← Back
BuildNYC
Elevator apt, semi-fireproof without stores
Douglass I (NYCHA)
865 COLUMBUS AVENUE · BIN 1081300
💬 Discuss this project
1958Year Built
17Stories
D1Building Class
R7-2Zoning
689,340 sfGross Floor Area
900Units
LL97 Covered0 Active ViolationsFISP: SAFE
Elevator apt, semi-fireproof without stores · Owner of record: NYC Housing Authority · 340,742 sf lot · 2.02 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Whole building & multi-floor projectsGas piping replacement1 filing
RoofNYC Housing Authority23p · 5 filings · 20 docs
BulkheadNYC Housing Authority2p · 2 filings · 20 docs
CellarNYC Housing Authority1p · 1 filing · 3 docs
Site & exteriorSupported pipe scaffold installation8 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
New York City Housing Authority6110/04/2026
NYC Department of Housing Preservation and Development103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Thornton Tomasetti306/30/2026
Self Propriety (MD A Islam)411/21/2024
Odc Associates211/01/2024
Joel Phagoo P.E407/30/2024
RKTB Architects204/23/2024
Shenoy Engineering304/15/2024
Ikra Consulting303/25/2022
NYCHA105/25/2021
AK Consulting Services204/15/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Sharon Rader203/21/2026
Design 2147403/21/2026
AK Consulting Services1003/21/2026
Shenoy Engineering603/21/2026
Joel Phagoo P.E103/21/2026
Joel Phagoo P E103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Roma ScaffoldingScaffold1707/08/2026
J & N Construction GroupScaffold707/08/2026
MNK EnterprisesScaffold407/08/2026
J & N Construction GroupGeneral Contractor307/08/2026
Skyline P & HPlumbing203/22/2026
Zoria HousingGeneral Contractor203/21/2026
Zoria HousingScaffold207/08/2026
Alliance Elevator CompanyElectrical203/21/2026
Tri-State Electrical & Mechanical IElectrical103/21/2026
D.D.S. Mechanical PBG & HeatingPlumbing107/08/2026
Lit Mode Electrical ContgElectrical103/22/2026
Jemco Electric ContractorsElectrical103/22/2026
Thompson Electrical Main ServiceElectrical103/21/2026
The Maintenance CoElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MP Engineers & Architects1438306/30/2026
Socotec Engineering4983211/01/2024
MT Group798304/15/2024
Joel Phagoo, PE2416102/20/2024
Building Lifecycle
All (128)Filed (26)Permit Issued (26)Signed Off (11)Facade (FISP) (15)Violation (15)Inspection (1)Objection (4)Special Inspection (30)
10/06/2026
Signed off — Alteration
HEREWITH FILING ROOFING REPLACEMENT LIMITED FACADE WORK AT BULKHEADS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M08014413-I1
09/01/2026
Objection resolved — Resolved
07/01/2026
Objection raised — Scope
06/30/2026
Filed — Alteration
HEREWITH FILING STRUCTURAL WORK AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY
M08014423-P2
03/02/2026
Permit issued — General Construction
M08014413-I1-GC
03/02/2026
Permit issued — Structural
M08014423-I1-ST
08/05/2025
Signed off — Alteration
REMOVE AND REPLACE ALL GAS PIPING THROUGHOUT BUILDING INCLUDING RISER AND METERS. EXISTING GAS SERVICE TO REMAIN.
M00346109-I1
07/29/2025
Signed off — Alteration
INSTALLATION OF SUPPORTED PIPE SCAFFOLD AT 865 COLUMBUS AVENUE, MANHATTAN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
M01055796-I1
07/29/2025
Signed off — Alteration
INSTALLATION OF NEW SIDEWALK SHED AT 865 COLUMBUS AVENUE, MANHATTAN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
M01056189-I1
07/25/2025
Signed off — Alteration
M01051449-I1
05/28/2025
Permit issued — Supported Scaffold
M01055796-I1-SF
05/22/2025
Permit issued — Construction Fence
M01051449-I1-FN
05/22/2025
Permit issued — Sidewalk Shed
M01056189-I1-SH
12/06/2024
Signed off — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00885358-I1
12/06/2024
Signed off — Alteration
M00885369-I1
11/21/2024
Filed — Alteration
INSTALLATION OF NEW SIDEWALK SHED AT 865 COLUMBUS AVENUE, MANHATTAN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
M01056189-P1
11/20/2024
Signed off — Alteration
Exterior wall and roof bulkhead repairs. no change to use, occupancy or egress.
M00994500-I1
11/19/2024
Permit issued — General Construction
M08014413-I1-GC
11/14/2024
Inspection — Pass-Final PL - More than 10 Requested Floors
Pass
View inspection ↗
11/01/2024
Filed — Alteration
Exterior wall and roof bulkhead repairs. no change to use, occupancy or egress.
M00994500-P1
10/29/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
ALEXIS SCHLESSINGERMAN
10/29/2024
Special inspection requirement — Tenant Protection Plan Compliance
10/29/2024
Special inspection requirement — Final
TIMOTHY WEBB
10/29/2024
Special inspection requirement — Masonry
ALEXIS SCHLESSINGERMAN
10/01/2024
Signed off — Alteration
M01006379-I1
09/27/2024
Cycle 9 facade report signed — SAFE
09/13/2024
Cycle 9 facade report submitted
09/06/2024
Permit issued — Suspended Scaffold
M01083568-I1-SC
09/06/2024
Cycle 9 facade inspection completed
08/29/2024
Filed — Alteration
M01083568-I1
07/30/2024
Filed — Alteration
M00885369-P1
07/30/2024
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00885358-P1
07/22/2024
Permit issued — Plumbing
M00346109-I1-PL
06/21/2024
Permit issued — General Construction
M00994500-I1-GC
06/17/2024
Permit issued — Sidewalk Shed
M00885358-I1-SH
06/14/2024
Permit issued — Construction Fence
M00885369-I1-FN
05/28/2024
Permit issued — Supported Scaffold
M01055796-I1-SF
05/28/2024
Permit issued — Sidewalk Shed
M01056189-I1-SH
05/27/2024
Filed — Alteration
INSTALLATION OF SUPPORTED PIPE SCAFFOLD AT 865 COLUMBUS AVENUE, MANHATTAN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
M01055796-I1
05/27/2024
Filed — Alteration
INSTALLATION OF NEW SIDEWALK SHED AT 865 COLUMBUS AVENUE, MANHATTAN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
M01056189-I1
05/21/2024
Permit issued — Construction Fence
M01051449-I1-FN
05/20/2024
Filed — Alteration
M01051449-I1
05/01/2024
Special inspection requirement — Preliminary
JAMES WILSON
05/01/2024
Special inspection requirement — Fenestration air leakage
JAMES WILSON
05/01/2024
Special inspection requirement — Final
JAMES WILSON
05/01/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
JAMES WILSON
05/01/2024
Special inspection requirement — Masonry
JAMES WILSON
05/01/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
JAMES WILSON
05/01/2024
Special inspection requirement — Post-installed Anchors
JAMES WILSON
05/01/2024
Special inspection requirement — Energy Code Compliance Inspections
JAMES WILSON
05/01/2024
Special inspection requirement — Insulation placement and R values
JAMES WILSON
05/01/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
JAMES WILSON
05/01/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
JAMES WILSON
05/01/2024
Special inspection requirement — Tenant Protection Plan Compliance
JAMES WILSON
05/01/2024
Special inspection requirement — Masonry
JAMES WILSON
05/01/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
JAMES WILSON
05/01/2024
Special inspection requirement — Final
JAMES WILSON
04/30/2024
Filed — Alteration
HEREWITH FILING STRUCTURAL WORK AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY
M08014423-P1
04/23/2024
Filed — Alteration
HEREWITH FILING ROOFING REPLACEMENT LIMITED FACADE WORK AT BULKHEADS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M08014413-P1
04/15/2024
Filed — Alteration
REMOVE AND REPLACE ALL GAS PIPING THROUGHOUT BUILDING INCLUDING RISER AND METERS. EXISTING GAS SERVICE TO REMAIN.
M00346109-P2
Latest 60 of 128 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offJ & N Construction Group03/02/2026
DOB NOWStructuralSigned-offJ & N Construction Group03/02/2026
DOB NOWSupported ScaffoldSigned-offJ & N Construction Group05/28/2025
DOB NOWConstruction FenceSigned-offJ & N Construction Group05/22/2025
DOB NOWSidewalk ShedSigned-offJ & N Construction Group05/22/2025
DOB NOWGeneral ConstructionSigned-offJ & N Construction Group11/19/2024
DOB NOWSuspended ScaffoldPermit IssuedJ&N Construction Group09/06/2024
DOB NOWPlumbingSigned-offD.D.S. Mechanical PBG & Heating07/22/2024
DOB NOWGeneral ConstructionSigned-offZoria Housing06/21/2024
DOB NOWSidewalk ShedSigned-offMNK Enterprises06/17/2024
DOB NOWConstruction FenceSigned-offZoria Housing06/14/2024
DOB NOWSupported ScaffoldSigned-offJ & N Construction Group05/28/2024
DOB NOWSidewalk ShedSigned-offJ & N Construction Group05/28/2024
DOB NOWConstruction FenceSigned-offJ & N Construction Group05/21/2024
DOB NOWSuspended ScaffoldSigned-offZoria Housing02/28/2024
DOB NOWConstruction FenceSigned-offZoria Housing06/08/2023
DOB NOWSidewalk ShedSigned-offMNK Enterprises06/08/2023
DOB NOWConstruction FenceSigned-offRoma Scaffolding02/08/2023
DOB NOWSidewalk ShedSigned-offRoma Scaffolding10/17/2022
DOB NOWConstruction FenceSigned-offRoma Scaffolding02/02/2022
DOB NOWSidewalk ShedSigned-offRoma Scaffolding10/06/2021
DOB NOWConstruction FenceSigned-offRoma Scaffolding02/04/2021
DOB NOWConstruction FenceSigned-offRoma Scaffolding10/29/2020
DOB NOWSidewalk ShedSigned-offRoma Scaffolding10/01/2020
DOB NOWConstruction FenceSigned-offRoma Scaffolding11/14/2019
DOB NOWSidewalk ShedSigned-offRoma Scaffolding10/07/2019
BISPLISSUEDCape Plumbing05/28/2002
BISOTISSUEDNap Construction Co04/30/2002
BISOTISSUEDPhoenix Construiction05/14/1999
BISOTISSUEDPhoenix Construction10/30/1998
BISPLISSUEDReyvin Plumbing & Heating10/30/1998
BISOTISSUEDTrataors Plumbing03/31/1997
BISPLISSUEDTrataros Plumbing/Ace Construction03/31/1997
BISPLISSUEDV. C. Vitanza Sons11/04/1993
1 project · most recent 05/25/2021
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
05/25/2021——Ventilation Systems
Ventilation
Mitsubishi Electric LGH-F600RVX-E 600 CFM · Erv ×1
8 projects · most recent 06/27/2025
General Wiring
FiledStatusContractorScope
06/27/2025CompleteTri-State Electrical & Mechanical IGeneral Wiring
10/24/2024CompleteLit Mode Electrical Contg—
10/24/2024CompleteLit Mode Electrical Contg—
03/21/2024CompleteQ.Y. Electric—
03/15/2023CompleteQ.Y. Electric—
07/08/2022CompleteJemco Electric Contractors—
09/13/2019Permit IssuedRaiden Electric—
03/30/2018CompleteJemco Electric ContractorsGeneral Wiring
1 project · most recent 06/30/2026
Concrete
FiledStatusContractorScope
06/30/2026Signed-offJ & N Construction GroupConcrete
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
11/14/2024Pass-Final PL - More than 10 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 41
DateRequirementInspectorRole
10/29/2024Structural Stability – Alterations of existing buildingsALEXIS SCHLESSINGERMANspecial
10/29/2024Tenant Protection Plan Compliance—special
10/29/2024FinalTIMOTHY WEBBprogress
10/29/2024MasonryALEXIS SCHLESSINGERMANspecial
05/01/2024PreliminaryJAMES WILSONprogress
05/01/2024Fenestration air leakageJAMES WILSONenergy_progress
05/01/2024FinalJAMES WILSONprogress
05/01/2024Fire-Resistant Penetrations and JointsJAMES WILSONspecial
05/01/2024MasonryJAMES WILSONspecial
05/01/2024Structural Stability – Alterations of existing buildingsJAMES WILSONspecial
05/01/2024Post-installed AnchorsJAMES WILSONspecial
05/01/2024Energy Code Compliance InspectionsJAMES WILSONprogress
05/01/2024Insulation placement and R valuesJAMES WILSONenergy_progress
05/01/2024Fenestration and door U-factor and product ratingsJAMES WILSONenergy_progress
05/01/2024Fire-Resistant Penetrations and JointsJAMES WILSONspecial
05/01/2024Tenant Protection Plan ComplianceJAMES WILSONspecial
05/01/2024MasonryJAMES WILSONspecial
05/01/2024Structural Stability – Alterations of existing buildingsJAMES WILSONspecial
05/01/2024FinalJAMES WILSONprogress
04/12/2024Final—progress
04/12/2024Fenestration and door U-factor and product ratings—energy_progress
04/12/2024Fenestration air leakage—energy_progress
04/12/2024Insulation placement and R values—energy_progress
04/12/2024Fire-Resistant Penetrations and Joints—special
04/12/2024Masonry—special
Latest 25 of 41.
▾Documents — 132 on file (BIS + DOB NOW)
▸Plans & Drawings26
▸DOB NOWPlans/Sketch18
08/31/2026M00885358-I1Request digital key ↗
08/31/2026M00885358-P1Request digital key ↗
08/31/2026M00885369-I1Request digital key ↗
Showing 3 of 18 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed3
09/05/2026M00234462-P1Request digital key ↗
09/05/2026M00234462-P2Request digital key ↗
09/05/2026M00234462-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing3
09/04/2026M00346109-I1Request digital key ↗
09/04/2026M00346109-P1Request digital key ↗
08/15/2026M00346109-P2Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence2
09/05/2026M00263664-I1Request digital key ↗
08/15/2026M00263664-P1Request digital key ↗
▸Seals & Professional Certifications43
▸DOB NOWDPL-1: Design Professional Seal & Signature24
09/05/2026M00263664-I1Open ↗
09/05/2026M00234462-P2Open ↗
09/05/2026M00234462-I1Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature11
09/28/2026M08014413-I1Open ↗
09/28/2026M08014413-I1Open ↗
09/28/2026M08014413-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
09/28/2026M08014413-I1Open ↗
09/28/2026M08014413-I1Open ↗
09/28/2026M08014413-I1Open ↗
Showing 3 of 8 on file for this type
▸Safety & Tenant Protection8
▸DOB NOWTenant Protection Plan8
09/05/2026M00263664-I1Open ↗
09/05/2026M00234462-P1Open ↗
09/05/2026M00234462-I1Open ↗
Showing 3 of 8 on file for this type
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form4
08/27/2026M08014413-I1Open ↗
08/27/2026M08014423-I1Open ↗
08/25/2026M00994500-I1Open ↗
Showing 3 of 4 on file for this type
▸Approvals, Objections & Sign-offs45
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter26
09/05/2026M00263664-I1Open ↗
09/05/2026M00234462-P2Open ↗
09/05/2026M00234462-P1Open ↗
Showing 3 of 26 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)12
09/05/2026M00263664-I1Open ↗
09/05/2026M00234462-P2Open ↗
09/05/2026M00234462-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)4
09/05/2026M00234462-I1Open ↗
08/13/2026M00346109-I1Open ↗
08/13/2026M00994500-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDEP Variance (V5) letter3
08/27/2026M08014413-I1Open ↗
08/13/2026M00994500-I1Open ↗
08/13/2026M08014423-I1Open ↗
▸Other Documents6
▸DOB NOWManufacturer's Specifications2
08/13/2026M01083568-I1Open ↗
08/13/2026M01006379-I1Open ↗
▸DOB NOWCalculations2
08/13/2026M01083568-I1Open ↗
08/13/2026M01006379-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026M08014413-P1Open ↗
08/13/2026M08014413-I1Open ↗