Two family converted from one family · 2,172 sf lot · 1.26 FAR built · Flood zone X
Locations of Work
Structural
Basement1p · 1 filing · 20 docs
1 job · most recent 02/17/2020
FiledStatusContractorScope
02/17/2020CompleteANTONIO CERIELLO ELEC INC—
1 job · most recent 08/01/2023
Scaffold
FiledStatusContractorScope
08/01/2023——Scaffold
Building Lifecycle
All (36)Filed (5)Permit Issued (2)Signed Off (2)Inspection (2)Objection (13)Special Inspection (12)
10/23/2025
Signed off — Alteration
CELLAR: NEW 2 PIECE BATH. RELOCATE WASHER/DRYER. BAS: NEW HATCH. NEW WINDOW GATE. FL2: NEW BATH TILE FIXTURES. EX: NEW WINDOWS. NEW EX DOOR FL 1, NEW STEEL STAIR, BALCONY. FL 3: NEW WOOD DECK, RAILING. REMOVE RED PAINT AT BAS FL, RE-EXPOSE BROWNSTONE.
B00612906-I1
10/22/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
09/17/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
09/04/2025
Special inspection requirement — Subgrade Inspections
John Natoli
09/04/2025
Special inspection requirement — Concrete - Cast-In-Place
John Natoli
09/04/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
John Natoli
09/04/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Devang Shah
09/02/2025
Filed — Alteration
CELLAR: NEW 2 PIECE BATH. RELOCATE WASHER/DRYER. BAS: NEW HATCH. NEW WINDOW GATE. FL2: NEW BATH TILE FIXTURES. EX: NEW WINDOWS. NEW EX DOOR FL 1, NEW STEEL STAIR, BALCONY. FL 3: NEW WOOD DECK, RAILING. REMOVE RED PAINT AT BAS FL, RE-EXPOSE BROWNSTONE.
B00612906-P2
08/22/2025
Special inspection requirement — Concrete - Cast-In-Place
John Natoli
08/22/2025
Special inspection requirement — Subgrade Inspections
John Natoli
08/22/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
John Natoli
08/22/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Devang Shah
02/13/2024
Signed off — Alteration
B00929606-I1
11/13/2023
Permit issued — Supported Scaffold
B00929606-I1-SF
10/01/2023
Objection resolved — Addressed
10/01/2023
Objection resolved — Addressed
10/01/2023
Objection resolved — Addressed
10/01/2023
Objection resolved — Addressed
09/07/2023
Filed — Alteration
B00929606-I1
08/24/2023
Objection resolved — Addressed
08/24/2023
Objection resolved — Addressed
08/07/2023
Objection raised — Inspections
08/07/2023
Objection raised — Fire_Protection
08/07/2023
Objection raised — Structural
08/07/2023
Objection raised — Structural
08/07/2023
Objection raised — Inspections
08/07/2023
Objection raised — Scope
08/07/2023
Objection raised — Mechanical
08/01/2023
Filed — Alteration
APPLICATION FOR INSTALLATION OF TEMPORARY-SUPPORTED SCAFFOLD (OSP). NO CHANGE IN USE, EGRESS AND OCCUPANCY.
B00905698-I1
04/20/2022
Permit issued — General Construction
B00612906-I1-GC
03/30/2022
Filed — Alteration
CELLAR: NEW 2 PIECE BATH. RELOCATE WASHER/DRYER. BAS: NEW HATCH. NEW WINDOW GATE. FL2: NEW BATH TILE FIXTURES. EX: NEW WINDOWS. NEW EX DOOR FL 1, NEW STEEL STAIR, BALCONY. FL 3: NEW WOOD DECK, RAILING. REMOVE RED PAINT AT BAS FL, RE-EXPOSE BROWNSTONE.
B00612906-P1
03/08/2022
Special inspection requirement — Concrete - Cast-In-Place
John Natoli
03/08/2022
Special inspection requirement — Subgrade Inspections
John Natoli
03/08/2022
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
John Natoli
03/08/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
Devang Shah
10/15/2021
Filed — Alteration
CELLAR: NEW 2 PIECE BATH. RELOCATE WASHER/DRYER. BAS: NEW HATCH. NEW WINDOW GATE. FL2: NEW BATH TILE FIXTURES. EX: NEW WINDOWS. NEW EX DOOR FL 1, NEW STEEL STAIR, BALCONY. FL 3: NEW WOOD DECK, RAILING. REMOVE RED PAINT AT BAS FL, RE-EXPOSE BROWNSTONE.
B00612906-I1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ARCHITECTURAL DESIGN SOLUTIONS307/08/2026
ALAM GENERAL CONTRACTING INC.203/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/11/2019$1.7M—Private party → Private party$622/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
DEVANG ARVIND SHAH309/02/2025
BANGASH ASSOCIATES INC.109/07/2023
ARC-HI-TECT ASSOCIATE INC108/01/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ARC-HI-TECT ASSOCIATE403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BK IRON WORKS CORPGeneral Contractor207/08/2026
ALAM GENERAL CONTRACTINGGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CONSULTING ENGINEER5093309/02/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupported ScaffoldSigned-offALAM GENERAL CONTRACTING11/13/2023
DOB NOWGeneral ConstructionSigned-offBK IRON WORKS CORP04/20/2022
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
10/22/2025Pass-Final General Construction Non-Directive 14PassView ↗
09/17/2025Fail-Final General Construction Non-Directive 14FailView ↗
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
09/04/2025Subgrade InspectionsJohn Natolispecial
09/04/2025Concrete - Cast-In-PlaceJohn Natolispecial
09/04/2025Subsurface Investigations (Borings/Test Pits)John Natolispecial
09/04/2025Fenestration and door U-factor and product ratingsDevang Shahenergy_progress
08/22/2025Concrete - Cast-In-PlaceJohn Natolispecial
08/22/2025Subgrade InspectionsJohn Natolispecial
08/22/2025Subsurface Investigations (Borings/Test Pits)John Natolispecial
08/22/2025Fenestration and door U-factor and product ratingsDevang Shahenergy_progress
03/08/2022Concrete - Cast-In-PlaceJohn Natolispecial
03/08/2022Subgrade InspectionsJohn Natolispecial
03/08/2022Subsurface Investigations (Borings/Test Pits)John Natolispecial
03/08/2022Fenestration and door U-factor and product ratingsDevang Shahenergy_progress
▾Documents — 34 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/30/2026B00612906-I1Request digital key ↗
08/30/2026B00612906-P1Request digital key ↗
08/30/2026B00612906-P2Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits3
▸DOB NOWLPC Approval/Permit3
08/30/2026B00612906-P1Open ↗
08/30/2026B00612906-I1Open ↗
08/30/2026B00612906-P2Open ↗
▸Seals & Professional Certifications17
▸DOB NOWSpecial Inspector Seal & Signature9
09/01/2026B00612906-I1Open ↗
09/01/2026B00612906-I1Open ↗
09/01/2026B00612906-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/30/2026B00612906-P1Open ↗
08/30/2026B00612906-I1Open ↗
08/30/2026B00612906-P2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
09/01/2026B00612906-I1Open ↗
08/23/2026B00612906-P2Open ↗
08/22/2026B00612906-P1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/30/2026B00612906-P1Open ↗
08/30/2026B00612906-I1Open ↗
08/30/2026B00612906-P2Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/30/2026B00612906-I1Open ↗
▸Inspections & Test Reports5
▸DOB NOWSOIL REPORT3
08/30/2026B00612906-P2Open ↗
08/30/2026B00612906-P1Open ↗
08/30/2026B00612906-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/30/2026B00612906-I1Open ↗
▸DOB NOWTR4 Plot Diagram1
08/30/2026B00612906-I1Open ↗