← Back
Full service hotel
Warren Street Hotel
86 WARREN STREET · BIN 1090140
💬 Discuss this project
2021Year Built
11Stories
H2Building Class
C6-3AZoning
60,855 sfGross Floor Area
14Units
Rent Stabilized2 Open Violations ▸FDNY Report ↗
Full service hotel · Owner of record: 86-90 WARREN ST. L.L. · 7,283 sf lot · 8.36 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalMechanicalPlumbingFire ProtectionEquipmentGeneral
Roof15p · 8 filings · 20 docs
Bulkhead10p · 5 filings · 20 docs
Floor 113p · 3 filings · 20 docs
Floor 103p · 3 filings · 20 docs
Floor 93p · 3 filings · 20 docs
Floor 83p · 3 filings · 20 docs
Floor 73p · 3 filings · 20 docs
Floor 64p · 3 filings · 20 docs
Floor 53p · 3 filings · 20 docs
Floor 44p · 3 filings · 20 docs
Floor 34p · 3 filings · 20 docs
Floor 24p · 3 filings · 20 docs
Floor 13p · 2 filings · 20 docs
Mezzanine7p · 3 filings · 20 docs
Cellar5p · 2 filings · 20 docs
Sub-Cellar3p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
STONEHILL TAYLOR ARCHITECT4807/08/2026
GLENCO CONTRACTING GROUP307/08/2026
PAVARINI MCGOVERN3207/08/2026
86-90 WARREN ST. L.L.2303/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JAM CONSULTANTS, INC.2203/21/2026
LOMBARDO BUILDING CONSULTANTS803/21/2026
Rigid Structural Design, LLC603/21/2026
AE DESIGN SOLUTION1803/21/2026
A1 EXPEDITING SERVICE403/21/2026
NEXUS CONSULTING NYC, INC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TRI BOROUGH SCAFFOLDINGGeneral Contractor2707/08/2026
MC SUPERSTRUCTURE INCGeneral Contractor1003/21/2026
PAVARINI MCGOVERN LLCGeneral Contractor1007/08/2026
PEAK FIRE PROTECTION LLCFire Protection807/08/2026
CUSTOM METALCRAFTERS INCGeneral Contractor707/08/2026
DEL-SAVIO CONSTR. CORPGeneral Contractor307/08/2026
JOSEPH SORTINOElectrical203/21/2026
CHAMP PLUMBING & HTG CORPPlumbing107/08/2026
GLENCO CONTRACTING GROUPGeneral Contractor107/08/2026
HUDSON AWNING COMPANY INCGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
STUDIO NYANDAK ARCHITECTU8378102/12/2026
ATLAS ATC ENGINEERING INC8011509/13/2023
ATLANTIC ENGINEERINGLABOR1381205/11/2023
Building Lifecycle
All (251)Filed (34)Permit Issued (41)Signed Off (17)Violation (36)Inspection (15)Objection (78)Special Inspection (30)
05/11/2026
Violation issued (HPD, closed)
A
03/05/2026
Permit issued — General Construction
M01351981-I1-GC
02/18/2026
Violation issued (FDNY_ORDER, closed)
02/18/2026
Violation issued (FDNY_ORDER, closed)
02/18/2026
Violation issued (FDNY_ORDER, closed)
02/12/2026
Filed — Alteration
M01351981-I1
01/27/2026
Special inspection requirement — Final
Ronald Sydoruk
01/27/2026
Special inspection requirement — Post-installed Anchors
TENZIN NYANDAK
01/27/2026
Special inspection requirement — Tenant Protection Plan Compliance
TENZIN NYANDAK
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/10/2025
Objection raised — Other
06/10/2025
Objection raised — Other
05/19/2025
Filed — Alteration CO
FILING ALTERATION FOR 12th FLOOR ROOF ADDITION ENLARGEMENT AND ADDING USES
M01221753-I1
05/06/2025
Special inspection requirement — Fenestration air leakage
05/06/2025
Special inspection requirement — Insulation placement and R values
05/06/2025
Special inspection requirement — Fenestration areas
05/06/2025
Special inspection requirement — Air barrier - visual inspection
05/06/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
05/06/2025
Special inspection requirement — Air barrier continuity plan testing
05/06/2025
Special inspection requirement — Tenant Protection Plan Compliance
05/06/2025
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
05/06/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
05/06/2025
Special inspection requirement — Fire-Resistance Rated Construction
07/24/2024
Violation issued (FDNY_ORDER, closed)
07/24/2024
Violation issued (FDNY_ORDER, closed)
03/27/2024
Signed off — Alteration
INSTALLATION OF COMBINED SPRINKLER/STANDPIPE SYSTEM.APPLICATION BEING FILED IN CONJUNCTION WITH NEW BUILDING #121205506.
M00323548-I1
12/04/2023
Signed off — Alteration
INSTALLATION OF EMERGENCY GENERATOR IN CONUCTION WITH NEW BUILDING #121205506
M00323895-I1
11/30/2023
Signed off — Alteration
INSTALLATION OF (2) GAS-FIRED BOILERS.
M00323506-I1
11/21/2023
Signed off — Alteration
INSTALLATION AND USE OF TEMPORARY MATERIAL PLATFORM AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00603006-I1
11/20/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
11/17/2023
Signed off — Alteration
M00609817-I1
11/17/2023
Signed off — Alteration
INSTALLATION OF FUEL STORAGE FOR EMERGENCY GENERATOR.
M00323866-I1
11/17/2023
Signed off — Alteration
FILING FOR A TEMPORARY CONSTRUCTION FENCE
M00219507-I1
11/16/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
11/15/2023
Signed off — Alteration
INSTALLATION OF TEMPORARY STORAGE OF MATERIALS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00819492-I1
11/15/2023
Signed off — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00609813-I1
11/15/2023
Signed off — Alteration
Installation of temporary roof protection and OHP per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M00637454-I1
11/15/2023
Signed off — Alteration
INSTALLATION OF TEMPORARY BARRICADE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00609819-I1
10/05/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
09/18/2023
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
09/13/2023
Filed — Alteration
INSTALLATION OF COMBINED SPRINKLER/STANDPIPE SYSTEM.APPLICATION BEING FILED IN CONJUNCTION WITH NEW BUILDING #121205506.
M00323548-P5
09/13/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
GIORGI KHARDZEISHVILI
09/13/2023
Special inspection requirement — Sprinkler Systems
GIORGI KHARDZEISHVILI
09/13/2023
Special inspection requirement — Standpipe Systems
GIORGI KHARDZEISHVILI
09/01/2023
Signed off — Alteration
Installation of 7,000# temporary dual car personnel/material hoist in conjunction with New Building #121205506(filed separately) as per plan submitted. Work shall comply with 2014 building code. No change in use, egress and/or occupancy with this filing
M00625307-I1
08/25/2023
Permit issued — Standpipe
M00323548-I1-EW-SP
08/24/2023
Inspection — Certified StandPipe-SD-Fixtures-Finish-SD
Certified
View inspection ↗
08/17/2023
Permit issued — Sidewalk Shed
M00609813-I1-SH
08/15/2023
Inspection — Pass-Final SD - Fire Pump
Pass
View inspection ↗
08/14/2023
Inspection — Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve Test
Certified
View inspection ↗
08/10/2023
Signed off — Alteration
INSTALLATION AND USE OF MOBILE EQUIPMENT AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00776398-I1
08/10/2023
Special inspection requirement — Final
GIORGI KHARDZEISHVILI
08/10/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
GIORGI KHARDZEISHVILI
08/10/2023
Special inspection requirement — Emergency and Standby Power Systems (Generator)
GIORGI KHARDZEISHVILI
08/10/2023
Special inspection requirement — Mechanical Systems
GIORGI KHARDZEISHVILI
08/03/2023
Signed off — Alteration
INSTALLATION AND USE OF MOBILE EQUIPMENT AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00763925-I1
08/03/2023
Signed off — Alteration
M00763880-I1
08/02/2023
Filed — Alteration
INSTALLATION OF EMERGENCY GENERATOR IN CONUCTION WITH NEW BUILDING #121205506
M00323895-P1
07/31/2023
Permit issued — Protection and Mechanical Methods
M00637454-I1-PM
Latest 60 of 251 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedHUDSON AWNING COMPANY03/05/2026
DOB NOWStandpipeSigned-offPEAK FIRE PROTECTION LLC08/25/2023
DOB NOWSidewalk ShedSigned-offMC SUPERSTRUCTURE INC08/17/2023
DOB NOWProtection and Mechanical MethodsSigned-offMC SUPERSTRUCTURE INC07/31/2023
DOB NOWProtection and Mechanical MethodsSigned-offMC SUPERSTRUCTURE INC07/31/2023
DOB NOWConstruction FenceSigned-offMC SUPERSTRUCTURE INC07/29/2023
DOB NOWProtection and Mechanical MethodsSigned-offMC SUPERSTRUCTURE INC07/29/2023
DOB NOWProtection and Mechanical MethodsSigned-offCUSTOM METALCRAFTERS INC07/20/2023
DOB NOWSprinklersSigned-offPEAK FIRE PROTECTION LLC07/18/2023
DOB NOWMechanical SystemsSigned-offPAVARINI MCGOVERN LLC05/11/2023
DOB NOWBoiler EquipmentSigned-offCHAMP PLUMBING & HTG CORP03/17/2023
DOB NOWProtection and Mechanical MethodsSigned-offTRI BOROUGH SCAFFOLDING02/09/2023
DOB NOWConstruction FenceSigned-offPAVARINI MCGOVERN LLC12/13/2022
DOB NOWBoiler EquipmentSigned-offCHAMPION COMBUSTION CORP12/03/2022
DOB NOWConstruction FenceSigned-offTRI BOROUGH SCAFFOLDING11/10/2022
DOB NOWProtection and Mechanical MethodsSigned-offTRI BOROUGH SCAFFOLDING10/27/2022
DOB NOWProtection and Mechanical MethodsSigned-offTRI BOROUGH SCAFFOLDING10/27/2022
DOB NOWProtection and Mechanical MethodsSigned-offTRI BOROUGH SCAFFOLDING10/11/2022
DOB NOWSidewalk ShedSigned-offTRI BOROUGH SCAFFOLDING10/11/2022
DOB NOWProtection and Mechanical MethodsSigned-offCUSTOM METALCRAFTERS INC07/27/2022
DOB NOWProtection and Mechanical MethodsSigned-offCUSTOM METALCRAFTERS INC06/24/2022
DOB NOWProtection and Mechanical MethodsSigned-offCUSTOM METALCRAFTERS INC06/24/2022
DOB NOWSprinklersSigned-offPEAK FIRE PROTECTION LLC04/27/2022
DOB NOWSprinklersSigned-offPEAK FIRE PROTECTION LLC04/27/2022
DOB NOWSprinklersSigned-offPEAK FIRE PROTECTION LLC04/16/2022
DOB NOWSprinklersSigned-offPEAK FIRE PROTECTION LLC04/16/2022
DOB NOWSupported ScaffoldSigned-offDEL-SAVIO CONSTR. CORP02/15/2022
DOB NOWConstruction FenceSigned-offPAVARINI MCGOVERN LLC12/09/2021
DOB NOWProtection and Mechanical MethodsSigned-offTRI BOROUGH SCAFFOLDING11/30/2021
DOB NOWProtection and Mechanical MethodsSigned-offTRI BOROUGH SCAFFOLDING11/20/2021
DOB NOWStandpipeSigned-offPEAK FIRE PROTECTION LLC11/15/2021
DOB NOWConstruction FenceSigned-offTRI BOROUGH SCAFFOLDING11/15/2021
DOB NOWStandpipeSigned-offPEAK FIRE PROTECTION LLC11/15/2021
DOB NOWSidewalk ShedSigned-offTRI BOROUGH SCAFFOLDING10/14/2021
DOB NOWProtection and Mechanical MethodsSigned-offGLENCO CONTRACTING GROUP10/14/2021
DOB NOWProtection and Mechanical MethodsSigned-offTRI BOROUGH SCAFFOLDING10/13/2021
DOB NOWSupported ScaffoldSigned-offDEL-SAVIO CONSTR. CORP08/12/2021
DOB NOWConstruction FenceSigned-offPAVARINI MCGOVERN LLC12/23/2020
DOB NOWConstruction FenceSigned-offPAVARINI MCGOVERN LLC12/14/2020
DOB NOWConstruction FenceSigned-offPAVARINI MCGOVERN LLC11/12/2020
+ 29 more permits on file
8 projects · most recent 12/12/2024
General Wiring
FiledStatusContractorScope
12/12/2024CompleteTOP SHELF ELECTRIC CORPGeneral Wiring
07/21/2022CompleteJAM ELECTRICAL CORP—
04/28/2022CompleteTOP SHELF ELECTRIC CORP3 meters, 3 new_meters
02/15/2022CompleteJAM ELECTRICAL CORP—
02/15/2022CompleteJAM ELECTRICAL CORP—
12/16/2021CompleteTOP SHELF ELECTRIC CORP—
11/29/2021CompleteV. VASS ELECTRIC CORP—
10/07/2021CompleteV. VASS ELECTRIC CORP—
▾Field Inspections (DOB CAP) — 15
DateTypeResultReport
11/20/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/16/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/05/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/18/2023Pass-Final Boiler Equipment InspectionPassView ↗
08/24/2023Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
08/15/2023Pass-Final SD - Fire PumpPassView ↗
08/14/2023Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve TestCertifiedView ↗
07/28/2023Fail-Final SD - Fire PumpFailView ↗
07/10/2023Pass-Final Boiler Equipment InspectionPassView ↗
10/15/2022Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
06/20/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/19/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/13/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/06/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/15/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 37
DateRequirementInspectorRole
01/27/2026FinalRonald Sydorukprogress
01/27/2026Post-installed AnchorsTENZIN NYANDAKspecial
01/27/2026Tenant Protection Plan ComplianceTENZIN NYANDAKspecial
05/06/2025Fenestration air leakage—energy_progress
05/06/2025Insulation placement and R values—energy_progress
05/06/2025Fenestration areas—energy_progress
05/06/2025Air barrier - visual inspection—energy_progress
05/06/2025Fenestration and door U-factor and product ratings—energy_progress
05/06/2025Air barrier continuity plan testing—energy_progress
05/06/2025Tenant Protection Plan Compliance—special
05/06/2025Exterior Insulation and Finish Systems (EIFS)—special
05/06/2025Fire-Resistant Penetrations and Joints—special
05/06/2025Fire-Resistance Rated Construction—progress
09/13/2023Fire-Resistant Penetrations and JointsGIORGI KHARDZEISHVILIspecial
09/13/2023Sprinkler SystemsGIORGI KHARDZEISHVILIspecial
09/13/2023Standpipe SystemsGIORGI KHARDZEISHVILIspecial
08/10/2023FinalGIORGI KHARDZEISHVILIprogress
08/10/2023Fire-Resistant Penetrations and JointsGIORGI KHARDZEISHVILIspecial
08/10/2023Emergency and Standby Power Systems (Generator)GIORGI KHARDZEISHVILIspecial
08/10/2023Mechanical SystemsGIORGI KHARDZEISHVILIspecial
07/26/2023Mechanical SystemsGIORGI KHARDZEISHVILIspecial
07/26/2023Emergency and Standby Power Systems (Generator)GIORGI KHARDZEISHVILIspecial
07/26/2023Fire-Resistant Penetrations and JointsGIORGI KHARDZEISHVILIspecial
07/26/2023FinalGIORGI KHARDZEISHVILIprogress
05/11/2023Fire-Resistant Penetrations and JointsFAWZY SALIBspecial
Latest 25 of 37.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
The Warren Street HotelOther—
Project M01351981 Alteration · Permit Entire · 02/12/2026
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 604 on file (BIS + DOB NOW)
▸Plans & Drawings38
▸DOB NOWPlans/Sketch24
09/03/2026M00552504-I1Request digital key ↗
09/03/2026M00609819-I1Request digital key ↗
09/03/2026M00609819-P1Request digital key ↗
Showing 3 of 24 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler4
09/05/2026M00323548-P4Request digital key ↗
09/05/2026M00323548-P1Request digital key ↗
09/05/2026M00323548-P5Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Standpipe4
09/05/2026M00323548-P4Request digital key ↗
09/05/2026M00323548-P1Request digital key ↗
09/05/2026M00323548-P5Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems2
08/29/2026M00323895-P1Request digital key ↗
08/14/2026M00323895-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Boiler Equipment2
09/05/2026M00323506-I1Request digital key ↗
09/05/2026M00323866-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Place of Assembly1
08/31/2026M00839871-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
08/15/2026M00219507-I1Request digital key ↗
▸Applications & Permits116
▸BISPLAN / WORK APPROVAL APPLICATION91
04/25/2024121205506Open ↗
01/17/2024140907678Open ↗
12/20/2023123101874Open ↗
Showing 3 of 91 on file for this type
▸BISWORK PERMIT APPLICATION24
08/10/2023141009012Open ↗
09/20/2022141020687Open ↗
12/23/2021121205506Open ↗
Showing 3 of 24 on file for this type
▸BISPLACE OF ASSEMBLY (PA) SIGNOFF FOR S1
05/01/2025121205506Open ↗
▸Zoning, Tax Lot & Property Records10
▸BISZONING DIAGRAM3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISZONING EXHIBIT I: CERTIFICATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISVERIFY TAX LOT1
03/12/2025121205506Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
01/24/2024121205506Open ↗
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026M01221753-I1Open ↗
▸Seals & Professional Certifications91
▸DOB NOWDPL-1: Design Professional Seal & Signature34
09/05/2026M00323506-I1Open ↗
09/05/2026M00323548-P4Open ↗
09/05/2026M00323548-P1Open ↗
Showing 3 of 34 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION20
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 20 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
09/23/2026M00323866-I1Open ↗
09/23/2026M00323506-I1Open ↗
09/01/2026M00323548-P5Open ↗
Showing 3 of 12 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
09/23/2026M00323506-I1Open ↗
08/26/2026M00323895-P1Open ↗
08/26/2026M00323895-I1Open ↗
Showing 3 of 5 on file for this type
▸BISAPPLICANT OWNER SIGNATURE4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
09/19/2022141020687Open ↗
05/06/2022141009012Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
09/19/2022141020687Open ↗
05/06/2022141009012Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
09/19/2022141020687Open ↗
05/06/2022141009012Open ↗
▸Trade Schedules & Equipment31
▸BISEQUIPMENT USE PERMITS14
12/13/2023121205506Open ↗
12/13/2023121205506Open ↗
12/13/2023121205506Open ↗
Showing 3 of 14 on file for this type
▸BISSCHEDULE B - PLUMBING9
04/25/2024121205506Open ↗
12/14/2023121205506Open ↗
08/09/2023121205506Open ↗
Showing 3 of 9 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT6
12/13/2023121205506Open ↗
12/13/2023121205506Open ↗
12/13/2023121205506Open ↗
Showing 3 of 6 on file for this type
▸BISDETECTOR:CARBON MONOXIDE-CERT.OF INSTALL1
09/15/2023121205506Open ↗
▸BIS* BOILER (BL) SIGNOFF1
04/30/2025121205506Open ↗
▸Safety & Tenant Protection7
▸BISSTREET TREE CHECKLIST5
02/09/2022140872438Open ↗
Showing 1 of 5 on file for this type
▸BISSTREET TREE SUPPORTING DOCUMENT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Environmental & Asbestos30
▸DOB NOWOER: Notice to Proceed9
09/05/2026M00323548-P4Open ↗
09/05/2026M00323548-P1Open ↗
09/05/2026M00323548-P5Open ↗
Showing 3 of 9 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION6
07/23/2024140872438Open ↗
03/27/2024140662129Open ↗
12/20/2023140907678Open ↗
Showing 3 of 6 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED6
09/19/2022141020687Open ↗
05/06/2022141009012Open ↗
Showing 2 of 6 on file for this type
▸DOB NOWOER: Notice of Satisfaction2
09/05/2026M00323866-I1Open ↗
08/13/2026M00323895-I1Open ↗
▸Energy Compliance11
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY5
07/11/2023121205506Open ↗
Showing 1 of 5 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
01/24/2024121205506Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
08/24/2023121205506Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026M00323895-I1Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
09/05/2026M00323506-I1Open ↗
▸Inspections & Test Reports49
▸BISTECHNICAL REPORT: RESPONSIBILITY29
04/01/2024140662129Open ↗
12/20/2023140907678Open ↗
08/10/2023121205506Open ↗
Showing 3 of 29 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX5
12/01/2021121205506Open ↗
12/01/2021121205506Open ↗
12/01/2021121205506Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER3
08/17/2023121205506Open ↗
08/17/2023121205506Open ↗
Showing 2 of 3 on file for this type
▸BISSOIL REPORT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSTRUCTURAL STEEL - DETAILS2
09/12/2023121205506Open ↗
09/12/2023121205506Open ↗
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)2
09/20/2022141020687Open ↗
09/19/2022141020687Open ↗
▸BISMASONRY2
09/12/2023121205506Open ↗
09/12/2023121205506Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSTRUCTURAL STEEL - HIGH STRENGTH BOLTING1
07/11/2023121205506Open ↗
▸BISDEP Hydrant Flow Test Letter1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs54
▸BISLETTERS - SUPPORTING DOCUMENTATION19
08/17/2023121205506Open ↗
11/08/2021140662129Open ↗
Showing 2 of 19 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE15
07/25/2023121205506Open ↗
07/21/2023121205506Open ↗
07/14/2023121205506Open ↗
Showing 3 of 15 on file for this type
▸BISADMINISTRATIVE OBJECTIONS7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISSUPERSEDING LETTER5
12/23/2021121205506Open ↗
Showing 1 of 5 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST5
04/05/2024140662129Open ↗
01/23/2024140907678Open ↗
12/05/2023141009012Open ↗
Showing 3 of 5 on file for this type
▸BISFINAL2
09/05/2023141020687Open ↗
06/12/2023123882432Open ↗
▸BISFUEL STORAGE (FS) SIGNOFF1
04/30/2025121205506Open ↗
▸Cost, Insurance & Ownership22
▸BISCOST AFFIDAVIT10
09/19/2022141020687Open ↗
Showing 1 of 10 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE5
08/17/2023121205506Open ↗
12/23/2021121205506Open ↗
Showing 2 of 5 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW35
12/20/2023140907678Open ↗
12/04/2023141009012Open ↗
12/04/2023141009012Open ↗
Showing 3 of 5 on file for this type
▸BISAcord 25 (Acord Certificate of Liability Insurance)2
12/23/2021121205506Open ↗
Showing 1 of 2 on file for this type
▸Filing & Intake Forms68
▸BISADDITIONAL INFORMATION30
03/22/2024121205506Open ↗
02/28/2024121205506Open ↗
08/17/2023121205506Open ↗
Showing 3 of 30 on file for this type
▸BISEFILING COVER SHEET22
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 22 on file for this type
▸BISBOROUGH INTAKE FORM10
12/22/2022121205506Open ↗
12/23/2021121205506Open ↗
11/08/2021140662129Open ↗
Showing 3 of 10 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET6
09/19/2022141020687Open ↗
05/06/2022141009012Open ↗
Showing 2 of 6 on file for this type
▸Other Documents19
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION10
12/20/2023123101874Open ↗
Showing 1 of 10 on file for this type
▸BISPLOT DIAGRAM3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISBPP - SUPPORTING DOCUMENTATION2
05/18/2022140872438Open ↗
Showing 1 of 2 on file for this type
▸BISVESTIBULES1
08/10/2023121205506Open ↗
▸BISMAINTENANCE INFORMATION1
08/10/2023121205506Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026M01221753-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026M01221753-I1Open ↗