← Back
Three families
8620 20 AVENUE
BROOKLYN · BIN 3339797
💬 Discuss this project
1920Year Built
2.75Stories
C0Building Class
R5Zoning
3,075 sfGross Floor Area
3Units
Rent Stabilized11 Open Violations 7 unresolved · 4 paperwork only ▸FDNY Report ↗
Three families · Owner of record: WAP 8620 LLC · 3,867 sf lot · 0.8 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalPlumbingFire Protection
Permit Issued — active, not yet Signed-off
RoofUnder Construction27p · 2 filings · 20 docs
BulkheadUnder Construction1p · 1 filing · 3 docs
Floor 5Under Construction28p · 2 filings · 20 docs
Floor 4Under Construction26p · 2 filings · 20 docs
Floor 3Under Construction47p · 2 filings · 20 docs
Floor 2Under Construction46p · 2 filings · 20 docs
Floor 1Under Construction47p · 3 filings · 20 docs
CellarUnder Construction46p · 1 filing · 20 docs
1 job · most recent 09/10/2026
Air Conditioning Systems Associated Ducts and Piping Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
09/10/2026Permit IssuedGLORY R CONSTRUCTION INCAir Conditioning Systems, Associated Ducts and Piping, Ventilation Systems
Cooling
Mitsubishi Electric SLZ-KF15NA-NG 14,100 BTU · Vrf Indoor ×15
MXZ-5C42NA2 40,500 BTU · Condensing Unit ×4
York ZF078N10A2AAA4A 78,000 BTU · Rooftop Unit ×2
Ventilation
Panasonic FV-0510VSL1 75 CFM · Exhaust Fan ×4
1 job · most recent 09/10/2026
Sprinkler System
FiledStatusContractorScope
09/10/2026Permit IssuedADVANCED PLBG, MECH & SPRSprinkler System
1 job · most recent 09/10/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
09/10/2026Permit IssuedADVANCED PLUMBING MECHGas, Storm, Water/Sanitary
3 jobs · most recent 03/11/2026
General Wiring
FiledStatusContractorScope
03/11/2026Permit IssuedW 8 ELECTRIC CORPGeneral Wiring
01/07/2026Permit IssuedKWONG MING ELECTRIC INC—
12/02/2025Permit IssuedSOLAS ELECTRICAL CORP—
1 job · most recent 09/10/2026
Concrete
FiledStatusContractorScope
09/10/2026Permit IssuedGLORY R CONSTRUCTION INCConcrete
3 jobs · most recent 12/02/2025
Sidewalk Shed Scaffold Fence
FiledStatusContractorScope
12/02/2025Permit IssuedCORE SCAFFOLD SYSTEMS INCSidewalk Shed
11/19/2025Permit IssuedGLORY R CONSTRUCTION INCScaffold
01/23/2024Permit IssuedGLORY R CONSTRUCTION INCFence
1 job · most recent 07/14/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
07/14/2026Permit IssuedBRISCO BUILDERS INCSuspended Scaffold (SC)
Building Lifecycle
All (147)Filed (18)Permit Issued (17)Signed Off (1)Violation (19)Inspection (3)Objection (59)Special Inspection (30)
09/10/2026
Filed — New Building
SUBSEQUENT FILING FOR EXTERIOR PLUMBING WORK. INSTALL OF NEW SITE CONNECTION WITH DEP APPROVAL #3307/25
B00833445-S9
09/10/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
08/25/2026
Permit issued — Construction Fence
B00898505-I1-FN
08/12/2026
Objection resolved — Resolved
08/06/2026
Objection raised — Other
07/28/2026
Permit issued — Suspended Scaffold
B01430109-I1-SC
07/14/2026
Filed — Alteration
OUTRIGGER FOR FACADE REPAIR.
B01430109-I1
07/07/2026
Filed — New Building
SUBSEQUENT FILING FOR EXTERIOR PLUMBING WORK. INSTALL OF NEW SITE CONNECTION WITH DEP APPROVAL #3307/25
B00833445-P4
07/07/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
BARNABY BURY
07/07/2026
Special inspection requirement — Energy Code Compliance Inspections
BARNABY BURY
07/07/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
BARNABY BURY
07/07/2026
Special inspection requirement — Maintenance information
BARNABY BURY
07/07/2026
Special inspection requirement — HVAC-R and service water heating equipment
BARNABY BURY
06/24/2026
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
06/23/2026
Objection raised — Other
06/22/2026
Violation issued (ECB, open)
Construction
06/22/2026
Violation issued (ECB, open)
Unknown
06/16/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
06/12/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
06/11/2026
Permit issued — General Construction
B00833445-I1-GC
06/05/2026
Filed — New Building
SUBSEQUENT FILING FOR EXTERIOR PLUMBING WORK. INSTALL OF NEW SITE CONNECTION WITH DEP APPROVAL #3307/25
B00833445-P2
05/21/2026
Permit issued — Sprinklers
B00833445-S2-EW-SP
05/21/2026
Permit issued — Plumbing
B00833445-S1-PL
05/12/2026
Permit issued — General Construction
B00833445-I1-GC
05/01/2026
Violation issued (HPD, open)
A
03/16/2026
Violation issued (ECB, closed)
Unknown
03/16/2026
Violation issued (ECB, closed)
Unknown
03/16/2026
Violation issued (ECB, open)
Unknown
03/16/2026
Violation issued (ECB, open)
Construction
03/11/2026
Permit issued — General Construction
B00833445-I1-GC
12/02/2025
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01327212-I1
12/02/2025
Permit issued — Sidewalk Shed
B01327212-I1-SH
11/26/2025
Filed — New Building
SUBSEQUENT FILING FOR EXTERIOR PLUMBING WORK. INSTALL OF NEW SITE CONNECTION WITH DEP APPROVAL #3307/25
B00833445-S2
11/26/2025
Special inspection requirement — Post-installed Anchors
BARNABY BURY
11/20/2025
Filed — New Building
SUBSEQUENT FILING FOR EXTERIOR PLUMBING WORK. INSTALL OF NEW SITE CONNECTION WITH DEP APPROVAL #3307/25
B00833445-S1
11/19/2025
Filed — Alteration
INSTALLATION AND USE OF SCAFFOLD AS PER PLANS SUBMITTED. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF NYC BUILDING CODE. THIS APPLICATION INVOLVES NO CHANGE IN OCCUPANCY, USE OR EGRESS.
B01320791-P1
11/19/2025
Filed — Alteration
INSTALLATION AND USE OF SCAFFOLD AS PER PLANS SUBMITTED. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF NYC BUILDING CODE. THIS APPLICATION INVOLVES NO CHANGE IN OCCUPANCY, USE OR EGRESS.
B01320791-I1
11/19/2025
Permit issued — Supported Scaffold
B01320791-I1-SF
11/19/2025
Violation issued (HPD, open)
I
11/12/2025
Permit issued — Structural
B00833445-S4-ST
10/24/2025
Permit issued — Foundation
B00833445-S5-FO
10/08/2025
Permit issued — Support of Excavation
B00833445-S6-SE
10/06/2025
Objection resolved — Addressed
09/19/2025
Objection raised — Other
09/19/2025
Objection raised — Admin
09/19/2025
Objection raised — Admin
09/19/2025
Objection raised — Admin
09/19/2025
Objection raised — Other
09/19/2025
Objection raised — Other
09/19/2025
Objection raised — Other
09/19/2025
Objection raised — Energy
09/09/2025
Objection raised — Other
09/03/2025
Filed — New Building
SUBSEQUENT FILING FOR EXTERIOR PLUMBING WORK. INSTALL OF NEW SITE CONNECTION WITH DEP APPROVAL #3307/25
B00833445-P1
08/29/2025
Special inspection requirement — Seismic Isolation Systems
ANDREW GOODRICH
08/29/2025
Special inspection requirement — Energy Code Compliance Inspections
ANDREW GOODRICH
08/29/2025
Special inspection requirement — Fire-Resistance Rated Construction
ANDREW GOODRICH
08/29/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
ANDREW GOODRICH
08/29/2025
Special inspection requirement — Air barrier — testing
ANDREW GOODRICH
08/29/2025
Special inspection requirement — Electrical motors and elevators
ANDREW GOODRICH
08/29/2025
Special inspection requirement — Air barrier - visual inspection
ANDREW GOODRICH
Latest 60 of 147 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
OWNERS REP307/08/2026
GLORY R CONSTRUCTION403/22/2026
HIGH QUALITY CONSTRUCTION203/22/2026
53RD STREET GROUP203/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/12/2023$1.4M—— → —$449/sf building
11/29/2022$1.4M—Private party → LV 20 AVE REALTY PROPERTY LLC$446/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MEIYUN CHEN403/21/2026
HM LOKE CONSULTING ENGINEERING PC203/21/2026
BASIC GROUPS803/21/2026
A PLUS DESIGN INC.403/21/2026
AE DESIGN SOLUTION203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GLORY R CONSTRUCTION INCGeneral Contractor1008/26/2026
HIGH QUALITY CONSTRUCTIONGeneral Contractor304/09/2026
ADVANCED PLBG, MECH & SPRFire Protection106/27/2026
CORE SCAFFOLD SYSTEMS INC.General Contractor107/08/2026
JOHN EVAN CONTRACTING CORGeneral Contractor104/09/2026
ADVANCED PLUMBING MECHPlumbing106/17/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
GRAND INSPECTION & CONSUL6792807/07/2026
TIMES BUILDINGS ENGINEERI710406/05/2026
ANDREW GOODRICH, P.E., PL965109/03/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FencePermit IssuedGLORY R CONSTRUCTION INC08/25/2026
DOB NOWSuspended ScaffoldPermit IssuedBRISCO BUILDERS INC07/28/2026
DOB NOWGeneral ConstructionPermit IssuedGLORY R CONSTRUCTION INC06/11/2026
DOB NOWSprinklersPermit IssuedADVANCED PLBG, MECH & SPR05/21/2026
DOB NOWPlumbingPermit IssuedADVANCED PLUMBING MECH05/21/2026
DOB NOWGeneral ConstructionPermit IssuedGLORY R CONSTRUCTION INC05/12/2026
DOB NOWGeneral ConstructionPermit IssuedGLORY R CONSTRUCTION INC03/11/2026
DOB NOWSidewalk ShedPermit IssuedCORE SCAFFOLD SYSTEMS INC12/02/2025
DOB NOWSupported ScaffoldPermit IssuedGLORY R CONSTRUCTION INC11/19/2025
DOB NOWStructuralPermit IssuedGLORY R CONSTRUCTION INC11/12/2025
DOB NOWFoundationPermit IssuedGLORY R CONSTRUCTION INC10/24/2025
DOB NOWSupport of ExcavationPermit IssuedGLORY R CONSTRUCTION INC10/08/2025
DOB NOWSupport of ExcavationPermit IssuedGLORY R CONSTRUCTION INC08/28/2025
DOB NOWConstruction FencePermit IssuedGLORY R CONSTRUCTION INC08/26/2025
DOB NOWConstruction FencePermit IssuedHIGH QUALITY CONSTRUCTION04/04/2025
DOB NOWFull DemolitionSigned-offJOHN EVAN CONTRACTING COR04/03/2025
DOB NOWConstruction FencePermit IssuedHIGH QUALITY CONSTRUCTION02/13/2024
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
06/24/2026Pass-Final PL - UndergroundPassView ↗
06/16/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/12/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 59
DateRequirementInspectorRole
09/10/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation—special
07/07/2026Fire-Resistant Penetrations and JointsBARNABY BURYspecial
07/07/2026Energy Code Compliance InspectionsBARNABY BURYprogress
07/07/2026HVAC-R and service water piping design and insulationBARNABY BURYenergy_progress
07/07/2026Maintenance informationBARNABY BURYenergy_progress
07/07/2026HVAC-R and service water heating equipmentBARNABY BURYenergy_progress
11/26/2025Post-installed AnchorsBARNABY BURYspecial
08/29/2025Seismic Isolation SystemsANDREW GOODRICHspecial
08/29/2025Energy Code Compliance InspectionsANDREW GOODRICHprogress
08/29/2025Fire-Resistance Rated ConstructionANDREW GOODRICHprogress
08/29/2025Fenestration and door U-factor and product ratingsANDREW GOODRICHenergy_progress
08/29/2025Air barrier — testing ANDREW GOODRICHenergy_progress
08/29/2025Electrical motors and elevatorsANDREW GOODRICHenergy_progress
08/29/2025Air barrier - visual inspectionANDREW GOODRICHenergy_progress
08/29/2025Exterior lighting powerANDREW GOODRICHenergy_progress
08/29/2025Fenestration areasANDREW GOODRICHenergy_progress
08/29/2025Interior lighting powerANDREW GOODRICHenergy_progress
08/29/2025Air barrier continuity plan testingANDREW GOODRICHenergy_progress
08/29/2025Fenestration air leakageANDREW GOODRICHenergy_progress
08/29/2025Lighting controls—energy_progress
08/29/2025Protection of exposed foundation insulation—energy_progress
08/29/2025Insulation placement and R valuesANDREW GOODRICHenergy_progress
08/29/2025Metering—energy_progress
08/29/2025Maintenance informationANDREW GOODRICHenergy_progress
08/29/2025Concrete - Cast-In-PlaceANDREW GOODRICHspecial
Latest 25 of 59.
▾Documents — 113 on file (BIS + DOB NOW)
▸Plans & Drawings17
▸DOB NOWPlans/Sketch17
08/26/2026B00898505-I1Request digital key ↗
08/25/2026B00893057-I1Request digital key ↗
08/25/2026B00893057-P3Request digital key ↗
Showing 3 of 17 on file for this type
▸Applications & Permits1
▸BISPLAN / WORK APPROVAL APPLICATION1
07/05/2023340893518Open ↗
▸Zoning, Tax Lot & Property Records6
▸DOB NOWZD1: DOB Zoning Diagram3
08/15/2026B00833445-P2Open ↗
08/13/2026B00833445-P1Open ↗
08/13/2026B00833445-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)3
08/15/2026B00833445-P2Open ↗
08/13/2026B00833445-I1Open ↗
08/13/2026B00833445-P1Open ↗
▸Seals & Professional Certifications48
▸DOB NOWDPL-1: Design Professional Seal & Signature19
09/15/2026B00833445-P5Open ↗
09/15/2026B00833445-P6Open ↗
09/15/2026B00833445-S9Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature18
09/23/2026B00833445-P6Open ↗
09/23/2026B00833445-P6Open ↗
09/23/2026B00833445-P5Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
09/23/2026B00833445-P5Open ↗
09/23/2026B00833445-P6Open ↗
09/01/2026B00833445-I1Open ↗
Showing 3 of 9 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
07/05/2023340893518Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
07/05/2023340893518Open ↗
▸Trade Schedules & Equipment5
▸DOB NOWElectric Cut-Off1
08/13/2026B00893057-I1Open ↗
▸DOB NOWSewer Cut-Off1
08/13/2026B00893057-I1Open ↗
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/13/2026B00833445-I1Open ↗
▸DOB NOWGas Cut-Off1
08/13/2026B00893057-I1Open ↗
▸DOB NOWWater Cut-Off1
08/13/2026B00893057-I1Open ↗
▸Safety & Tenant Protection6
▸DOB NOWStreet Tree Checklist3
08/15/2026B00833445-I1Open ↗
08/15/2026B00833445-P2Open ↗
08/14/2026B00833445-P1Open ↗
▸BISBPP: STREET TREES SITE PLAN1
07/05/2023340893518Open ↗
▸BISSTREET TREE CHECKLIST1
07/05/2023340893518Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/15/2026B00833445-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/13/2026B00893057-I1Open ↗
08/13/2026B00893057-P3Open ↗
08/13/2026B00893057-P1Open ↗
▸DOB NOWRodent Control1
08/13/2026B00893057-I1Open ↗
▸Inspections & Test Reports3
▸DOB NOWSOIL REPORT2
09/15/2026B00833445-P6Open ↗
08/13/2026B00833445-S5Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B00833445-S5Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
07/05/2023340893518Open ↗
▸Other Documents22
▸DOB NOWProperty Ownership Certification6
08/15/2026B00833445-I1Open ↗
08/15/2026B00833445-P2Open ↗
08/14/2026B00833445-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSite Survey: Initial3
08/15/2026B00833445-P2Open ↗
08/13/2026B00833445-I1Open ↗
08/13/2026B00833445-P1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/15/2026B00833445-P2Open ↗
08/13/2026B00833445-P1Open ↗
08/13/2026B00833445-I1Open ↗
▸DOB NOWStructure Photographs3
08/13/2026B00893057-P1Open ↗
08/13/2026B00893057-P3Open ↗
08/13/2026B00893057-I1Open ↗
▸DOB NOWWaiver Document2
08/15/2026B00833445-I1Open ↗
08/15/2026B00833445-P2Open ↗
▸DOB NOWCalculations1
08/16/2026B01430109-I1Open ↗
▸DOB NOWCommunity Board Notification1
08/13/2026B00893057-I1Open ↗
▸DOB NOWFull Demo: 10-Day Notice1
08/13/2026B00893057-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/16/2026B01430109-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026B00833445-S6Open ↗