868 EAST 8 STREET
BROOKLYN · Mapleton-Midwood (West) · BIN 3170492
💬 Discuss this project
1920Year Built
2.5Stories
A1Building Class
R2XZoning
2,115 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · Owner of record: 868 E 8TH LLC · 3,013 sf lot · 0.7 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingGeneral
Roof15p · 1 filing · 20 docs
Attic21p · 1 filing · 20 docs
Floor 221p · 1 filing · 20 docs
Floor 121p · 1 filing · 20 docs
Cellar21p · 1 filing · 20 docs
Site & exterior25p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ATTILIO DEVELOPERS103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
07/24/2018$2.0M—— → —$946/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ALFRED MIERZEJEWSKI ARCHITECT309/03/2024
MSM ENGINEERING SERVICES, PLLC212/27/2023
ROBERT SIQECA PE406/30/2022
REAL ENGINEERING INC.108/25/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ACDE GROUP1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ATTILIO DEVELOPERS CORPGeneral Contractor907/08/2026
PIPESTYLISTS, INCPlumbing907/08/2026
T T PLUMBINGGeneral Contractor203/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
M. INT'L ENGINEERING PLLC3129709/03/2024
AR-TECH ENGINEERING, P.C.6659206/30/2022
Building Lifecycle
All (137)Filed (9)Permit Issued (6)Signed Off (4)Violation (3)Inspection (5)Objection (80)Special Inspection (30)
01/13/2025
Signed off — Alteration
FILING FOR PLUMBING WORK IN CONJUNCTION WITH ALT 1 APPLICATION NUMBER B00510762-I1.
B00510762-I1
09/10/2024
Special inspection requirement — Masonry
NANIK MASSAND
09/10/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
NANIK MASSAND
09/10/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
NANIK MASSAND
09/10/2024
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
NANIK MASSAND
09/10/2024
Special inspection requirement — Permanent certificate
NANIK MASSAND
09/10/2024
Special inspection requirement — Maintenance information
NANIK MASSAND
09/10/2024
Special inspection requirement — Insulation placement and R values
NANIK MASSAND
09/10/2024
Special inspection requirement — Protection of exposed foundation insulation
NANIK MASSAND
09/10/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
NANIK MASSAND
09/10/2024
Special inspection requirement — Concrete - Cast-In-Place
NANIK MASSAND
09/10/2024
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
NANIK MASSAND
09/10/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
NANIK MASSAND
09/10/2024
Special inspection requirement — Masonry
NANIK MASSAND
09/10/2024
Special inspection requirement — Final
Feng Zhang
09/10/2024
Special inspection requirement — Fenestration air leakage
NANIK MASSAND
09/10/2024
Special inspection requirement — Protection of exposed foundation insulation
NANIK MASSAND
09/10/2024
Special inspection requirement — Maintenance information
NANIK MASSAND
09/10/2024
Special inspection requirement — Permanent certificate
NANIK MASSAND
09/10/2024
Special inspection requirement — Insulation placement and R values
NANIK MASSAND
09/10/2024
Special inspection requirement — Fenestration air leakage
MOHAMED MAHMOUD
09/10/2024
Special inspection requirement — Final
Feng Zhang
09/10/2024
Special inspection requirement — Concrete - Cast-In-Place
NANIK MASSAND
09/06/2024
Signed off — Alteration
FILING FOR PLUMBING WORK IN CONJUNCTION WITH ALT 1 APPLICATION NUMBER B00510762-I1.
B00510762-S2
09/06/2024
Objection raised — Other
09/06/2024
Objection resolved — Addressed
09/03/2024
Filed — Alteration
FILING FOR PLUMBING WORK IN CONJUNCTION WITH ALT 1 APPLICATION NUMBER B00510762-I1.
B00510762-P5
08/29/2024
Special inspection requirement — Masonry
NANIK MASSAND
08/29/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
NANIK MASSAND
08/29/2024
Special inspection requirement — Final
Feng Zhang
08/29/2024
Special inspection requirement — Insulation placement and R values
NANIK MASSAND
08/29/2024
Special inspection requirement — Fenestration air leakage
NANIK MASSAND
08/29/2024
Special inspection requirement — Maintenance information
NANIK MASSAND
08/29/2024
Special inspection requirement — Protection of exposed foundation insulation
NANIK MASSAND
08/29/2024
Special inspection requirement — Permanent certificate
NANIK MASSAND
07/26/2024
Signed off — Alteration
FILING FOR PLUMBING WORK IN CONJUNCTION WITH ALT 1 APPLICATION NUMBER B00510762-I1.
B00510762-S5
05/14/2024
Signed off — Alteration
FILING FOR PLUMBING WORK IN CONJUNCTION WITH ALT 1 APPLICATION NUMBER B00510762-I1.
B00510762-S1
12/27/2023
Filed — Alteration
FILING FOR PLUMBING WORK IN CONJUNCTION WITH ALT 1 APPLICATION NUMBER B00510762-I1.
B00510762-P4
11/18/2023
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
04/05/2023
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
03/29/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
03/29/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/29/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
03/02/2023
Permit issued — Plumbing
B00510762-S5-PL
09/10/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/10/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/07/2022
Objection resolved — Addressed
07/06/2022
Objection raised — Admin
06/30/2022
Filed — Alteration
FILING FOR PLUMBING WORK IN CONJUNCTION WITH ALT 1 APPLICATION NUMBER B00510762-I1.
B00510762-P2
05/27/2022
Permit issued — General Construction
B00510762-I1-GC
05/06/2022
Objection resolved — Addressed
05/06/2022
Objection resolved — Addressed
05/03/2022
Violation issued (ECB, closed)
Construction
03/25/2022
Permit issued — Foundation
B00510762-S4-FO
02/02/2022
Filed — Alteration
FILING FOR PLUMBING WORK IN CONJUNCTION WITH ALT 1 APPLICATION NUMBER B00510762-I1.
B00510762-S5
11/24/2021
Permit issued — Construction Fence
B00510762-S1-FN
11/23/2021
Permit issued — General Construction
B00510762-I1-GC
11/23/2021
Permit issued — Structural
B00510762-S2-ST
10/26/2021
Objection resolved — Addressed
10/14/2021
Objection resolved — Addressed
Latest 60 of 137 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offT & T PLUMBING INC03/02/2023
DOB NOWGeneral ConstructionSigned-offATTILIO DEVELOPERS05/27/2022
DOB NOWFoundationPermit IssuedATTILIO DEVELOPERS03/25/2022
DOB NOWConstruction FenceSigned-offATTILIO DEVELOPERS11/24/2021
DOB NOWGeneral ConstructionSigned-offATTILIO DEVELOPERS11/23/2021
DOB NOWStructuralSigned-offATTILIO DEVELOPERS11/23/2021
1 project · most recent 09/03/2024
Gas Water/Sanitary
FiledStatusContractorScope
09/03/2024Signed-offT&T PLUMBING INCGas, Water/Sanitary
1 project · most recent 02/02/2023
General Wiring
FiledStatusContractorScope
02/02/2023Permit IssuedR. STRANGIS ELECL CONTRSGeneral Wiring
1 project · most recent 09/03/2024
Steel Wood
FiledStatusContractorScope
09/03/2024Signed-offT&T PLUMBING INCSteel, Wood
1 project · most recent 09/03/2024
Fence
FiledStatusContractorScope
09/03/2024Signed-offT&T PLUMBING INCFence
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
11/18/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
04/05/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
03/29/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/29/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/29/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 53
DateRequirementInspectorRole
09/10/2024MasonryNANIK MASSANDspecial
09/10/2024Structural Stability – Alterations of existing buildingsNANIK MASSANDspecial
09/10/2024Fire-Resistant Penetrations and JointsNANIK MASSANDspecial
09/10/2024Excavations - Sheeting, Shoring, and BracingNANIK MASSANDspecial
09/10/2024Permanent certificateNANIK MASSANDenergy_progress
09/10/2024Maintenance informationNANIK MASSANDenergy_progress
09/10/2024Insulation placement and R valuesNANIK MASSANDenergy_progress
09/10/2024Protection of exposed foundation insulationNANIK MASSANDenergy_progress
09/10/2024Fire-Resistant Penetrations and JointsNANIK MASSANDspecial
09/10/2024Concrete - Cast-In-PlaceNANIK MASSANDspecial
09/10/2024Excavations - Sheeting, Shoring, and BracingNANIK MASSANDspecial
09/10/2024Structural Stability – Alterations of existing buildingsNANIK MASSANDspecial
09/10/2024MasonryNANIK MASSANDspecial
09/10/2024FinalFeng Zhangprogress
09/10/2024Fenestration air leakageNANIK MASSANDenergy_progress
09/10/2024Protection of exposed foundation insulationNANIK MASSANDenergy_progress
09/10/2024Maintenance informationNANIK MASSANDenergy_progress
09/10/2024Permanent certificateNANIK MASSANDenergy_progress
09/10/2024Insulation placement and R valuesNANIK MASSANDenergy_progress
09/10/2024Fenestration air leakageMOHAMED MAHMOUDenergy_progress
09/10/2024FinalFeng Zhangprogress
09/10/2024Concrete - Cast-In-PlaceNANIK MASSANDspecial
08/29/2024MasonryNANIK MASSANDspecial
08/29/2024Structural Stability – Alterations of existing buildingsNANIK MASSANDspecial
08/29/2024FinalFeng Zhangprogress
Latest 25 of 53.
▾Documents — 103 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
09/01/2026B00510762-P4Request digital key ↗
09/01/2026B00510762-P6Request digital key ↗
09/01/2026B00510762-S1Request digital key ↗
Showing 3 of 10 on file for this type
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram3
09/01/2026B00510762-P6Open ↗
08/15/2026B00510762-I1Open ↗
08/15/2026B00510762-P5Open ↗
▸Seals & Professional Certifications60
▸DOB NOWSpecial Inspector Seal & Signature27
09/25/2026B00510762-P6Open ↗
09/25/2026B00510762-P6Open ↗
09/25/2026B00510762-P6Open ↗
Showing 3 of 27 on file for this type
▸DOB NOWProgress Inspector Seal & Signature22
09/25/2026B00510762-P6Open ↗
09/25/2026B00510762-P6Open ↗
09/25/2026B00510762-P6Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature11
09/01/2026B00510762-S6Open ↗
09/01/2026B00510762-P2Open ↗
09/01/2026B00510762-P4Open ↗
Showing 3 of 11 on file for this type
▸Trade Schedules & Equipment3
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
09/01/2026B00510762-P6Open ↗
08/15/2026B00510762-I1Open ↗
08/15/2026B00510762-P5Open ↗
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
09/01/2026B00510762-S5Open ↗
09/01/2026B00510762-P4Open ↗
09/01/2026B00510762-S3Open ↗
Showing 3 of 10 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
09/01/2026B00510762-S5Open ↗
08/15/2026B00510762-I1Open ↗
▸Cost, Insurance & Ownership2
▸DOB NOWCertification by Insurance Broker or Agency1
08/15/2026B00510762-I1Open ↗
▸DOB NOWCertificate of Insurance1
08/15/2026B00510762-I1Open ↗
▸Other Documents13
▸DOB NOWPlot Diagram6
09/01/2026B00510762-P6Open ↗
09/01/2026B00510762-S3Open ↗
08/15/2026B00510762-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSite Survey: Initial3
09/01/2026B00510762-P6Open ↗
08/15/2026B00510762-I1Open ↗
08/15/2026B00510762-P5Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
09/01/2026B00510762-P6Open ↗
08/15/2026B00510762-I1Open ↗
08/15/2026B00510762-P5Open ↗
▸DOB NOWAdditional Insured Authorizations1
08/15/2026B00510762-I1Open ↗