← Back
One family attached or semi-detached
860 CAULDWELL AVENUE
BRONX · Melrose · BIN 2099723
💬 Discuss this project
1992Year Built
2Stories
A5Building Class
R6Zoning
—Gross Floor Area
1Units
1 Open Violation ▸FDNY Report ↗
One family attached or semi-detached · 0.62 FAR built · Flood zone X
Locations of Work
ElectricalGeneral
Roof1 filing · 7 docs
Floor 21p · 1 filing · 7 docs
Floor 1
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TRINITY SOLAR LLC112/04/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ACA ASSOCIATES103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TRINITY SOLAR LLCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BITOPI CONSULTANTS LLC7036112/04/2024
Building Lifecycle
All (8)Filed (1)Permit Issued (1)Violation (1)Special Inspection (5)
11/10/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/06/2024
Permit issued — Solar
X01149674-I1-SL
12/04/2024
Filed — Alteration
Installation of solar system on the roof as per plan. No change in use, egress or occupancy
X01149674-I1
12/02/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
KAMRUL AHSAN
12/02/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
KAMRUL AHSAN
12/02/2024
Special inspection requirement — Energy Code Compliance Inspections
Ayracon Almaraz
12/02/2024
Special inspection requirement — Final
Ayracon Almaraz
12/02/2024
Special inspection requirement — Air barrier - visual inspection
Ayracon Almaraz
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarPermit IssuedTRINITY SOLAR LLC12/06/2024
BISPLISSUEDDUO PLUMBING & HTG CORP.09/29/1992
BIS—ISSUEDM.R.L.S. CONSTRUCTION CORP07/28/1992
BIS—ISSUEDM.R.L.S. CONSTRUCTION CORP04/02/1992
1 project · most recent 11/27/2024
FiledStatusContractorScope
11/27/2024CancelledREDLINE ELECTRIC INC—
1 project · most recent 12/04/2024
FiledStatusContractorScope
12/04/2024Permit IssuedTRINITY SOLAR LLC16 panels, 6.56 kw, 646 roof_area_sqft
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
12/02/2024Fire-Resistant Penetrations and JointsKAMRUL AHSANspecial
12/02/2024Structural Stability – Alterations of existing buildingsKAMRUL AHSANspecial
12/02/2024Energy Code Compliance InspectionsAyracon Almarazprogress
12/02/2024FinalAyracon Almarazprogress
12/02/2024Air barrier - visual inspectionAyracon Almarazenergy_progress
▾Documents — 7 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/20/2026X01149674-I1Request digital key ↗
▸Seals & Professional Certifications5
▸DOB NOWProgress Inspector Seal & Signature3
08/28/2026X01149674-I1Open ↗
08/28/2026X01149674-I1Open ↗
08/28/2026X01149674-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026X01149674-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/28/2026X01149674-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026X01149674-I1Open ↗