUEDACE SCAFFOLD CO INC05/12/1999
BISOTISSUEDAURASH CONSTRUCTION11/09/1998
BISEQISSUEDSPRING SCAFFOLDING INC04/29/1998
BISPLISSUEDSUNSET PLUMBING & FIRE PROTECT08/05/1993
BISMHISSUEDMECHANICAL CM CORPORATION07/16/1993
BISOTISSUEDMECHANICAL CM CORPORATION05/27/1993
1 project · most recent 09/11/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
09/11/2026——Heating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Mitsubishi Electric PKA-AK12NL 12,000 BTU · Split System ×4
PUY-AK12NL 12,000 BTU · Condensing Unit ×4
PKA-AK24NL 24,000 BTU · Split System ×2
PKA-AK36NL 36,000 BTU · Vrf Indoor ×2
PUY-AH24NL 24,000 BTU · Condensing Unit ×2
PUY-AK36NL 36,000 BTU · Condensing Unit ×2
Polar Cooling Technologies P-RTP.C.F40.AC.HR.PE.HP 480,000 BTU · Rooftop Unit ×4
P-RTP.C.E30.AC.HR.PE.HP 337,000 BTU · Rooftop Unit ×2
P-RTP.C.F40.AC.HP 418,000 BTU · Rooftop Unit ×2
P-RTP.C.F60.AC.HR.PE.HP 625,000 BTU · Rooftop Unit ×2
P-RTP.C.F60AC.HR.PE.HP 671,000 BTU · Rooftop Unit ×2
Polartech P-RTP.C.F60.AC.HR.PE.HP 641,000 BTU · Rooftop Unit ×2
Ventilation
Greenheck G-120-VG 1,125 CFM · Exhaust Fan ×4
CUE-300HP-VG 3,850 CFM · Exhaust Fan ×2
G-080-VG 200 CFM · Exhaust Fan ×2
G-200-VG 2,660 CFM · Exhaust Fan ×2
SE1-8-440-VG 175 CFM · Exhaust Fan ×2
SQ-97-VG 100 CFM · Exhaust Fan ×2
Captiveaire WP-10 100 CFM · Exhaust Fan ×2
1 project · most recent 09/11/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
09/11/2026——Gas, Storm, Water/Sanitary
14 projects · most recent 07/31/2026
General Wiring
FiledStatusContractorScope
07/31/2026Permit IssuedABM ELECTRIC, INCGeneral Wiring
02/16/2026CompleteGEMINI ELECTRIC CO., INC.—
07/08/2024CompleteCHARAN ELEC'L ENTERP'S IN—
08/30/2023CompleteCHARAN ELEC'L ENTERP'S IN—
07/10/2023CompleteCHARAN ELEC'L ENTERP'S IN—
11/22/2022CompleteMETROPOLITAN ELEC OF NY IGeneral Wiring
08/26/2022CompleteCHARAN ELEC'L ENTERP'S IN—
03/09/2022CompleteCHARAN ELEC'L ENTERP'S IN—
01/05/2022CompleteCHARAN ELEC'L ENTERP'S IN—
05/10/2021Permit IssuedA & S ELECTRIC INC.General Wiring
04/19/2021CompleteABM ELECTRIC, INC—
01/20/2020CompleteCHARAN ELEC'L ENTERP'S IN—
12/06/2018CompleteA & S ELECTRIC INC.—
12/28/2017CompleteCHARAN ELEC'L ENTERP'S IN—
2 projects · most recent 09/11/2026
Steel Concrete
FiledStatusContractorScope
09/11/2026——Steel, Concrete
10/15/2024——1 scope_items
2 projects · most recent 09/17/2026
Sidewalk Shed Scaffold
FiledStatusContractorScope
09/17/2026——Sidewalk Shed
09/16/2026——Scaffold
▾Special Inspection Requirements (DOB NOW) — 64
DateRequirementInspectorRole
09/10/2026Fire-Resistant Penetrations and Joints—special
09/10/2026Heating Systems—special
09/10/2026Mechanical Systems—special
09/10/2026Post-installed Anchors—special
09/10/2026Energy Code Compliance Inspections—progress
09/10/2026Final—progress
09/10/2026Interior lighting power—energy_progress
09/10/2026HVAC-R and service water heating equipment—energy_progress
09/10/2026Lighting controls—energy_progress
09/10/2026HVAC-R and service water heating system controls—energy_progress
09/10/2026Duct leakage testing, insulation and design—energy_progress
09/10/2026Maintenance information—energy_progress
09/10/2026Metering—energy_progress
09/10/2026Shutoff dampers—energy_progress
09/10/2026HVAC-R and service water piping design and insulation—energy_progress
09/10/2026Exterior lighting power—energy_progress
09/10/2026Electrical motors and elevators—energy_progress
06/25/2026Post-installed Anchors—special
05/12/2026Final—progress
05/12/2026Post-installed Anchors—special
05/12/2026Structural Steel - Details—special
05/12/2026Structural Stability – Alterations of existing buildings—special
05/12/2026Concrete - Cast-In-Place—special
05/12/2026Structural Steel - Welding—special
05/12/2026Structural Steel - High Strength Bolting—special
Latest 25 of 64.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
P.S. K250Education—
Project B00461962 Alteration · Filing Withdrawn · 02/05/2021
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 81 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch12
09/23/2026B01422263-I1Request digital key ↗
09/22/2026B01422265-I1Request digital key ↗
08/24/2026B01097146-S1Request digital key ↗
Showing 3 of 12 on file for this type
▸DOB NOWPlans/Sketch - General Construction1
09/01/2026B00461962-I1Request digital key ↗
▸Seals & Professional Certifications14
▸DOB NOWDPL-1: Design Professional Seal & Signature14
09/23/2026B01422263-I1Open ↗
09/22/2026B01422265-I1Open ↗
09/15/2026B01339631-P3Open ↗
Showing 3 of 14 on file for this type
▸Approvals, Objections & Sign-offs35
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter14
09/23/2026B01422263-I1Open ↗
09/22/2026B01422265-I1Open ↗
09/15/2026B01339631-P3Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)13
09/23/2026B01422263-I1Open ↗
09/22/2026B01422265-I1Open ↗
09/15/2026B01339631-P3Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)8
08/13/2026B01339631-I1Open ↗
08/13/2026B01339631-S6Open ↗
08/13/2026B01339631-S2Open ↗
Showing 3 of 8 on file for this type
▸Other Documents19
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal19
09/23/2026B01422263-I1Open ↗
09/22/2026B01422265-I1Open ↗
09/15/2026B01339631-P3Open ↗
Showing 3 of 19 on file for this type