← Back
BuildNYC
Primarily 2 family with 1 store or office
8644 18TH AVENUE
BROOKLYN · Bath Beach · BIN 3166581
💬 Discuss this project
1923Year Built
3Stories
S2Building Class
R5Zoning
4,333 sfGross Floor Area
3Units
0 Active ViolationsFDNY Report ↗
Primarily 2 family with 1 store or office · Owner of record: Brooklyn Music Group · 2,626 sf lot · 1.65 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofBrooklyn Music Group1p · 1 filing · 20 docs
Floor 2Brooklyn Music Group10p · 1 filing · 20 docs
Floor 1Brooklyn Music Group10p · 2 filings · 20 docs
CellarBrooklyn Music Group23p · 5 filings · 20 docs
Site & exteriorBrooklyn Music Group5p · 3 filings · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Brooklyn Music Group3107/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
07/30/2020$1.4M—S & K 18 LLC → Brooklyn Music Group$323/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Bassiri309/27/2023
NTD Engineering Consultant801/06/2023
Billah Engineering210/21/2022
Flushing102/04/2022
S M Tam Architect101/25/2022
KL Innovative Design408/03/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
S M Tam Architect1603/21/2026
Basic Groups803/21/2026
Ecdesign Studio1003/21/2026
LC Expediting Services203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DPH Plumbing & HeatingPlumbing407/08/2026
Mohammed S UddinGeneral Contractor307/08/2026
Kle ConstructionGeneral Contractor303/21/2026
Splen ConstructionScaffold303/21/2026
PipestylistsPlumbing207/08/2026
Splen ConstructionGeneral Contractor207/08/2026
Neptune Signs & AwningsSign hanger107/08/2026
Mohammed S UddinScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JW Engineering Consulting5300901/06/2023
KL Innovative Design7225408/03/2020
Building Lifecycle
All (139)Filed (19)Permit Issued (11)Signed Off (6)Violation (17)Inspection (4)Objection (52)Special Inspection (30)
10/20/2023
Signed off — Alteration
INSTALL NEW AWNING AS PER PLAN. NO CHANGE IN USE, EGRESS, AND OCCUPANCY.
B00929980-I1
10/20/2023
Signed off — Alteration
INSTALL NEW NON-ILLUMINATED SIGN READ"BROOKLYN MUSIC HOUSE, INC." AS PER PLAN. NO CHANGE IN USE, EGRESS, AND OCCUPANCY
B00929981-I1
10/19/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
10/19/2023
Inspection — Pass-Final Sign Permit Inspection
Pass
View inspection ↗
09/27/2023
Filed — Alteration
INSTALL NEW NON-ILLUMINATED SIGN READ"BROOKLYN MUSIC HOUSE, INC." AS PER PLAN. NO CHANGE IN USE, EGRESS, AND OCCUPANCY
B00929981-P1
09/27/2023
Permit issued — Sign
B00929981-I1-SG
09/11/2023
Permit issued — General Construction
B00929980-I1-GC
09/07/2023
Filed — Alteration
INSTALL NEW AWNING AS PER PLAN. NO CHANGE IN USE, EGRESS, AND OCCUPANCY.
B00929980-I1
09/07/2023
Filed — Alteration
INSTALL NEW NON-ILLUMINATED SIGN READ"BROOKLYN MUSIC HOUSE, INC." AS PER PLAN. NO CHANGE IN USE, EGRESS, AND OCCUPANCY
B00929981-I1
06/15/2023
Signed off — Alteration
B00428975-I1
03/15/2023
Special inspection requirement — Structural Steel - Details
JIANXIONG WANG
03/15/2023
Special inspection requirement — Structural Wood Frame
03/15/2023
Special inspection requirement — Final
JIANXIONG WANG
03/15/2023
Special inspection requirement — Structural Cold-Formed Steel
JIANXIONG WANG
03/15/2023
Special inspection requirement — Structural Steel - High Strength Bolting
JIANXIONG WANG
03/15/2023
Special inspection requirement — Masonry
JIANXIONG WANG
03/15/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
JIANXIONG WANG
03/15/2023
Special inspection requirement — Concrete - Cast-In-Place
JIANXIONG WANG
03/13/2023
Objection resolved — Addressed
03/13/2023
Objection resolved — Addressed
01/29/2023
Objection resolved — Addressed
01/18/2023
Objection resolved — Addressed
01/18/2023
Special inspection requirement — Structural Wood Frame
01/12/2023
Objection raised — Scope
01/12/2023
Objection raised — Scope
01/12/2023
Objection raised — Scope
01/12/2023
Objection raised — Inspections
01/06/2023
Filed — Alteration
Replace 1st floor by steel beam with concrete metal decking.
B00436306-P2
01/02/2023
Special inspection requirement — Concrete - Cast-In-Place
JIANXIONG WANG
01/02/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
JIANXIONG WANG
01/02/2023
Special inspection requirement — Structural Steel - Details
JIANXIONG WANG
01/02/2023
Special inspection requirement — Structural Steel - High Strength Bolting
JIANXIONG WANG
01/02/2023
Special inspection requirement — Masonry
JIANXIONG WANG
01/02/2023
Special inspection requirement — Structural Cold-Formed Steel
JIANXIONG WANG
01/02/2023
Special inspection requirement — Final
JIANXIONG WANG
12/07/2022
Signed off — Alteration
PROPOSED FOUNDATION SCOPE OF WORKS.
B00462786-I1
12/07/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/15/2022
Objection raised — Other
11/14/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/03/2022
Permit issued — Plumbing
B00428975-I1-PL
10/26/2022
Objection raised — Admin
10/26/2022
Objection raised — Admin
10/26/2022
Objection resolved — Addressed
10/26/2022
Objection raised — Admin
10/26/2022
Objection resolved — Addressed
10/26/2022
Objection raised — Admin
10/26/2022
Objection resolved — Addressed
10/26/2022
Objection raised — Admin
10/26/2022
Objection resolved — Addressed
10/25/2022
Violation issued (ECB, closed)
Construction
10/24/2022
Objection raised — Other
10/24/2022
Objection resolved — Addressed
10/24/2022
Objection raised — Other
10/24/2022
Objection resolved — Addressed
10/21/2022
Filed — Alteration
INSTALL NEW AWNING AS PER PLAN. NO CHANGE IN USE, EGRESS, AND OCCUPANCY.
B08022971-I1
10/21/2022
Filed — Alteration
INSTALL NEW ILLUMINATED SIGN READ "BROOKLYN MUSIC HOUSE, INC." AS PER
B08022970-I1
08/24/2022
Violation issued (ECB, closed)
Construction
06/28/2022
Special inspection requirement — Energy Code Compliance Inspections
JIANXIONG WANG
06/28/2022
Special inspection requirement — Concrete - Cast-In-Place
JIANXIONG WANG
06/28/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
JIANXIONG WANG
Latest 60 of 139 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSignSigned-offNeptune Signs & Awnings09/27/2023
DOB NOWGeneral ConstructionSigned-offKle Construction09/11/2023
DOB NOWPlumbingSigned-offDPH Plumbing & Heating11/03/2022
DOB NOWStructuralPermit IssuedSplen Construction05/05/2022
DOB NOWConstruction FencePermit IssuedSplen Construction05/04/2022
DOB NOWFoundationSigned-offSplen Construction05/02/2022
DOB NOWConstruction FencePermit IssuedMohammed S Uddin02/09/2022
DOB NOWFoundationSigned-offMohammed S Uddin02/07/2022
DOB NOWStructuralPermit IssuedMohammed S Uddin02/07/2022
DOB NOWBoiler EquipmentPermit IssuedT & T Plumbing06/25/2020
DOB NOWPlumbingSigned-offT & T Plumbing06/23/2020
BISOTISSUEDL&L Construction Development10/05/2022
BISBLISSUEDLloyd G Drummond Plumbing & Gen07/26/2011
BISPLISSUEDLloyd G Drummond Plumbing & Gen07/26/2011
BISMHISSUEDNadkos04/13/2011
BISPLISSUEDAmok05/20/2010
BISOTISSUEDTrinchese Construction05/12/2010
BISPLISSUEDAmok04/29/2010
BISOTISSUEDTrinchese Construction09/22/2009
1 project · most recent 06/12/2020
General Wiring
FiledStatusContractorScope
06/12/2020CompleteJ Y ElectricGeneral Wiring
2 projects · most recent 01/06/2023
Steel Concrete Wood
FiledStatusContractorScope
01/06/2023Permit IssuedSplen ConstructionSteel, Concrete, Wood
02/10/2022——2 scope_items
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
10/19/2023Pass-Final General Construction Non-Directive 14PassView ↗
10/19/2023Pass-Final Sign Permit InspectionPassView ↗
12/07/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/14/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 44
DateRequirementInspectorRole
03/15/2023Structural Steel - DetailsJIANXIONG WANGspecial
03/15/2023Structural Wood Frame—progress
03/15/2023FinalJIANXIONG WANGprogress
03/15/2023Structural Cold-Formed SteelJIANXIONG WANGspecial
03/15/2023Structural Steel - High Strength BoltingJIANXIONG WANGspecial
03/15/2023MasonryJIANXIONG WANGspecial
03/15/2023Structural Stability – Alterations of existing buildingsJIANXIONG WANGspecial
03/15/2023Concrete - Cast-In-PlaceJIANXIONG WANGspecial
01/18/2023Structural Wood Frame—progress
01/02/2023Concrete - Cast-In-PlaceJIANXIONG WANGspecial
01/02/2023Structural Stability – Alterations of existing buildingsJIANXIONG WANGspecial
01/02/2023Structural Steel - DetailsJIANXIONG WANGspecial
01/02/2023Structural Steel - High Strength BoltingJIANXIONG WANGspecial
01/02/2023MasonryJIANXIONG WANGspecial
01/02/2023Structural Cold-Formed SteelJIANXIONG WANGspecial
01/02/2023FinalJIANXIONG WANGprogress
06/28/2022Energy Code Compliance InspectionsJIANXIONG WANGprogress
06/28/2022Concrete - Cast-In-PlaceJIANXIONG WANGspecial
06/28/2022Structural Stability – Alterations of existing buildingsJIANXIONG WANGspecial
06/28/2022Subgrade InspectionsJIANXIONG WANGspecial
06/28/2022UnderpinningJIANXIONG WANGspecial
06/28/2022Subsurface Investigations (Borings/Test Pits)SAMER ABOU-GHAIDAspecial
06/28/2022Footing and FoundationJIANXIONG WANGprogress
06/28/2022FinalJIANXIONG WANGprogress
06/28/2022PreliminaryJIANXIONG WANGprogress
Latest 25 of 44.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Brooklyn Music GroupArts / Culture / EntertainmentEntire building
Project B00660283 Alteration · Permit Entire · 02/04/2022
Project B00428975 Alteration · LOC Issued · 01/25/2022
Project B00436306 Alteration · Permit Entire · 05/20/2021
Project B00462766 Alteration · Approved · 04/28/2021
Project B00462786 Alteration · LOC Issued · 04/28/2021
Project B00929981 Alteration · LOC Issued · 09/07/2023
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 218 on file (BIS + DOB NOW)
▸Plans & Drawings20
▸DOB NOWPlans/Sketch7
08/31/2026B00660283-I1Request digital key ↗
08/26/2026B00929980-I1Request digital key ↗
08/26/2026B00929981-P1Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - Foundation3
08/15/2026B00462786-P1Request digital key ↗
08/14/2026B00462786-P2Request digital key ↗
08/14/2026B00462786-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing3
09/02/2026B00361258-I1Request digital key ↗
08/31/2026B00428975-I1Request digital key ↗
08/15/2026B00361258-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural3
08/28/2026B00436306-I1Request digital key ↗
08/28/2026B00436306-P1Request digital key ↗
08/15/2026B00436306-P2Request digital key ↗
▸DOB NOWPlans/Sketch - Support of Excavation2
08/15/2026B00462766-P1Request digital key ↗
08/14/2026B00462766-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Boiler Equipment2
09/02/2026B00361262-I1Request digital key ↗
08/15/2026B00361262-P1Request digital key ↗
▸Applications & Permits19
▸BISPLAN / WORK APPROVAL APPLICATION10
08/31/2022340780088Open ↗
03/07/2022340780088Open ↗
11/04/2021320337346Open ↗
Showing 3 of 10 on file for this type
▸BISWORK PERMIT APPLICATION7
10/11/2022340780088Open ↗
03/30/2022340780088Open ↗
03/14/2022340780088Open ↗
Showing 3 of 7 on file for this type
▸BISPARTIAL DEMO PLAN & DS1 (FOR AL/EW-OT PERMITS)1
01/24/2022340780088Open ↗
▸BISPARTIAL DEMO: 10-DAY NOTICE (FOR AL/EW-OT PERMITS)1
01/24/2022340780088Open ↗
▸Zoning, Tax Lot & Property Records3
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
08/04/2021340780088Open ↗
▸BISZONING DIAGRAM1
08/04/2021340780088Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
08/04/2021340780088Open ↗
▸Seals & Professional Certifications70
▸DOB NOWSpecial Inspector Seal & Signature27
08/31/2026B00436306-P2Open ↗
08/31/2026B00436306-P2Open ↗
08/31/2026B00436306-P2Open ↗
Showing 3 of 27 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature18
09/01/2026B00462766-P1Open ↗
09/01/2026B00462766-I1Open ↗
08/31/2026B00428975-I1Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWProgress Inspector Seal & Signature14
08/31/2026B00436306-P2Open ↗
08/30/2026B00436306-P1Open ↗
08/27/2026B00436306-I1Open ↗
Showing 3 of 14 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION8
03/27/2020320337346Open ↗
03/18/2020320337346Open ↗
08/08/2011320337346Open ↗
Showing 3 of 8 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
11/16/2020340780088Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
04/18/2011320293614Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
04/18/2011320293614Open ↗
▸Trade Schedules & Equipment11
▸BISSELF-CERT PLUMBING NOTICE6
03/22/2012320337346Open ↗
03/09/2012320337346Open ↗
02/23/2012320337346Open ↗
Showing 3 of 6 on file for this type
▸BISSCHEDULE B - PLUMBING3
10/12/2011320337346Open ↗
07/14/2011320337346Open ↗
06/23/2009320040424Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT2
04/18/2011320293614Open ↗
05/03/2011320293614Open ↗
▸Safety & Tenant Protection10
▸DOB NOWTenant Protection Plan8
08/13/2026B00361258-P1Open ↗
08/13/2026B00361262-I1Open ↗
08/13/2026B00436306-P1Open ↗
Showing 3 of 8 on file for this type
▸BISSTREET TREE CHECKLIST1
06/23/2009320040424Open ↗
▸BISTenant Protection Plan and Notes1
11/16/2020340780088Open ↗
▸Environmental & Asbestos13
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
08/31/2026B00428975-I1Open ↗
08/28/2026B00436306-P1Open ↗
08/28/2026B00436306-I1Open ↗
Showing 3 of 9 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
07/14/2011320337346Open ↗
06/23/2009320040424Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
04/18/2011320293614Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
12/23/2020340780088Open ↗
▸Energy Compliance16
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY5
02/06/2023340780088Open ↗
03/30/2022340780088Open ↗
08/04/2021340780088Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
03/27/2020320337346Open ↗
03/18/2020320337346Open ↗
▸BISFENESTRATION AREAS1
02/06/2023340780088Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
02/06/2023340780088Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
02/06/2023340780088Open ↗
▸BISTECHNICAL REPORT: ENERGY1
07/14/2011320337346Open ↗
▸BISLIGHTING CONTROLS1
02/06/2023340780088Open ↗
▸BISFENESTRATION AIR LEAKAGE1
02/06/2023340780088Open ↗
▸BISINTERIOR LIGHTING POWER1
02/06/2023340780088Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
02/06/2023340780088Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026B00428975-I1Open ↗
▸Inspections & Test Reports18
▸BISTECHNICAL REPORT: RESPONSIBILITY7
02/06/2023340780088Open ↗
01/24/2022340780088Open ↗
08/04/2021340780088Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSOIL REPORT3
08/13/2026B00462786-P1Open ↗
08/13/2026B00462786-P2Open ↗
08/13/2026B00462786-I1Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
02/07/2023340780088Open ↗
03/30/2022340780088Open ↗
▸BISSOIL REPORT1
08/04/2021340780088Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
08/04/2021340780088Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
03/30/2022340780088Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
02/06/2023340780088Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026B00462786-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B00462786-I1Open ↗
▸Approvals, Objections & Sign-offs7
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
02/07/2023340780088Open ↗
05/03/2011320293614Open ↗
04/29/2011320040424Open ↗
▸BISADMINISTRATIVE OBJECTIONS3
07/14/2011320337346Open ↗
04/18/2011320293614Open ↗
06/23/2009320040424Open ↗
▸BISFINAL1
02/06/2023340780088Open ↗
▸Cost, Insurance & Ownership12
▸BISCOST AFFIDAVIT8
08/04/2021340780088Open ↗
12/09/2020340780088Open ↗
12/09/2020340780088Open ↗
Showing 3 of 8 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE3
09/07/2022340780088Open ↗
09/06/2022340780088Open ↗
08/29/2022340780088Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
02/06/2023340780088Open ↗
▸Filing & Intake Forms13
▸BISADDITIONAL INFORMATION9
08/04/2021340780088Open ↗
08/04/2021340780088Open ↗
08/04/2021340780088Open ↗
Showing 3 of 9 on file for this type
▸BISEFILING COVER SHEET3
07/14/2011320337346Open ↗
04/18/2011320293614Open ↗
06/23/2009320040424Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
11/16/2020340780088Open ↗
▸Other Documents6
▸DOB NOWSupporting Document3
08/13/2026B00462786-P2Open ↗
08/13/2026B00462786-P1Open ↗
08/13/2026B00462786-I1Open ↗
▸BISPLOT DIAGRAM1
05/17/2021340780088Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM1
03/30/2022340780088Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026B00462766-I1Open ↗