← Back
BuildNYC
Limited service hotel, often national chain
Super 8 by Wyndham Bronx Near Stadium
869 CONCOURSE VILLAGE WEST · BIN 2130373
💬 Discuss this project
2024Year Built
11Stories
H3Building Class
C6-2Zoning
31,393 sfGross Floor Area
2Units
22 Active Violations 18 unresolved · 4 paperwork only ▸
Limited service hotel, often national chain · Owner of record: Bronx River Hotel · 4,775 sf lot · 6.57 FAR built · Flood zone X
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Whole building & multi-floor projects5 filings
Roof2 filings
Floor 61 filing
Floor 51 filing
Floor 4
Floor 3
Floor 2
Floor 12 filings
Cellar1 filing
Site & exterior3 filings
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
3551 Boston Associates3007/08/2026
Rathod1007/08/2026
Liberty SQR in Ozone Park1007/08/2026
Bronx River Hotel803/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/09/2023$6.0M—3551 Boston Associates → BRONX RIVER HOTEL LLC— not available
03/30/2017$470K—Private party → 3551 Boston Associates— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Mje Professional Services910/29/2026
TK Engineering1302/28/2026
Tohfaz Uddin PE203/17/2025
LMW Engineering Group408/23/2024
M.S. Savani Architect109/05/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
M.S. Savani Architect2403/21/2026
SNR Expediting Design1403/21/2026
Metro Vibe603/21/2026
C-Space Design403/21/2026
A1 Expediting Service403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
A & H InstallationScaffold1410/30/2026
Pacific RimScaffold407/08/2026
DasrScaffold407/08/2026
Reliable EnterprisesScaffold304/09/2026
Doug's Plumbing & Heating ServiceFire Protection307/08/2026
Plumbing-It MechanicalPlumbing207/08/2026
Vitello Sewer W.M. H&P ServicesPlumbing107/08/2026
Prestige Electrical ContgElectrical103/21/2026
DasrGeneral Contractor107/08/2026
Pacific Plumbing & HeatingFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF Services5616302/28/2026
LMW Engineering Group279106/19/2020
Building Lifecycle
10/29/2026
Filed — Alteration
X01481925-I1
10/29/2026
Permit issued — Sidewalk Shed
X01481925-I1-SH
10/24/2026
Observed proposed 16 story mixed use NB with supported scaffold erected at exp 1 & 3. At time of inspection i observed supported scaffolding…
ECB violation · open
10/20/2026
Signed off — Alteration
X01176955-I1
10/14/2026
Observed supported scaffold installed expo 1 &3. Base of scaffold is with 2 foot frames with connections on both shed and concrete slab on 2ND fl…
ECB violation · open
147 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOW—A & H Installation—
DOB NOW—A & H Installation—
DOB NOW—A & H Installation—
DOB NOW—Vitello Sewer W.M. H&P Services—
DOB NOW—A H Installation—
DOB NOW—A H Installation—
DOB NOW—Reliable Enterprises—
DOB NOW—A H Installation—
DOB NOW—Dasr—
DOB NOW—JVR Plumbing and Heating—
DOB NOW—A H Installation—
DOB NOW—A H Installation—
DOB NOW—Dasr—
DOB NOW—A H Installation—
DOB NOW—A H Installation—
DOB NOW—Reliable Enterprises—
DOB NOW—A H Installation—
DOB NOW—Doug's Plumbing & Heating Service—
DOB NOW—Doug's Plumbing & Heating Service—
DOB NOW—Doug's Plumbing & Heating Service—
DOB NOW—Dasr—
DOB NOW—A H Installation—
DOB NOW—JVR Plumbing and Heating—
DOB NOW—Pacific Plumbing & Heating—
DOB NOW—Dasr—
DOB NOW—Chun Lin Chiang—
DOB NOW—Chun Lin Chiang—
BIS—Dasr—
BIS—Dasr—
BIS—Dasr—
BIS—Dasr—
BIS—Dasr—
BIS—Dasr—
BIS—Dasr—
Nothing on file for this building.
Nothing on file for this building.
246 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account