← Back
Gas station with retail store
860 FLUSHING AVENUE
BROOKLYN · BIN 3071820
💬 Discuss this project
1931Year Built
1Stories
G3Building Class
R6AZoning
—Gross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Gas station with retail store · Owner of record: 456 BUSHWICK, LLC · 0.15 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionCivil
Permit Issued — active, not yet Signed-off
RoofUnder Construction32p · 6 filings · 20 docs
Floor 8Under Construction36p · 3 filings · 20 docs
Floor 7Under Construction30p · 3 filings · 20 docs
Floor 6Under Construction40p · 3 filings · 20 docs
Floor 5Under Construction37p · 4 filings · 20 docs
Floor 4Under Construction37p · 4 filings · 20 docs
Floor 3Under Construction37p · 3 filings · 20 docs
Floor 2Under Construction29p · 3 filings · 20 docs
Floor 1Under Construction36p · 3 filings · 20 docs
CellarUnder Construction42p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
OWNERS REP709/18/2026
456 BUSHWICK, LLC303/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EXPRESS FILING INC1903/21/2026
ZV Drafting103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
B CONTRACTORS GROUP LLCGeneral Contractor709/19/2026
CORE SCAFFOLD SYSTEMS INC.General Contractor609/18/2026
N TECH DESIGN OF AMERICAGeneral Contractor404/09/2026
METFLOW FIRE CONTROL LLCFire Protection309/16/2026
CREATIVE PLUMBING INPlumbing107/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
REGIONAL TESTING CORP.3941207/24/2026
ADROIT ENGINEERING PLLC8885106/09/2025
Building Lifecycle
All (120)Filed (20)Permit Issued (22)Signed Off (1)Violation (2)Inspection (5)Objection (40)Special Inspection (30)
09/18/2026
Permit issued — Construction Fence
B01204032-S1-FN
09/17/2026
Permit issued — Protection and Mechanical Methods
B01447428-I1-PMM
09/15/2026
Permit issued — Standpipe
B01204032-S8-EW-SD
09/15/2026
Permit issued — Standpipe
B01204032-S8-EW-SP
09/14/2026
Permit issued — Protection and Mechanical Methods
B01459070-I1-PMM
09/14/2026
Permit issued — Supported Scaffold
B01459069-I1-SF
09/03/2026
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
09/01/2026
Permit issued — Protection and Mechanical Methods
B01453653-I1-PMM
09/01/2026
Permit issued — Sidewalk Shed
B01451840-I1-SH
08/28/2026
Permit issued — Protection and Mechanical Methods
B01451856-I1-PMM
08/27/2026
Permit issued — Protection and Mechanical Methods
B01451850-I1-PMM
08/19/2026
Special inspection requirement — Structural Steel - Welding
Paul Raymond
08/19/2026
Special inspection requirement — Subgrade Inspections
Paul Raymond
08/19/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
Paul Raymond
08/19/2026
Special inspection requirement — Structural Steel - Details
Paul Raymond
08/19/2026
Special inspection requirement — Post-installed Anchors
Paul Raymond
08/19/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
Paul Raymond
08/18/2026
Filed — Alteration
INSTALLATION OF TEMPORARY NEEDLE BEAM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01447428-I1
07/24/2026
Filed — New Building
please assign to dev hub. PROPOSING NEW 8 STORY MIXED-USE BUILDING.
B01204032-P3
07/20/2026
Permit issued — Standpipe
B01204032-S7-EW-SD
07/20/2026
Permit issued — Plumbing
B01204032-S9-PL
07/15/2026
Filed — New Building
please assign to dev hub. PROPOSING NEW 8 STORY MIXED-USE BUILDING.
B01204032-P6
07/15/2026
Permit issued — Construction Fence
B01257410-I1-FN
07/14/2026
Special inspection requirement — Final
Paul Raymond
07/14/2026
Special inspection requirement — Concrete - Cast-In-Place
Paul Raymond
07/09/2026
Objection raised — Other
07/06/2026
Special inspection requirement — Subgrade Inspections
Paul Raymond
07/06/2026
Special inspection requirement — Concrete - Cast-In-Place
Paul Raymond
07/06/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
Paul Raymond
07/06/2026
Special inspection requirement — Footing and Foundation
Paul Raymond
07/06/2026
Special inspection requirement — Deep Foundation Elements
07/06/2026
Special inspection requirement — Final
Paul Raymond
06/30/2026
Filed — New Building
please assign to dev hub. PROPOSING NEW 8 STORY MIXED-USE BUILDING.
B01204032-P4
06/25/2026
Filed — New Building
please assign to dev hub. PROPOSING NEW 8 STORY MIXED-USE BUILDING.
B01204032-Z1
06/25/2026
Special inspection requirement — Interior lighting power
Paul Raymond
06/25/2026
Special inspection requirement — Maintenance information
Paul Raymond
06/25/2026
Special inspection requirement — Air barrier — testing
Paul Raymond
06/25/2026
Special inspection requirement — Lighting in dwelling units
Paul Raymond
06/25/2026
Special inspection requirement — Fenestration areas
Paul Raymond
06/25/2026
Special inspection requirement — Lighting controls
Paul Raymond
06/25/2026
Special inspection requirement — Electrical motors and elevators
Paul Raymond
06/25/2026
Special inspection requirement — Fire-Resistance Rated Construction
Paul Raymond
06/25/2026
Special inspection requirement — Energy Code Compliance Inspections
Paul Raymond
06/25/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Paul Raymond
06/25/2026
Special inspection requirement — Air barrier - visual inspection
Paul Raymond
06/25/2026
Special inspection requirement — Insulation placement and R values
Paul Raymond
06/25/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Paul Raymond
06/25/2026
Special inspection requirement — Fenestration air leakage
Paul Raymond
06/25/2026
Special inspection requirement — Exterior lighting power
Paul Raymond
06/25/2026
Special inspection requirement — Air barrier continuity plan testing
Paul Raymond
06/23/2026
Filed — New Building
please assign to dev hub. PROPOSING NEW 8 STORY MIXED-USE BUILDING.
B01204032-P5
06/03/2026
Permit issued — Earth Work
B01204032-S3-FO-EA
06/03/2026
Permit issued — Structural
B01204032-S2-ST
06/02/2026
Permit issued — Support of Excavation
B01204032-S4-SE
06/02/2026
Permit issued — General Construction
B01204032-I1-GC
05/07/2026
Permit issued — Construction Fence
B01204032-S1-FN
03/19/2026
Objection resolved — Addressed
03/10/2026
Objection raised — Other
03/05/2026
Objection resolved — Addressed
03/02/2026
Objection resolved — Addressed
Latest 60 of 120 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FencePermit IssuedB CONTRACTORS GROUP LLC09/18/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedCORE SCAFFOLD SYSTEMS INC.09/17/2026
DOB NOWStandpipePermit IssuedMETFLOW FIRE CONTROL LLC09/15/2026
DOB NOWStandpipePermit IssuedMETFLOW FIRE CONTROL LLC09/15/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedCORE SCAFFOLD SYSTEMS INC.09/14/2026
DOB NOWSupported ScaffoldPermit IssuedCORE SCAFFOLD SYSTEMS INC.09/14/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedCORE SCAFFOLD SYSTEMS INC.09/01/2026
DOB NOWSidewalk ShedPermit IssuedCORE SCAFFOLD SYSTEMS INC.09/01/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedCORE SCAFFOLD SYSTEMS INC.08/28/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedCORE SCAFFOLD SYSTEMS INC.08/27/2026
DOB NOWStandpipePermit IssuedMETFLOW FIRE CONTROL LLC07/20/2026
DOB NOWPlumbingPermit IssuedCREATIVE PLUMBING IN07/20/2026
DOB NOWConstruction FencePermit IssuedB CONTRACTORS GROUP LLC07/15/2026
DOB NOWEarth WorkPermit IssuedB CONTRACTORS GROUP LLC06/03/2026
DOB NOWStructuralPermit IssuedB CONTRACTORS GROUP LLC06/03/2026
DOB NOWSupport of ExcavationPermit IssuedB CONTRACTORS GROUP LLC06/02/2026
DOB NOWGeneral ConstructionPermit IssuedB CONTRACTORS GROUP LLC06/02/2026
DOB NOWConstruction FencePermit IssuedB CONTRACTORS GROUP LLC05/07/2026
DOB NOWFull DemolitionSigned-offN TECH DESIGN OF AMERICA08/28/2025
DOB NOWProtection and Mechanical MethodsSigned-offN TECH DESIGN OF AMERICA08/27/2025
DOB NOWConstruction FencePermit IssuedN TECH DESIGN OF AMERICA08/20/2025
DOB NOWConstruction FencePermit IssuedN TECH DESIGN OF AMERICA07/07/2025
BISPLISSUEDMISA PLUMBING, LLC10/03/2007
BISPLISSUEDMISA PLUMBING, LLC10/03/2007
BISOTISSUEDP S I TOTAL FACILITY INC03/12/2004
BISOTISSUEDBEST SIGNS/SIGN WORLD INC09/21/1998
BIS—ISSUEDBEST SIGNS/SIGNWORLD INC09/21/1998
BIS—ISSUEDSIGN WORLD INC T/A BEST SIGN CO09/14/1998
BIS—ISSUEDSIGN WORLD INC T/A BEST SIGN CO09/14/1998
BIS—ISSUEDSIGN WORLD INC T/A BEST SIGN CO09/14/1998
BISPLISSUEDCATMAN PLUMBING INC08/06/1998
BIS—ISSUEDBROWN AND DAVIS EXCAVATORS06/19/1998
BIS—ISSUEDLARRY E TRYREE CO04/09/1998
BISEQISSUEDLARRY E TRYREE CO04/09/1998
BISOTISSUEDLARRY E TRYEE CO03/31/1998
BISOTISSUEDLARRY E TYREE03/30/1998
BISOTISSUEDLARRY E TYREE CO03/30/1998
BISCCISSUEDLARRY E TYREE CO03/27/1998
BISCCISSUEDLARRY E TYREE CO03/27/1998
BISFPISSUEDFIRE GUARD OF LONG ISLAND03/27/1998
1 project · most recent 07/24/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
07/24/2026Permit IssuedB CONTRACTORS GROUP LLCHeating and Air Conditioning Systems
Heat / Cool
Daikin RXTQ36TBVJUB 37,000 BTU · Vrf Outdoor ×23
RXTQ48TBVJUB 49,500 BTU · Vrf Outdoor ×13
RXF18AXVJU 21,600 BTU · Heat Pump Outdoor ×1
RZQ24TBVJU 27,400 BTU · Heat Pump Outdoor ×1
— RXSQ24TBVJUB 25,800 BTU · Heat Pump Outdoor ×23
1 project · most recent 07/24/2026
Sprinkler System
FiledStatusContractorScope
07/24/2026Permit IssuedMETFLOW FIRE CONTROL LLCSprinkler System
1 project · most recent 07/24/2026
Storm Water/Sanitary
FiledStatusContractorScope
07/24/2026Permit IssuedMETFLOW MECHANICAL LLCStorm, Water/Sanitary
4 projects · most recent 09/15/2026
General Wiring
FiledStatusContractorScope
09/15/2026Permit IssuedSOLAS ELECTRICAL CORP—
08/27/2026Permit IssuedSOLAS ELECTRICAL CORP—
08/11/2026Permit IssuedPOWER DIRECT ELECTRIC INCGeneral Wiring
12/08/2025Permit IssuedHIVOLTS ELECTRICAL INCGeneral Wiring
1 project · most recent 07/24/2026
Concrete
FiledStatusContractorScope
07/24/2026Permit IssuedB CONTRACTORS GROUP LLCConcrete
2 projects · most recent 07/24/2026
Fence
FiledStatusContractorScope
07/24/2026Permit IssuedB CONTRACTORS GROUP LLCFence
07/22/2025Permit IssuedB CONTRACTORS GROUP LLCFence
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
09/03/2026Pass-Final PL - UndergroundPassView ↗
09/03/2025Certified StandPipe - SD - Alarm Sys 64/09 - FinishCertifiedView ↗
09/03/2025Certified StandPipe - SD - Hydrostatic 63/09 Test (100 Foot Increments)CertifiedView ↗
07/12/2025Certified StandPipe - SD - Alarm Sys 64/09 - FinishCertifiedView ↗
07/12/2025Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 77
DateRequirementInspectorRole
08/19/2026Subgrade InspectionsPaul Raymondspecial
08/19/2026Post-installed AnchorsPaul Raymondspecial
08/19/2026Structural Steel - WeldingPaul Raymondspecial
08/19/2026Structural Steel - DetailsPaul Raymondspecial
08/19/2026Subsurface Conditions – Fill Placement & In-Place DensityPaul Raymondspecial
08/19/2026Excavations - Sheeting, Shoring, and BracingPaul Raymondspecial
07/14/2026Concrete - Cast-In-PlacePaul Raymondspecial
07/14/2026FinalPaul Raymondprogress
07/06/2026FinalPaul Raymondprogress
07/06/2026Subgrade InspectionsPaul Raymondspecial
07/06/2026Concrete - Cast-In-PlacePaul Raymondspecial
07/06/2026Subsurface Conditions – Fill Placement & In-Place DensityPaul Raymondspecial
07/06/2026Deep Foundation Elements—special
07/06/2026Footing and FoundationPaul Raymondprogress
06/25/2026Maintenance informationPaul Raymondenergy_progress
06/25/2026Exterior lighting powerPaul Raymondenergy_progress
06/25/2026MeteringPaul Raymondenergy_progress
06/25/2026Protection of exposed foundation insulationPaul Raymondenergy_progress
06/25/2026Air barrier continuity plan testingPaul Raymondenergy_progress
06/25/2026Fenestration air leakagePaul Raymondenergy_progress
06/25/2026Air barrier - visual inspectionPaul Raymondenergy_progress
06/25/2026Fire-Resistant Penetrations and JointsPaul Raymondspecial
06/25/2026Energy Code Compliance InspectionsPaul Raymondprogress
06/25/2026Fire-Resistance Rated ConstructionPaul Raymondprogress
06/25/2026Lighting controlsPaul Raymondenergy_progress
Latest 25 of 77.
▾Documents — 92 on file (BIS + DOB NOW)
▸Plans & Drawings20
▸DOB NOWPlans/Sketch20
08/21/2026B01224397-I1Request digital key ↗
08/21/2026B01224397-S1Request digital key ↗
08/21/2026B01257410-I1Request digital key ↗
Showing 3 of 20 on file for this type
▸Zoning, Tax Lot & Property Records5
▸DOB NOWZD1: DOB Zoning Diagram2
08/20/2026B01204032-P6Open ↗
08/14/2026B01204032-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/20/2026B01204032-P6Open ↗
08/14/2026B01204032-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/14/2026B01204032-I1Open ↗
▸Seals & Professional Certifications39
▸DOB NOWDPL-1: Design Professional Seal & Signature20
08/21/2026B01257410-I1Open ↗
08/20/2026B01204032-P4Open ↗
08/20/2026B01204032-P3Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
09/01/2026B01204032-P6Open ↗
09/01/2026B01224397-I1Open ↗
09/01/2026B01224397-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
09/01/2026B01204032-P6Open ↗
09/01/2026B01204032-P6Open ↗
08/25/2026B01204032-S2Open ↗
Showing 3 of 9 on file for this type
▸Trade Schedules & Equipment6
▸DOB NOWStandpipe Alarms Drawings1
08/14/2026B01204032-I1—
▸DOB NOWElectric Cut-Off1
08/13/2026B01224397-I1Open ↗
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/14/2026B01204032-I1Open ↗
▸DOB NOWWater Cut-Off1
08/13/2026B01224397-I1Open ↗
▸DOB NOWSewer Cut-Off1
08/13/2026B01224397-I1Open ↗
▸DOB NOWGas Cut-Off1
08/13/2026B01224397-I1Open ↗
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist2
08/20/2026B01204032-P6Open ↗
08/14/2026B01204032-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/14/2026B01204032-I1Open ↗
▸Environmental & Asbestos7
▸DOB NOWOER: Notice to Proceed5
08/20/2026B01204032-S2Open ↗
08/15/2026B01204032-S4Open ↗
08/14/2026B01204032-S9Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWRodent Control1
08/13/2026B01224397-I1Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026B01224397-I1Open ↗
▸Other Documents12
▸DOB NOWProperty Ownership Certification3
08/20/2026B01204032-P6Open ↗
08/14/2026B01204032-I1Open ↗
08/13/2026B01224397-I1Open ↗
▸DOB NOWSite Survey: Initial2
08/20/2026B01204032-P6Open ↗
08/14/2026B01204032-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/20/2026B01204032-P6Open ↗
08/14/2026B01204032-I1Open ↗
▸DOB NOWAdjoining Owners Notification2
08/15/2026B01204032-S4Open ↗
08/14/2026B01204032-S3Open ↗
▸DOB NOWFull Demo: 10-Day Notice1
08/13/2026B01224397-I1Open ↗
▸DOB NOWCommunity Board Notification1
08/13/2026B01224397-I1Open ↗
▸DOB NOWStructure Photographs1
08/13/2026B01224397-I1Open ↗