8619 15 AVENUE
BROOKLYN · BIN 3166161
💬 Discuss this project
1930Year Built
2Stories
C0Building Class
R4Zoning
2,160 sfGross Floor Area
3Units
Rent Stabilized1 Open Violation ▸FDNY Report ↗
Three families · 2,312 sf lot · 0.93 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JOSE L. PENA,P.E.408/24/2021
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AGI SEWER & DRAINS, INCPlumbing807/08/2026
LSI GENERAL CONTRACTING CGeneral Contractor303/21/2026
TIMOTHY MCDONALDElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JOSE L. PENA, P.E5969408/24/2021
Building Lifecycle
All (50)Filed (4)Permit Issued (3)Signed Off (2)Violation (12)Objection (8)Special Inspection (21)
05/01/2026
Violation issued (HPD, closed)
A
06/06/2025
Violation issued (HPD, closed)
A
04/03/2024
Violation issued (HPD, closed)
A
11/21/2023
Violation issued (HPD, closed)
I
03/20/2023
Violation issued (HPD, closed)
A
02/18/2022
Violation issued (HPD, closed)
I
02/18/2022
Violation issued (HPD, closed)
A
08/26/2021
Signed off — Alteration
APPLICATION FOR 2 NEW AIR CONDITIONING SYSTEMS AT OSP
B00470304-I1
08/24/2021
Signed off — Alteration
New boiler & laundry area @ cellar, new 1/2 bath at the cellar, replace fixtures at existing bath at 1st fl. replace fixtures at the kitchen on 1st fl., (2) New gas lines : (1) for new boiler / 1st. floor stove and (1) for existing kitchen on 2nd floor.
B00415749-I1
08/24/2021
Filed — Alteration
APPLICATION FOR 2 NEW AIR CONDITIONING SYSTEMS AT OSP
B00470304-P1
08/04/2021
Special inspection requirement — Final
Jose Pena
08/04/2021
Special inspection requirement — Mechanical Systems
Jose Pena
08/04/2021
Special inspection requirement — Energy Code Compliance
Jose Pena
08/04/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
Jose Pena
08/04/2021
Special inspection requirement — HVAC-R and service water heating system controls
Jose Pena
08/04/2021
Special inspection requirement — Maintenance information
Jose Pena
08/04/2021
Special inspection requirement — HVAC-R and service water heating equipment
Jose Pena
04/06/2021
Violation issued (HPD, closed)
A
03/19/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jose Pena
03/19/2021
Special inspection requirement — Fire-Resistance Rated Construction
Jose Pena
03/19/2021
Special inspection requirement — Energy Code Compliance Inspections
Jose Pena
03/19/2021
Special inspection requirement — HVAC and service water heating equipment
Jose Pena
03/19/2021
Special inspection requirement — HVAC and service water heating system controls
Jose Pena
03/19/2021
Special inspection requirement — Maintenance information
Jose Pena
03/19/2021
Special inspection requirement — HVAC insulation and sealing
Jose Pena
03/15/2021
Permit issued — Mechanical Systems
B00470304-I1-MS
03/10/2021
Filed — Alteration
APPLICATION FOR 2 NEW AIR CONDITIONING SYSTEMS AT OSP
B00470304-I1
02/15/2021
Filed — Alteration
New boiler & laundry area @ cellar, new 1/2 bath at the cellar, replace fixtures at existing bath at 1st fl. replace fixtures at the kitchen on 1st fl., (2) New gas lines : (1) for new boiler / 1st. floor stove and (1) for existing kitchen on 2nd floor.
B00415749-P1
02/03/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jose Pena
02/03/2021
Special inspection requirement — Energy Code Compliance Inspections
Jose Pena
02/03/2021
Special inspection requirement — Fire-Resistance Rated Construction
Jose Pena
02/03/2021
Special inspection requirement — HVAC and service water heating equipment
Jose Pena
02/03/2021
Special inspection requirement — HVAC and service water heating system controls
Jose Pena
02/03/2021
Special inspection requirement — HVAC insulation and sealing
Jose Pena
02/03/2021
Special inspection requirement — Maintenance information
Jose Pena
01/07/2021
Permit issued — Plumbing
B00415749-I1-PL
12/09/2020
Permit issued — Plumbing
B00415749-I1-PL
11/18/2020
Objection raised — Other
11/18/2020
Objection resolved — Addressed
11/18/2020
Objection raised — Other
11/18/2020
Objection resolved — Addressed
11/18/2020
Objection raised — Scope
11/18/2020
Objection resolved — Addressed
11/18/2020
Objection raised — Energy
11/18/2020
Objection resolved — Addressed
11/15/2020
Filed — Alteration
New boiler & laundry area @ cellar, new 1/2 bath at the cellar, replace fixtures at existing bath at 1st fl. replace fixtures at the kitchen on 1st fl., (2) New gas lines : (1) for new boiler / 1st. floor stove and (1) for existing kitchen on 2nd floor.
B00415749-I1
10/28/2019
Violation issued (HPD, closed)
I
10/12/2018
Violation issued (HPD, closed)
I
11/01/2016
Violation issued (HPD, closed)
I
10/03/1989
Violation issued (HPD, open)
B
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offLSI GENERAL CONTRACTING C03/15/2021
DOB NOWPlumbingSigned-offAGI SEWER & DRAINS, INC01/07/2021
DOB NOWPlumbingSigned-offAGI SEWER & DRAINS, INC12/09/2020
BISOTISSUEDLSI GENERAL CONTRACTING C11/13/2020
1 project · most recent 07/14/2021
HVAC Wiring
FiledStatusContractorScope
07/14/2021CompleteMAC ELECT'L CONTR. INC.HVAC Wiring
▾Special Inspection Requirements (DOB NOW) — 21
DateRequirementInspectorRole
08/04/2021FinalJose Penaprogress
08/04/2021Mechanical SystemsJose Penaspecial
08/04/2021Energy Code ComplianceJose Penaprogress
08/04/2021HVAC-R and service water piping design and insulationJose Penaenergy_progress
08/04/2021HVAC-R and service water heating system controlsJose Penaenergy_progress
08/04/2021Maintenance informationJose Penaenergy_progress
08/04/2021HVAC-R and service water heating equipmentJose Penaenergy_progress
03/19/2021Fire-Resistant Penetrations and JointsJose Penaspecial
03/19/2021Fire-Resistance Rated ConstructionJose Penaprogress
03/19/2021Energy Code Compliance InspectionsJose Penaprogress
03/19/2021HVAC and service water heating equipment Jose Penaenergy_progress
03/19/2021HVAC and service water heating system controls Jose Penaenergy_progress
03/19/2021Maintenance informationJose Penaenergy_progress
03/19/2021HVAC insulation and sealing Jose Penaenergy_progress
02/03/2021Fire-Resistant Penetrations and JointsJose Penaspecial
02/03/2021Energy Code Compliance InspectionsJose Penaprogress
02/03/2021Fire-Resistance Rated ConstructionJose Penaprogress
02/03/2021HVAC and service water heating equipment Jose Penaenergy_progress
02/03/2021HVAC and service water heating system controls Jose Penaenergy_progress
02/03/2021HVAC insulation and sealing Jose Penaenergy_progress
02/03/2021Maintenance informationJose Penaenergy_progress
▾Documents — 54 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/01/2026B00470304-I1Request digital key ↗
09/01/2026B00470304-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing2
09/02/2026B00415749-P1Request digital key ↗
08/15/2026B00415749-I1Request digital key ↗
▸Applications & Permits4
▸BISPLAN / WORK APPROVAL APPLICATION2
08/05/2021340769341Open ↗
11/27/2020340769341Open ↗
▸BISWORK PERMIT APPLICATION1
11/13/2020340769341Open ↗
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
09/13/2021340769341Open ↗
▸Seals & Professional Certifications27
▸DOB NOWProgress Inspector Seal & Signature18
09/01/2026B00415749-I1Open ↗
09/01/2026B00415749-I1Open ↗
09/01/2026B00415749-I1Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
09/02/2026B00415749-I1Open ↗
09/02/2026B00415749-P1Open ↗
09/01/2026B00470304-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/01/2026B00415749-I1Open ↗
08/28/2026B00415749-P1Open ↗
08/27/2026B00470304-P1Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
11/13/2020340769341Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
11/13/2020340769341Open ↗
▸Safety & Tenant Protection3
▸DOB NOWTenant Protection Plan2
09/02/2026B00415749-P1Open ↗
08/15/2026B00415749-I1Open ↗
▸BISTenant Protection Plan and Notes1
11/27/2020340769341Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
09/02/2026B00415749-P1Open ↗
08/15/2026B00415749-I1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
11/13/2020340769341Open ↗
▸Energy Compliance4
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
08/27/2021340769341Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
08/27/2021340769341Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
11/13/2020340769341Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
09/01/2026B00470304-I1Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
08/27/2021340769341Open ↗
11/13/2020340769341Open ↗
▸Approvals, Objections & Sign-offs1
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
09/13/2021340769341Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT2
11/13/2020340769341Open ↗
11/13/2020340769341Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
09/01/2021340769341Open ↗
▸Filing & Intake Forms3
▸BISADDITIONAL INFORMATION2
09/09/2021340769341Open ↗
08/17/2021340769341Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
11/13/2020340769341Open ↗