ECB05/15/2026Work without permit. Fswo issued for all general construction masonry and structural. Atoi observed at expo # 3 of the resident a newly built unpermitted one story cmu horizontal and vertical structure with a w$2K due
ECB05/04/2026Observed at 10:14AM may 4,2026 front of the property at exposure #1 installed 4 split unit air conditioners, "tcl" along with electrical wiring. No electrical permit for this scope of work at the time of inspecNothing owed — awaiting certificate of correction
Two family brick · 0.88 FAR built · Flood zone X
Locations of Work
No floor-level scope or filed-document coverage on file for this building.
Nothing on file for this building.
Building Lifecycle
All (2)Violation (2)
05/15/2026
Work without permit. Fswo issued for all general construction masonry and structural. Atoi observed at expo # 3 of the resident a newly built…
ECB violation · open
05/04/2026
Observed at 10:14AM may 4,2026 front of the property at exposure #1 installed 4 split unit air conditioners, "tcl" along with electrical wiring. No…