Walk-up apt, over six families with stores
861 PARK AVENUE
BROOKLYN · BIN 3042827
💬 Discuss this project
1931Year Built
2Stories
C7Building Class
C4-4LZoning
19,125 sfGross Floor Area
9Units
11 Active Violations ▸FDNY Report ↗
Walk-up apt, over six families with stores · Owner of record: Myrtle 6 · 10,000 sf lot · 1.91 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentLandscapeCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Whole building & multi-floor projectsPark AvenueUnder Construction1 filing
Roofl Realty CapitalUnder Construction3p · 2 filings · 19 docs
Floor 1l Realty Capital2p · 1 filing
Site & exteriorl Realty CapitalUnder Construction2 filings · 19 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
l Realty Capital1409/01/2026
Myrtle 6903/22/2026
Pyramid Builders NY203/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Paul G. Jones, P.E1110/13/2026
Structural Engineering Technologies906/03/2026
Jfa Architects & Engineers703/10/2025
Adroit Engineering303/20/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Speedy Expediting3003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Consolidated ScaffoldingScaffold1008/27/2026
Builders Source USAGeneral Contractor1007/08/2026
Prime Piping & HeatingFire Protection308/30/2026
Hexagon IndustriesScaffold307/08/2026
Quality PipingFire Protection207/08/2026
M.R. Electrical ServiceElectrical203/22/2026
Hexagon IndustriesGeneral Contractor207/08/2026
Builders Source USAScaffold104/09/2026
N Tech Design of AmericaGeneral Contractor104/09/2026
N Tech Design of AmericaScaffold104/09/2026
Ness Mechanical P & HPlumbing107/08/2026
Prime Piping & HeatingPlumbing108/26/2026
Absolute Electrical Contracting ofElectrical103/21/2026
Jay Helfgott ElectricElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF Services56161506/03/2026
Adroit Engineering8885108/25/2023
Building Lifecycle
All (177)Filed (30)Permit Issued (29)Signed Off (1)Violation (32)Inspection (4)Objection (48)Special Inspection (30)Tax Incentive (3)
01/01/2027
485-x construction completed
10/20/2026
Objection resolved — Resolved
10/16/2026
Objection raised — Other
10/13/2026
Filed — Alteration
INSTALLATION OF A TEMPORARY NEEDLE BEAM SCAFFOLD AS PER PLANS DURING NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. NEEDLE BEAM SCAFFOLD TO COMPLY WITH 2022 NYC BUILDING CODE, CHAPTER 33.
B01277767-P7
10/08/2026
Violation issued (ECB, open)
Construction
09/29/2026
Filed — Alteration
INSTALLATION OF A TEMPORARY NEEDLE BEAM SCAFFOLD AS PER PLANS DURING NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. NEEDLE BEAM SCAFFOLD TO COMPLY WITH 2022 NYC BUILDING CODE, CHAPTER 33.
B01277767-P6
09/22/2026
Objection resolved — Resolved
09/18/2026
Objection raised — Other
09/10/2026
Violation issued (ECB, open)
Construction
09/10/2026
Violation issued (ECB, open)
Construction
09/10/2026
Violation issued (ECB, open)
Construction
08/28/2026
Filed — Alteration
INSTALLATION OF A TEMPORARY NEEDLE BEAM SCAFFOLD AS PER PLANS DURING NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. NEEDLE BEAM SCAFFOLD TO COMPLY WITH 2022 NYC BUILDING CODE, CHAPTER 33.
B01277767-P5
08/27/2026
Permit issued — Standpipe
B00898115-S7-EW-SD
08/26/2026
Permit issued — Protection and Mechanical Methods
B01277767-S4-PMM
08/25/2026
Permit issued — Sprinklers
B00898115-S6-EW-SP
08/25/2026
Permit issued — Plumbing
B00898115-S5-PL
08/25/2026
Permit issued — Sprinklers
B00898115-S6-EW-SD
08/24/2026
Violation issued (ECB, open)
Unknown
08/20/2026
Filed — Alteration
INSTALLATION OF A TEMPORARY NEEDLE BEAM SCAFFOLD AS PER PLANS DURING NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. NEEDLE BEAM SCAFFOLD TO COMPLY WITH 2022 NYC BUILDING CODE, CHAPTER 33.
B01277767-P3
08/20/2026
Filed — Alteration
INSTALLATION OF A TEMPORARY NEEDLE BEAM SCAFFOLD AS PER PLANS DURING NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. NEEDLE BEAM SCAFFOLD TO COMPLY WITH 2022 NYC BUILDING CODE, CHAPTER 33.
B01277767-P4
08/19/2026
Violation issued (ECB, open)
Construction
08/17/2026
Permit issued — Supported Scaffold
B01277767-S3-SF
08/13/2026
Permit issued — Protection and Mechanical Methods
B01277767-S1-PMM
08/13/2026
Permit issued — Sidewalk Shed
B01277767-I1-SH
08/13/2026
Violation issued (ECB, closed)
Unknown
08/13/2026
Violation issued (ECB, closed)
Unknown
08/10/2026
Objection resolved — Resolved
08/04/2026
Objection resolved — Resolved
08/04/2026
Objection resolved — Resolved
08/04/2026
Objection resolved — Resolved
08/03/2026
Objection raised — Other
07/30/2026
Violation issued (ECB, open)
Construction
07/30/2026
Violation issued (ECB, open)
Construction
07/30/2026
Violation issued (ECB, open)
Unknown
07/30/2026
Violation issued (ECB, closed)
Unknown
07/30/2026
Objection raised — Other
07/30/2026
Objection raised — Other
07/30/2026
Objection raised — Other
07/20/2026
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
07/17/2026
Filed — Alteration
INSTALLATION OF A TEMPORARY NEEDLE BEAM SCAFFOLD AS PER PLANS DURING NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. NEEDLE BEAM SCAFFOLD TO COMPLY WITH 2022 NYC BUILDING CODE, CHAPTER 33.
B01277767-S4
07/16/2026
Filed — Alteration
INSTALLATION OF A TEMPORARY NEEDLE BEAM SCAFFOLD AS PER PLANS DURING NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. NEEDLE BEAM SCAFFOLD TO COMPLY WITH 2022 NYC BUILDING CODE, CHAPTER 33.
B01277767-P2
07/16/2026
Filed — Alteration
INSTALLATION OF A TEMPORARY NEEDLE BEAM SCAFFOLD AS PER PLANS DURING NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. NEEDLE BEAM SCAFFOLD TO COMPLY WITH 2022 NYC BUILDING CODE, CHAPTER 33.
B01277767-S3
07/10/2026
Inspection — Fail-Final PL - Underground
Fail
View inspection ↗
07/09/2026
Violation issued (ECB, open)
Construction
07/09/2026
Violation issued (ECB, closed)
Unknown
07/09/2026
Violation issued (ECB, closed)
Unknown
06/18/2026
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
06/11/2026
Special inspection requirement — Structural Steel - Welding
FAHAD FATEH
06/11/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
FAHAD FATEH
06/11/2026
Special inspection requirement — Concrete - Cast-In-Place
FAHAD FATEH
06/11/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
FAHAD FATEH
06/11/2026
Special inspection requirement — Subgrade Inspections
FAHAD FATEH
06/11/2026
Special inspection requirement — Post-installed Anchors
FAHAD FATEH
06/10/2026
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
06/03/2026
Filed — New Building
SOE filed in conjunction with NB GC # B00898115-I1
B00898115-P6
06/01/2026
Special inspection requirement — Subgrade Inspections
FAHAD FATEH
06/01/2026
Special inspection requirement — Post-installed Anchors
FAHAD FATEH
06/01/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
FAHAD FATEH
06/01/2026
Special inspection requirement — Concrete - Cast-In-Place
FAHAD FATEH
06/01/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
FAHAD FATEH
Latest 60 of 177 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStandpipePermit IssuedPrime Piping & Heating08/27/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedConsolidated Scaffolding08/26/2026
DOB NOWSprinklersPermit IssuedPrime Piping & Heating08/25/2026
DOB NOWPlumbingPermit IssuedPrime Piping & Heating08/25/2026
DOB NOWStandpipePermit IssuedPrime Piping & Heating08/25/2026
DOB NOWSupported ScaffoldPermit IssuedConsolidated Scaffolding08/17/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedConsolidated Scaffolding08/13/2026
DOB NOWSidewalk ShedPermit IssuedConsolidated Scaffolding08/13/2026
DOB NOWPlumbingPermit IssuedNess Mechanical P & H05/27/2026
DOB NOWSprinklersPermit IssuedQuality Piping05/20/2026
DOB NOWStandpipePermit IssuedQuality Piping05/20/2026
DOB NOWFoundationPermit IssuedBuilders Source USA03/06/2026
DOB NOWStructuralPermit IssuedBuilders Source USA03/06/2026
DOB NOWMechanical SystemsPermit IssuedBuilders Source USA02/19/2026
DOB NOWFull DemolitionSigned-offN Tech Design of America01/27/2026
DOB NOWProtection and Mechanical MethodsSigned-offN Tech Design of America01/21/2026
DOB NOWSupport of ExcavationPermit IssuedBuilders Source USA01/06/2026
DOB NOWFoundationPermit IssuedBuilders Source USA01/05/2026
DOB NOWGeneral ConstructionPermit IssuedBuilders Source USA12/26/2025
DOB NOWProtection and Mechanical MethodsSigned-offHexagon Industries12/08/2025
DOB NOWConstruction FencePermit IssuedBuilders Source USA12/08/2025
DOB NOWFull DemolitionSigned-offHexagon Industries09/22/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedConsolidated Scaffolding08/28/2025
DOB NOWSidewalk ShedPermit IssuedConsolidated Scaffolding08/27/2025
DOB NOWFoundationPermit IssuedBuilders Source USA02/03/2025
DOB NOWProtection and Mechanical MethodsSigned-offHexagon Industries12/17/2024
DOB NOWFull DemolitionSigned-offHexagon Industries12/13/2024
DOB NOWConstruction FencePermit IssuedHexagon Industries12/12/2024
DOB NOWSupport of ExcavationPermit IssuedBuilders Source USA11/26/2024
BISOTISSUEDB T General Builders06/15/2007
BISOTISSUEDCapitol Awning Co07/06/2005
BISOTISSUEDTri State Commercial Builders04/14/2005
BISMHISSUEDTri State Commercial Builders04/14/2005
BISOTISSUEDTri State Commercial Builders04/14/2005
BISPLISSUEDJoe Parziale Plumbing Co03/17/2005
BISMHISSUEDDonnelly Industries02/03/2005
BISOTISSUEDDonnelly Industries02/03/2005
BISOTISSUEDDonnelly Industries02/03/2005
3 projects · most recent 06/04/2026
General Wiring
FiledStatusContractorScope
06/04/2026Permit IssuedDenali Electric—
12/04/2025Permit IssuedM.R. Electrical ServiceGeneral Wiring
08/27/2025Permit IssuedSolas Electrical—
1 project · most recent 06/03/2026
Concrete
FiledStatusContractorScope
06/03/2026Permit IssuedPrime Piping & HeatingConcrete
2 projects · most recent 10/13/2026
Scaffold Sidewalk Shed Fence
FiledStatusContractorScope
10/13/2026Permit IssuedConsolidated ScaffoldingScaffold, Sidewalk Shed
03/20/2024Permit IssuedBuilders Source USAFence
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
07/20/2026Pass-Final PL - UndergroundPassView ↗
07/10/2026Fail-Final PL - UndergroundFailView ↗
06/18/2026Pass-Final PL - UndergroundPassView ↗
06/10/2026Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 103
DateRequirementInspectorRole
06/11/2026Concrete - Cast-In-PlaceFAHAD FATEHspecial
06/11/2026Subgrade InspectionsFAHAD FATEHspecial
06/11/2026Structural Steel - WeldingFAHAD FATEHspecial
06/11/2026Excavations - Sheeting, Shoring, and BracingFAHAD FATEHspecial
06/11/2026Post-installed AnchorsFAHAD FATEHspecial
06/11/2026Subsurface Conditions – Fill Placement & In-Place DensityFAHAD FATEHspecial
06/01/2026Excavations - Sheeting, Shoring, and BracingFAHAD FATEHspecial
06/01/2026Post-installed AnchorsFAHAD FATEHspecial
06/01/2026Structural Steel - WeldingFAHAD FATEHspecial
06/01/2026Subgrade InspectionsFAHAD FATEHspecial
06/01/2026Subsurface Conditions – Fill Placement & In-Place DensityFAHAD FATEHspecial
06/01/2026Concrete - Cast-In-PlaceFAHAD FATEHspecial
02/05/2026Concrete - Cast-In-PlaceFAHAD FATEHspecial
02/05/2026Post-installed AnchorsFAHAD FATEHspecial
02/05/2026Structural Steel - WeldingFAHAD FATEHspecial
02/05/2026Subgrade InspectionsFAHAD FATEHspecial
02/05/2026Subsurface Conditions – Fill Placement & In-Place DensityFAHAD FATEHspecial
02/05/2026Excavations - Sheeting, Shoring, and BracingFAHAD FATEHspecial
05/28/2025Maintenance informationFAHAD FATEHenergy_progress
05/28/2025Fenestration air leakageFAHAD FATEHenergy_progress
05/28/2025VestibulesFAHAD FATEHenergy_progress
05/28/2025Fenestration areasFAHAD FATEHenergy_progress
05/28/2025Interior lighting powerFAHAD FATEHenergy_progress
05/28/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
05/28/2025Luminous Exit Path MarkingsFAHAD FATEHspecial
Latest 25 of 103.
▾Documents — 124 on file (BIS + DOB NOW)
▸Plans & Drawings27
▸DOB NOWPlans/Sketch27
08/26/2026B00898115-S4Request digital key ↗
08/26/2026B00898115-S5Request digital key ↗
08/26/2026B00898115-S6Request digital key ↗
Showing 3 of 27 on file for this type
▸Applications & Permits1
▸BISBPP-5 - Authorization to the Department of Transportation1
01/05/2024340893787Open ↗
▸Zoning, Tax Lot & Property Records4
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026B00898115-P1Open ↗
08/13/2026B00898115-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/13/2026B00898115-P1Open ↗
08/13/2026B00898115-I1Open ↗
▸Seals & Professional Certifications59
▸DOB NOWDPL-1: Design Professional Seal & Signature29
10/15/2026B01277767-P7Open ↗
10/05/2026B01277767-P6Open ↗
08/26/2026B00898115-P2Open ↗
Showing 3 of 29 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature20
09/02/2026B00898115-I1Open ↗
09/02/2026B00898115-I1Open ↗
09/01/2026B00898115-S1Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
09/02/2026B00898115-I1Open ↗
09/02/2026B00898115-I1Open ↗
08/30/2026B00898115-S5Open ↗
Showing 3 of 9 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
01/05/2024340893787Open ↗
▸Trade Schedules & Equipment7
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/13/2026B00898115-P1Open ↗
08/13/2026B00898115-I1Open ↗
▸DOB NOWStandpipe Alarms Drawings1
08/15/2026B00898115-I1—
▸DOB NOWElectric Cut-Off1
08/13/2026B00905008-I1Open ↗
▸DOB NOWWater Cut-Off1
08/13/2026B00905008-I1Open ↗
▸DOB NOWSewer Cut-Off1
08/13/2026B00905008-I1Open ↗
▸DOB NOWGas Cut-Off1
08/13/2026B00905008-I1Open ↗
▸Safety & Tenant Protection5
▸DOB NOWStreet Tree Checklist2
08/15/2026B00898115-I1Open ↗
08/14/2026B00898115-P1Open ↗
▸BISBPP: STREET TREES SITE PLAN1
01/05/2024340893787Open ↗
▸BISSTREET TREE CHECKLIST1
01/05/2024340893787Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00898115-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWRodent Control1
08/13/2026B00905008-I1Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026B00905008-I1Open ↗
▸Approvals, Objections & Sign-offs2
▸BISLETTERS - SUPPORTING DOCUMENTATION2
01/05/2024340893787Open ↗
01/05/2024340893787Open ↗
▸Filing & Intake Forms2
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
01/05/2024340893787Open ↗
▸BISADDITIONAL INFORMATION1
01/05/2024340893787Open ↗
▸Other Documents15
▸BISBPP - SUPPORTING DOCUMENTATION3
01/05/2024340893787Open ↗
01/05/2024340893787Open ↗
01/05/2024340893787Open ↗
▸DOB NOWProperty Ownership Certification3
08/15/2026B00898115-I1Open ↗
08/14/2026B00898115-P1Open ↗
08/13/2026B00905008-I1Open ↗
▸DOB NOWSite Survey: Initial2
08/13/2026B00898115-P1Open ↗
08/13/2026B00898115-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026B00898115-P1Open ↗
08/13/2026B00898115-I1Open ↗
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
01/05/2024340893787Open ↗
▸DOB NOWStructure Photographs1
08/13/2026B00905008-I1Open ↗
▸DOB NOWFull Demo: 10-Day Notice1
08/13/2026B00905008-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026B00898115-S1Open ↗
▸DOB NOWCommunity Board Notification1
08/13/2026B00905008-I1Open ↗