← Back
Three families
863 DUMONT AVENUE
BROOKLYN · BIN 3090029
💬 Discuss this project
1901Year Built
3Stories
C0Building Class
R5Zoning
3,021 sfGross Floor Area
3Units
Rent Stabilized7 Open Violations ▸FDNY Report ↗
Three families · Owner of record: 863 DUMONT LLC · 2,500 sf lot · 1.21 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
863 DUMONT2007/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/05/2019$830K—— → —$275/sf building
04/04/2019$640K—— → —$212/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MAYERFELD ARCHITECTURE PLLC408/09/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PDG BUILDING CONSULTANTS LLC LLC803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ZONE PLUMBING & HEATING CPlumbing207/08/2026
WALSH LAWRENCEElectrical103/21/2026
PREMIER PIPE SOLUTIONSPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ENGINEERING CONSULTING SE2050408/09/2021
Building Lifecycle
All (69)Filed (4)Permit Issued (3)Signed Off (1)Violation (53)Objection (2)Special Inspection (6)
11/18/2025
Violation issued (HPD, closed)
I
07/21/2025
Violation issued (HPD, open)
A
07/21/2025
Violation issued (HPD, open)
B
07/21/2025
Violation issued (HPD, open)
B
03/19/2024
Violation issued (HPD, closed)
A
03/19/2024
Violation issued (HPD, closed)
A
03/19/2024
Violation issued (HPD, closed)
A
03/22/2023
Violation issued (HPD, closed)
A
02/26/2023
Violation issued (HPD, closed)
C
02/26/2023
Violation issued (HPD, open)
B
02/26/2023
Violation issued (HPD, open)
C
02/26/2023
Violation issued (HPD, open)
B
02/26/2023
Violation issued (HPD, open)
A
02/26/2023
Violation issued (HPD, closed)
B
02/26/2023
Violation issued (HPD, closed)
B
11/07/2022
Violation issued (HPD, closed)
I
04/26/2022
Violation issued (HPD, closed)
B
04/26/2022
Violation issued (HPD, closed)
C
02/24/2022
Violation issued (HPD, closed)
I
02/24/2022
Violation issued (HPD, closed)
A
09/03/2021
Signed off — Alteration
rearrange plumbing fixtures on the 2nd floor as per plans filed
B00345421-I1
08/09/2021
Filed — Alteration
rearrange plumbing fixtures on the 2nd floor as per plans filed
B00345421-P3
08/06/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
PAUL MARINO
08/06/2021
Special inspection requirement — HVAC insulation and sealing
PAUL MARINO
07/27/2021
Filed — Alteration
rearrange plumbing fixtures on the 2nd floor as per plans filed
B00345421-P2
07/27/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
PAUL MARINO
07/27/2021
Special inspection requirement — HVAC insulation and sealing
PAUL MARINO
07/13/2021
Permit issued — Plumbing
B00345421-I1-PL
06/21/2021
Objection resolved — Addressed
05/11/2021
Objection raised — Scope
05/07/2021
Filed — Alteration
rearrange plumbing fixtures on the 2nd floor as per plans filed
B00345421-P1
05/07/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
PAUL MARINO
05/07/2021
Special inspection requirement — HVAC insulation and sealing
PAUL MARINO
04/29/2021
Violation issued (HPD, closed)
B
04/29/2021
Violation issued (HPD, closed)
C
04/29/2021
Violation issued (HPD, closed)
C
04/29/2021
Violation issued (HPD, closed)
C
04/29/2021
Violation issued (HPD, closed)
C
04/08/2021
Violation issued (HPD, closed)
A
02/18/2021
Permit issued — Plumbing
B00345421-I1-PL
07/07/2020
Permit issued — Plumbing
B00345421-I1-PL
04/29/2020
Filed — Alteration
rearrange plumbing fixtures on the 2nd floor as per plans filed
B00345421-I1
10/29/2019
Violation issued (HPD, closed)
I
10/16/2018
Violation issued (HPD, closed)
I
11/21/2017
Violation issued (HPD, closed)
I
11/07/2016
Violation issued (HPD, closed)
I
10/08/2015
Violation issued (HPD, closed)
I
02/18/2015
Violation issued (HPD, closed)
I
10/30/2013
Violation issued (HPD, closed)
A
10/30/2013
Violation issued (HPD, closed)
C
10/30/2013
Violation issued (HPD, closed)
B
10/30/2013
Violation issued (HPD, closed)
B
04/28/2010
Violation issued (HPD, closed)
I
04/19/2010
Violation issued (HPD, closed)
A
04/19/2010
Violation issued (HPD, closed)
B
04/19/2010
Violation issued (HPD, closed)
C
04/19/2010
Violation issued (HPD, closed)
C
04/19/2010
Violation issued (HPD, closed)
C
04/18/2010
Violation issued (HPD, closed)
B
04/18/2010
Violation issued (HPD, closed)
C
Latest 60 of 69 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offZONE PLUMBING & HEATING C07/13/2021
DOB NOWPlumbingSigned-offZONE PLUMBING & HEATING C02/18/2021
DOB NOWPlumbingSigned-offTOMKAT PLUMBING HEATING L07/07/2020
BISOTISSUEDGOLDSTAR PROPERTY SERVICE03/16/2020
1 project · most recent 06/08/2020
General Wiring
FiledStatusContractorScope
06/08/2020CompleteGREEN POWER ELECTRIC CORPGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
08/06/2021Fire-Resistant Penetrations and JointsPAUL MARINOspecial
08/06/2021HVAC insulation and sealing PAUL MARINOenergy_progress
07/27/2021Fire-Resistant Penetrations and JointsPAUL MARINOspecial
07/27/2021HVAC insulation and sealing PAUL MARINOenergy_progress
05/07/2021Fire-Resistant Penetrations and JointsPAUL MARINOspecial
05/07/2021HVAC insulation and sealing PAUL MARINOenergy_progress
▾Documents — 43 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch - Plumbing4
09/02/2026B00345421-P3Request digital key ↗
09/02/2026B00345421-I1Request digital key ↗
09/02/2026B00345421-P2Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits4
▸BISPLAN / WORK APPROVAL APPLICATION3
06/03/2021322014976Open ↗
05/11/2021322014976Open ↗
12/03/2019322014976Open ↗
▸BISWORK PERMIT APPLICATION1
03/20/2020322014976Open ↗
▸Seals & Professional Certifications14
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
03/20/2020322014976Open ↗
03/20/2020322014976Open ↗
01/07/2020322014976Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/13/2026B00345421-P1Open ↗
08/13/2026B00345421-P2Open ↗
08/13/2026B00345421-P3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
08/31/2026B00345421-P3Open ↗
08/25/2026B00345421-P2Open ↗
08/24/2026B00345421-P1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature3
08/31/2026B00345421-P3Open ↗
08/25/2026B00345421-P2Open ↗
08/24/2026B00345421-P1Open ↗
▸Trade Schedules & Equipment2
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
07/28/2021322014976Open ↗
▸BISDETECTOR:CARBON MONOXIDE-CERT.OF INSTALL1
07/28/2021322014976Open ↗
▸Safety & Tenant Protection1
▸BISTenant Protection Plan and Notes1
01/07/2020322014976Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/13/2026B00345421-I1Open ↗
08/13/2026B00345421-P1Open ↗
08/13/2026B00345421-P2Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance4
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
03/20/2020322014976Open ↗
01/07/2020322014976Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
07/22/2021322014976Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
07/22/2021322014976Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
07/22/2021322014976Open ↗
07/22/2021322014976Open ↗
▸Approvals, Objections & Sign-offs1
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
07/31/2021322014976Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT2
07/27/2021322014976Open ↗
12/03/2019322014976Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
07/31/2021322014976Open ↗
▸Filing & Intake Forms4
▸BISADDITIONAL INFORMATION3
06/30/2021322014976Open ↗
06/18/2021322014976Open ↗
05/11/2021322014976Open ↗
▸BISEFILING COVER SHEET1
12/03/2019322014976Open ↗