← Back
One story - permanent living quarter
862 WILCOX AVENUE
BRONX · BIN 2078149
💬 Discuss this project
1950Year Built
1Stories
A2Building Class
R3AZoning
1,312 sfGross Floor Area
1Units
0 Open Violations
One story - permanent living quarter · 1,506 sf lot · 0.87 FAR built · Flood zone X500
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
RYTY203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GINO O. LONGO, ARCHITECT211/10/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BAY ELECTRICAL INCElectrical203/22/2026
DASILVA PLBG & HTG CORPPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
GINO O. LONGO ARCHITETCT331211/10/2023
Building Lifecycle
All (14)Filed (2)Permit Issued (2)Signed Off (2)Violation (1)Inspection (3)Objection (2)Special Inspection (2)
12/11/2023
Signed off — Alteration
PLUMBING APPLICATION HEREWITH FILED TO RESTORE GAS SERVICE TO GAS METER LOC. AT CEL. AND TO REPLACE GAS PIPING AS NECESSARY. NO CHANGE TO OCCUPANCY, USE, OR BULK. NO EXISTING BUILDING MATERIAL TO BE DISTURBED.
X00952178-S1
12/11/2023
Signed off — Alteration
PLUMBING APPLICATION HEREWITH FILED TO RESTORE GAS SERVICE TO GAS METER LOC. AT CEL. AND TO REPLACE GAS PIPING AS NECESSARY. NO CHANGE TO OCCUPANCY, USE, OR BULK. NO EXISTING BUILDING MATERIAL TO BE DISTURBED.
X00952178-I1
12/04/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/01/2023
Permit issued — Plumbing
X00952178-S1-PL
11/17/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/17/2023
Objection resolved — Addressed
11/15/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/14/2023
Objection raised — Scope
11/10/2023
Filed — Alteration
PLUMBING APPLICATION HEREWITH FILED TO RESTORE GAS SERVICE TO GAS METER LOC. AT CEL. AND TO REPLACE GAS PIPING AS NECESSARY. NO CHANGE TO OCCUPANCY, USE, OR BULK. NO EXISTING BUILDING MATERIAL TO BE DISTURBED.
X00952178-S1
11/08/2023
Permit issued — Plumbing
X00952178-I1-PL
11/03/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
GINO LONGO
10/27/2023
Filed — Alteration
PLUMBING APPLICATION HEREWITH FILED TO RESTORE GAS SERVICE TO GAS METER LOC. AT CEL. AND TO REPLACE GAS PIPING AS NECESSARY. NO CHANGE TO OCCUPANCY, USE, OR BULK. NO EXISTING BUILDING MATERIAL TO BE DISTURBED.
X00952178-I1
10/25/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
GINO LONGO
10/18/1994
Violation issued (DOB, closed)
VPW*-VIOLATION UNSERVED ECB-WORK WITHOUT PERMIT-DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offDASILVA PLBG & HTG CORP12/01/2023
DOB NOWPlumbingSigned-offDASILVA PLBG & HTG CORP11/08/2023
BIS—ISSUEDN/A08/12/1999
1 project · most recent 12/05/2025
General Wiring
FiledStatusContractorScope
12/05/2025CompleteBAY ELECTRICAL INCGeneral Wiring
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
12/04/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/17/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/15/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
11/03/2023Fire-Resistant Penetrations and JointsGINO LONGOspecial
10/25/2023Fire-Resistant Penetrations and JointsGINO LONGOspecial
▾Documents — 32 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/22/2026X00952178-S1Request digital key ↗
08/22/2026X00952178-I1Request digital key ↗
▸Applications & Permits14
▸BISPLAN / WORK APPROVAL APPLICATION12
10/09/2024200166328Open ↗
08/21/2024200166328Open ↗
08/20/2024200166328Open ↗
Showing 3 of 12 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION2
03/05/2024200166328Open ↗
03/05/2024200166328Open ↗
▸Zoning, Tax Lot & Property Records1
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
11/14/2025200166328Open ↗
▸Seals & Professional Certifications4
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/22/2026X00952178-S1Open ↗
08/22/2026X00952178-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/01/2026X00952178-I1Open ↗
08/27/2026X00952178-S1Open ↗
▸Approvals, Objections & Sign-offs3
▸BISSCHEDULE A - OCCUPANCY / USE3
08/21/2024200166328Open ↗
08/20/2024200166328Open ↗
06/06/2024200166328Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT (FINAL): PW31
02/26/2026200166328Open ↗
▸Filing & Intake Forms4
▸BISADDITIONAL INFORMATION4
01/06/2026200166328Open ↗
10/28/2024200166328Open ↗
10/28/2024200166328Open ↗
Showing 3 of 4 on file for this type
▸Other Documents3
▸BISADDITIONAL MICROFILM FEE DUE1
02/27/2026200166328Open ↗
▸BIS* VERIFY PW1 INFORMATION1
02/17/2026200166328Open ↗
▸BIS* DOT-ST. IMPROVEMENTS CONSTRUCTION1
01/06/2026200166328Open ↗