← Back
BuildNYC
Over six families without stores
Casella Houses II
861 CROTONA PARK NORTH · BIN 2010092
💬 Discuss this project
1924Year Built
6Stories
C1Building Class
R7-1Zoning
22,300 sfGross Floor Area
16Units
Rent Stabilized26 Active Violations 20 unresolved · 6 paperwork only 2 likely answered ▸
Over six families without stores · Owner of record: Casella Houses HDFC · 5,758 sf lot · 3.87 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofCarroll-burke Housing Hdfc Plp FY21 Rehab15p · 1 filing · 20 docs
Floor 6Carroll-burke Housing Hdfc Plp FY21 Rehab12p · 1 filing · 20 docs
Floor 5Carroll-burke Housing Hdfc Plp FY21 Rehab15p · 1 filing · 20 docs
Floor 4Carroll-burke Housing Hdfc Plp FY21 Rehab12p · 1 filing · 20 docs
Floor 3Carroll-burke Housing Hdfc Plp FY21 Rehab12p · 1 filing · 20 docs
Floor 2Carroll-burke Housing Hdfc Plp FY21 Rehab12p · 1 filing · 20 docs
Floor 1Carroll-burke Housing Hdfc Plp FY21 Rehab12p · 1 filing · 20 docs
CellarCARROLL-BURKE HOUSING HDFC boiler rehab18p · 2 filings · 20 docs
Site & exteriorLighting7p · 3 filings · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Aquinas Housing203/21/2026
Carroll Burke Development103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Ocv Architects1305/11/2023
Joel Phagoo P.E.205/02/2022
Dooling & Company Architects112/03/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Ocv Architects1303/21/2026
A1 Expediting Service403/21/2026
AE Design Solution203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Akm Construction NYScaffold707/08/2026
Notias ConstructionGeneral Contractor507/08/2026
Spring ScaffoldingScaffold507/08/2026
United One MechanicalPlumbing207/08/2026
J-J PlumbingPlumbing207/08/2026
Power Surge ElectricElectrical203/21/2026
Nash Electric ServicesElectrical103/22/2026
Accord PowerGeneral Contractor109/28/2023
Spring ScaffoldingGeneral Contractor209/10/2018
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Certified Testing Laborat3961004/20/2023
Building Lifecycle
11/02/2026
Boiler inspection report filed
Initial · no defects · Accepted
12/10/2025
§ 27-2033 ADM code provide ready access to buildings heating system door locked at boiler room
HPD violation · closed
12/10/2025
§ 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 1C, 1st STORY, 1st APARTMENT FROM…
HPD violation · closed
12/05/2025
§ 27-2005 ADM CODE REPLACE WITH NEW THE MISSING COVER AT ELECTRICAL OUTLET AT SOUTH WALL IN THE 3rd ROOM FROM EAST LOCATED AT APT 5A UPPER LEVEL,…
HPD violation · closed
12/05/2025
§ 27-2005 ADM CODE REPLACE WITH NEW THE MISSING COVER AT ELECTRICAL OUTLET AT WEST WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 5A UPPER LEVEL,…
HPD violation · closed
292 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedSigned-offAkm Construction NY10/02/2023
DOB NOWProtection and Mechanical MethodsSigned-offAkm Construction NY06/20/2023
DOB NOWBoiler EquipmentSigned-offJ-J Plumbing04/11/2023
DOB NOWPlumbingSigned-offLogo Plumbing and Mechanical03/16/2023
DOB NOWBoiler EquipmentSigned-offJ-J Plumbing01/24/2023
DOB NOWGeneral ConstructionSigned-offNotias Construction12/22/2022
DOB NOWSidewalk ShedSigned-offAkm Construction NY05/05/2022
DOB NOWProtection and Mechanical MethodsSigned-offAkm Construction NY05/04/2022
DOB NOWPlumbingSigned-offLogo Plumbing and Mechanical03/14/2022
DOB NOWSidewalk ShedSigned-offSpring Scaffolding03/01/2022
DOB NOWGeneral ConstructionSigned-offNotias Construction01/14/2022
DOB NOWGeneral ConstructionSigned-offNotias Construction11/08/2021
DOB NOWSidewalk ShedSigned-offSpring Scaffolding03/03/2021
DOB NOWSidewalk ShedSigned-offSpring Scaffolding12/04/2019
BISOTISSUEDAccord Power09/28/2023
BISEQISSUEDSpring Scaffolding09/10/2018
BISEQISSUEDSpring Scaffolding09/21/2017
4 projects · most recent 10/08/2023
General Wiring
FiledStatusContractorScope
10/08/2023CompletePower Surge Electric—
10/27/2022Permit IssuedHigh Quality Electric—
04/18/2022Permit IssuedQueue Electrical ContractorsGeneral Wiring
04/08/2022CompleteNash Electric Services—
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
05/12/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/08/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/05/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/02/2023Pass-Final Boiler Equipment InspectionPassView ↗
02/14/2023Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 43
DateRequirementInspectorRole
04/27/2023Fire-Resistant Penetrations and JointsKIRT DOBBINSspecial
04/27/2023Heating SystemsKIRT DOBBINSspecial
04/27/2023Tenant Protection Plan ComplianceKIRT DOBBINSspecial
04/27/2023Fuel-Oil Storage and Fuel-Oil Piping SystemsVladimir Sirotaspecial
04/20/2023Tenant Protection Plan Compliance—special
04/20/2023Heating SystemsKIRT DOBBINSspecial
04/20/2023Fuel-Oil Storage and Fuel-Oil Piping SystemsKIRT DOBBINSspecial
04/20/2023Fire-Resistant Penetrations and JointsKIRT DOBBINSspecial
02/24/2023Fuel-Oil Storage and Fuel-Oil Piping SystemsVladimir Sirotaspecial
02/24/2023Fire-Resistant Penetrations and JointsKIRT DOBBINSspecial
02/24/2023Heating SystemsKIRT DOBBINSspecial
02/21/2023Fire-Resistant Penetrations and JointsKIRT DOBBINSspecial
02/21/2023Fuel-Oil Storage and Fuel-Oil Piping SystemsKIRT DOBBINSspecial
02/21/2023Heating SystemsKIRT DOBBINSspecial
02/02/2023Fire-Resistant Penetrations and JointsKIRT DOBBINSspecial
02/02/2023Fuel-Oil Storage and Fuel-Oil Piping SystemsKIRT DOBBINSspecial
02/02/2023Heating SystemsKIRT DOBBINSspecial
07/28/2022Air barrier - visual inspectionKIRT DOBBINSenergy_progress
07/28/2022Interior lighting powerKIRT DOBBINSenergy_progress
07/28/2022Fenestration areasKIRT DOBBINSenergy_progress
07/28/2022Fenestration air leakageKIRT DOBBINSenergy_progress
07/28/2022Structural Stability – Alterations of existing buildingsKIRT DOBBINSspecial
07/28/2022Fire-Resistant Penetrations and JointsKIRT DOBBINSspecial
07/28/2022Fire-Resistance Rated ConstructionKIRT DOBBINSprogress
07/28/2022Energy Code Compliance InspectionsKIRT DOBBINSprogress
Latest 25 of 43.
179 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account