← Back
Two family frame
868 EAST 156 STREET
BRONX · Longwood · BIN 2005150
💬 Discuss this project
1901Year Built
2Stories
B2Building Class
R7-1Zoning
2,376 sfGross Floor Area
2Units
1 Open Violation ▸
Two family frame · Owner of record: 156 EQUITY 868 LLC · 2,258 sf lot · 1.05 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentLandscapeCivilGeneralOther
Permit Issued — active, not yet Signed-off
Roof3p · 3 filings
Floor 9
Floor 8
Floor 7
Floor 61 filing
Floor 51 filing
Floor 4
Floor 3
Floor 21p · 1 filing
Floor 12p · 1 filing
Site & exterior4 filings · 11 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BLUE SHINE BUILDERS INC DBA BLUE SK4007/08/2026
OWNERS REP1304/09/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/24/2025$965K—— → —$406/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EXPRESS FILING INC2803/21/2026
AVALON DESIGNS403/21/2026
AE DESIGN SOLUTION1403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BLUE SHINE BUILDERS INCGeneral Contractor907/08/2026
INNOVATIVE CONSTR NYC LLCGeneral Contractor607/08/2026
CORE SCAFFOLD SYSTEMS INC.General Contractor504/09/2026
PRIME PIPING & HEATING INFire Protection307/08/2026
N TECH DESIGN OF AMERICAGeneral Contractor104/09/2026
A. M. PLUMBING COMPANYPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP56161408/03/2026
ADROIT ENGINEERING PLLC8885102/11/2025
Building Lifecycle
All (188)Filed (25)Permit Issued (25)Signed Off (14)Violation (19)Inspection (24)Objection (48)Special Inspection (30)Tax Incentive (3)
01/01/2027
485-x construction completed
09/10/2026
Objection raised — Other
09/10/2026
Objection raised — Other
09/10/2026
Objection raised — Other
09/10/2026
Objection raised — Other
09/10/2026
Objection raised — Other
09/10/2026
Objection raised — Other
09/10/2026
Objection raised — Other
09/07/2026
Violation issued (HPD, open)
A
08/10/2026
Signed off — New Building
PLUMBING SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION X01149034-I1
X01149034-S7
08/03/2026
Filed — New Building
PLUMBING SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION X01149034-I1
X01149034-A1
07/29/2026
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
07/29/2026
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
07/29/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
07/29/2026
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
07/29/2026
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
07/29/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
07/29/2026
Special inspection requirement — Metering
FAHAD FATEH
07/29/2026
Special inspection requirement — Fenestration areas
FAHAD FATEH
07/29/2026
Special inspection requirement — Air barrier — testing
FAHAD FATEH
07/29/2026
Special inspection requirement — Interior lighting power
FAHAD FATEH
07/29/2026
Special inspection requirement — Exterior lighting power
FAHAD FATEH
07/29/2026
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
07/29/2026
Special inspection requirement — Lighting controls
FAHAD FATEH
07/29/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
FAHAD FATEH
07/29/2026
Special inspection requirement — Lighting in dwelling units
FAHAD FATEH
07/29/2026
Special inspection requirement — Protection of exposed foundation insulation
FAHAD FATEH
07/29/2026
Special inspection requirement — Maintenance information
FAHAD FATEH
06/26/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/26/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/11/2026
Violation issued (HPD, closed)
A
03/19/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/07/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
02/26/2026
Signed off — New Building
PLUMBING SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION X01149034-I1
X01149034-S8
02/02/2026
Inspection — Certified StandPipe-Fire Pump (SD)-Fire Pump Test
Certified
View inspection ↗
02/02/2026
Inspection — Certified StandPipe-SD-Fixtures-Finish-SD
Certified
View inspection ↗
01/29/2026
Inspection — Certified StandPipe - SD - Alarm Sys 64/09 - Finish
Certified
View inspection ↗
01/29/2026
Inspection — Certified StandPipe - SD - Hydrostatic 63/09 Test (100 Foot Increments)
Certified
View inspection ↗
01/29/2026
Inspection — Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)
Certified
View inspection ↗
01/29/2026
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
01/28/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/27/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
01/23/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X01265406-I1
01/23/2026
Signed off — Alteration
X01265404-I1
01/23/2026
Signed off — Alteration
X01259821-I1
01/23/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X01259824-I1
01/23/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
01/21/2026
Special inspection requirement — Maintenance information
FAHAD FATEH
01/21/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
01/21/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
01/21/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
FAHAD FATEH
01/21/2026
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
01/21/2026
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
01/08/2026
Signed off — New Building
PLUMBING SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION X01149034-I1
X01149034-S2
01/06/2026
Signed off — New Building
PLUMBING SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION X01149034-I1
X01149034-S6
12/18/2025
Violation issued (ECB, closed)
Construction
12/18/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/17/2025
Filed — New Building
PLUMBING SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION X01149034-I1
X01149034-P9
12/17/2025
Permit issued — Standpipe
X01149034-S7-EW-SD
12/17/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
Latest 60 of 188 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStandpipeSigned-offA M B MECHANICAL INC12/17/2025
DOB NOWStructuralSigned-offINNOVATIVE CONSTR NYC LLC08/28/2025
DOB NOWSupport of ExcavationSigned-offINNOVATIVE CONSTR NYC LLC08/28/2025
DOB NOWConstruction FenceSigned-offINNOVATIVE CONSTR NYC LLC08/28/2025
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC08/28/2025
DOB NOWEarth WorkSigned-offINNOVATIVE CONSTR NYC LLC08/28/2025
DOB NOWMechanical SystemsSigned-offINNOVATIVE CONSTR NYC LLC08/28/2025
DOB NOWGeneral ConstructionPermit IssuedINNOVATIVE CONSTR NYC LLC08/28/2025
DOB NOWGeneral ConstructionPermit IssuedBLUE SHINE BUILDERS INC08/12/2025
DOB NOWSupported ScaffoldSigned-offCORE SCAFFOLD SYSTEMS INC08/04/2025
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC07/28/2025
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC07/23/2025
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC07/23/2025
DOB NOWGeneral ConstructionPermit IssuedBLUE SHINE BUILDERS INC06/30/2025
DOB NOWStandpipeSigned-offA M B MECHANICAL INC06/10/2025
DOB NOWStructuralSigned-offBLUE SHINE BUILDERS INC06/10/2025
DOB NOWStandpipeSigned-offA M B MECHANICAL INC06/10/2025
DOB NOWMechanical SystemsSigned-offBLUE SHINE BUILDERS INC06/09/2025
DOB NOWPlumbingSigned-offA. M. PLUMBING COMPANY06/05/2025
DOB NOWStructuralSigned-offBLUE SHINE BUILDERS INC05/28/2025
DOB NOWFoundationSigned-offBLUE SHINE BUILDERS INC05/27/2025
DOB NOWSupport of ExcavationSigned-offBLUE SHINE BUILDERS INC05/27/2025
DOB NOWConstruction FenceSigned-offBLUE SHINE BUILDERS INC05/27/2025
DOB NOWFull DemolitionSigned-offN TECH DESIGN OF AMERICA05/01/2025
DOB NOWConstruction FenceSigned-offBLUE SHINE BUILDERS INC02/25/2025
BISOTISSUEDAMERGY SOLAR INC03/21/2019
1 project · most recent 08/03/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
08/03/2026Signed-offINNOVATIVE CONSTR NYC LLCHeating and Air Conditioning Systems
Heat / Cool
Amana PTH093J30 9,000 BTU · Heat Pump Outdoor ×42
PTH123J30 11,600 BTU · Heat Pump Outdoor ×24
X01149034 7,000 BTU · Heat Pump Outdoor ×24
PTH153J30 14,400 BTU · Heat Pump Outdoor ×13
PBH113G35CC 11,500 BTU · Heat Pump Outdoor ×7
1 project · most recent 08/03/2026
Sprinkler System
FiledStatusContractorScope
08/03/2026Signed-offPRIME PIPING & HEATING INSprinkler System
1 project · most recent 08/03/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
08/03/2026Signed-offA. M. PLUMBING COMPANYGas, Storm, Water/Sanitary
7 projects · most recent 05/06/2026
General Wiring
FiledStatusContractorScope
05/06/2026CompleteHIVOLTS ELECTRICAL INC—
01/21/2026CompleteHIVOLTS ELECTRICAL INCGeneral Wiring
07/23/2025CompleteSOLAS ELECTRICAL CORP—
07/23/2025CompleteSOLAS ELECTRICAL CORP—
07/02/2025CompleteINTELOGIC ELECTRIC, INC.General Wiring
05/26/2025CompleteHIVOLTS ELECTRICAL INC—
03/21/2019CompleteACE ELEC'L CONSTRUCTION—
1 project · most recent 08/03/2026
Concrete
FiledStatusContractorScope
08/03/2026Signed-offA M B MECHANICAL INCConcrete
1 project · most recent 08/03/2026
Fence
FiledStatusContractorScope
08/03/2026Signed-offA M B MECHANICAL INCFence
1 project · most recent 08/03/2026
Earthwork
FiledStatusContractorScope
08/03/2026Signed-offA M B MECHANICAL INCEarthwork
▾Field Inspections (DOB CAP) — 24
DateTypeResultReport
06/26/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/26/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/19/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/07/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/02/2026Certified StandPipe-Fire Pump (SD)-Fire Pump TestCertifiedView ↗
02/02/2026Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
01/29/2026Certified StandPipe - SD - Alarm Sys 64/09 - FinishCertifiedView ↗
01/29/2026Certified StandPipe - SD - Hydrostatic 63/09 Test (100 Foot Increments)CertifiedView ↗
01/29/2026Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
01/29/2026Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
01/28/2026Pass-Final CND-Occupancy InspectionPassView ↗
01/27/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
01/23/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/18/2025Pass-Final CND-Occupancy InspectionPassView ↗
10/21/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
09/09/2025Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
07/31/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
07/31/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
07/31/2025Pass-Final CND-Occupancy InspectionPassView ↗
12/05/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
12/05/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/05/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
07/24/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
07/24/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 85
DateRequirementInspectorRole
07/29/2026Lighting controlsFAHAD FATEHenergy_progress
07/29/2026Fenestration areasFAHAD FATEHenergy_progress
07/29/2026Maintenance informationFAHAD FATEHenergy_progress
07/29/2026Protection of exposed foundation insulationFAHAD FATEHenergy_progress
07/29/2026Lighting in dwelling unitsFAHAD FATEHenergy_progress
07/29/2026Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
07/29/2026Interior lighting powerFAHAD FATEHenergy_progress
07/29/2026MeteringFAHAD FATEHenergy_progress
07/29/2026Exterior lighting powerFAHAD FATEHenergy_progress
07/29/2026Fenestration air leakageFAHAD FATEHenergy_progress
07/29/2026Insulation placement and R valuesFAHAD FATEHenergy_progress
07/29/2026Air barrier - visual inspectionFAHAD FATEHenergy_progress
07/29/2026Air barrier — testing FAHAD FATEHenergy_progress
07/29/2026Fire-Resistance Rated ConstructionFAHAD FATEHprogress
07/29/2026Energy Code Compliance InspectionsFAHAD FATEHprogress
07/29/2026Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
07/29/2026Exterior Insulation and Finish Systems (EIFS)FAHAD FATEHspecial
01/21/2026Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
01/21/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationFAHAD FATEHspecial
01/21/2026HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
01/21/2026HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
01/21/2026Maintenance informationFAHAD FATEHenergy_progress
01/21/2026HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
12/17/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
12/17/2025Maintenance informationFAHAD FATEHenergy_progress
Latest 25 of 85.
▾Documents — 160 on file (BIS + DOB NOW)
▸Plans & Drawings24
▸DOB NOWPlans/Sketch24
08/20/2026X01179448-I1Request digital key ↗
08/20/2026X01179519-I1Request digital key ↗
08/18/2026X01261551-I1Request digital key ↗
Showing 3 of 24 on file for this type
▸Applications & Permits7
▸BISPLAN / WORK APPROVAL APPLICATION5
12/16/2025240362308Open ↗
06/30/2025240362308Open ↗
06/13/2025220743211Open ↗
Showing 3 of 5 on file for this type
▸BISWORK PERMIT APPLICATION1
03/21/2019240244375Open ↗
▸DOB NOWHPD - Permit Notice1
08/20/2026X01149034-I1Open ↗
▸Zoning, Tax Lot & Property Records25
▸DOB NOWRestrictive Declaration/Easement 114
08/17/2026X01149034-A1Open ↗
08/13/2026X01149034-S8Open ↗
08/13/2026X01149034-P4Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWZD1: DOB Zoning Diagram3
08/17/2026X01149034-A1Open ↗
08/13/2026X01149034-I1Open ↗
08/13/2026X01149034-P2Open ↗
▸DOB NOWZoning Exhibit form (1-5)3
08/17/2026X01149034-A1Open ↗
08/13/2026X01149034-P2Open ↗
08/13/2026X01149034-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp2
08/13/2026X01149034-P2Open ↗
08/13/2026X01149034-I1Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
07/09/2025220743211Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
08/01/2025220743211Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
08/01/2025220743211Open ↗
▸Seals & Professional Certifications51
▸DOB NOWDPL-1: Design Professional Seal & Signature25
08/20/2026X01179448-I1Open ↗
08/20/2026X01179519-I1Open ↗
08/18/2026X01261551-I1Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature16
09/19/2026X01149034-S3Open ↗
09/19/2026X01149034-S3Open ↗
09/02/2026X01149034-P1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
09/19/2026X01149034-S3Open ↗
08/31/2026X01149034-S8Open ↗
08/26/2026X01149034-I1Open ↗
Showing 3 of 9 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
12/10/2018240244375Open ↗
▸Trade Schedules & Equipment6
▸DOB NOWGas Cut-Off1
08/13/2026X01179448-I1Open ↗
▸DOB NOWElectric Cut-Off1
08/13/2026X01179448-I1Open ↗
▸DOB NOWWater Cut-Off1
08/13/2026X01179448-I1Open ↗
▸DOB NOWSewer Cut-Off1
08/13/2026X01179448-I1Open ↗
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/13/2026X01149034-I1Open ↗
▸DOB NOWStandpipe Alarms Drawings1
08/13/2026X01149034-I1—
▸Safety & Tenant Protection8
▸DOB NOWStreet Tree Checklist3
08/17/2026X01149034-A1Open ↗
08/13/2026X01149034-P2Open ↗
08/13/2026X01149034-I1Open ↗
▸BISBPP: STREET TREES SITE PLAN1
06/30/2025240362308Open ↗
▸BISTENANT PROTECTION PLAN AND NOTES1
12/10/2018240244375Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026X01149034-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026X01149034-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026X01149034-I1Open ↗
▸Environmental & Asbestos3
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
12/10/2018240244375Open ↗
▸DOB NOWRodent Control1
08/13/2026X01179448-I1Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/20/2026X01179448-I1Open ↗
▸Energy Compliance3
▸BISSOLAR TAX ABATEMENT APPLICATION1
12/10/2018240244375Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
12/10/2018240244375Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026X01149034-S8Open ↗
▸Inspections & Test Reports7
▸DOB NOWSOIL REPORT3
08/13/2026X01149034-S3Open ↗
08/13/2026X01149034-P1Open ↗
08/13/2026X01149034-S9Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram2
08/13/2026X01149034-S3Open ↗
08/13/2026X01149034-S9Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY1
12/10/2018240244375Open ↗
▸DOB NOWConcrete Testing Exception Report1
08/13/2026X01149034-S2Open ↗
▸Approvals, Objections & Sign-offs2
▸BISLETTERS - SUPPORTING DOCUMENTATION2
07/09/2025220743211Open ↗
12/10/2018240244375Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
12/10/2018240244375Open ↗
▸Filing & Intake Forms5
▸BISEFILING JOB APPLICATION COVER SHEET2
06/30/2025240362308Open ↗
12/10/2018240244375Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
06/30/2025240362308Open ↗
▸BISEFILING COVER SHEET1
04/04/2025220743211Open ↗
▸BISADDITIONAL INFORMATION1
03/12/2019240244375Open ↗
▸Other Documents18
▸DOB NOWProperty Ownership Certification4
08/20/2026X01179448-I1Open ↗
08/17/2026X01149034-I1Open ↗
08/17/2026X01149034-A1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSite Survey: Initial3
08/17/2026X01149034-A1Open ↗
08/13/2026X01149034-P2Open ↗
08/13/2026X01149034-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/17/2026X01149034-A1Open ↗
08/13/2026X01149034-P2Open ↗
08/13/2026X01149034-I1Open ↗
▸DOB NOWAdjoining Owners Notification2
08/13/2026X01149034-S9Open ↗
08/13/2026X01149034-S3Open ↗
▸BISPD1 PLOT DIAGRAM1
08/01/2025220743211Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
06/30/2025240362308Open ↗
▸DOB NOWStructure Photographs1
08/13/2026X01179448-I1Open ↗
▸DOB NOWFull Demo: 10-Day Notice1
08/13/2026X01179448-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026X01149034-I1Open ↗
▸DOB NOWCommunity Board Notification1
08/13/2026X01179448-I1Open ↗