| Owner | Filings | Most Recent |
|---|---|---|
| 3551 BOSTON ASSOCIATES | 30 | 07/08/2026 |
| RELIABLE ENTERPRISES | 11 | 04/09/2026 |
| RATHOD | 10 | 07/08/2026 |
| DASR | 10 | 07/08/2026 |
| LIBERTY SQR IN OZONE PARK LLC | 10 | 07/08/2026 |
| Date | Price | Unit | Seller → Buyer | $/sf |
|---|---|---|---|---|
| 03/09/2023 | $6.0M | — | 3551 BOSTON ASSOCIATES LLC → BRONX RIVER HOTEL LLC | — not available |
| 03/30/2017 | $470K | — | Private party → 3551 BOSTON ASSOCIATES LLC | — not available |
| Firm | Filings | Most Recent |
|---|---|---|
| TK ENGINEERING | 13 | 02/28/2026 |
| MJE PROFESSIONAL SERVICES | 8 | 09/11/2025 |
| TOHFAZ UDDIN PE PC | 2 | 03/17/2025 |
| LMW ENGINEERING GROUP LLC | 4 | 08/23/2024 |
| M.S. SAVANI ARCHITECT, PC | 1 | 09/05/2019 |
| Representative | Filings | Most Recent |
|---|---|---|
| M.S. SAVANI ARCHITECT,P.C. | 24 | 03/21/2026 |
| SNR EXPEDITING DESIGN | 14 | 03/21/2026 |
| METRO VIBE | 6 | 03/21/2026 |
| C-SPACE DESIGN | 4 | 03/21/2026 |
| A1 EXPEDITING SERVICE | 4 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| A & H INSTALLATION INC | General Contractor | 13 | 09/09/2026 |
| DASR CORP | General Contractor | 5 | 07/08/2026 |
| PACIFIC RIM, LLC | General Contractor | 4 | 07/08/2026 |
| RELIABLE ENTERPRISES INC | General Contractor | 3 | 04/09/2026 |
| DOUG'S PLBG & HTG SERV CO | Fire Protection | 3 | 07/08/2026 |
| PLUMB-IT MECHANICAL INC | Plumbing | 2 | 07/08/2026 |
| VITELLO SEWER W.M H&P SER | Plumbing | 1 | 07/08/2026 |
| RICHARD NEU | Electrical | 1 | 03/21/2026 |
| VLADIMIR MUKHTAROV | Electrical | 1 | 03/21/2026 |
| PACIFIC PLBG. & HTG. CORP | Fire Protection | 1 | 07/08/2026 |
| RICHARD NEU | Electrical | 1 | 03/22/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| HRF SERVICES CORP | 5616 | 3 | 02/28/2026 |
| LMW ENGINEERING GROUP LLC | 279 | 1 | 06/19/2020 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Protection and Mechanical Methods | Permit Issued | A & H INSTALLATION INC | 09/08/2026 |
| DOB NOW | Sidewalk Shed | Permit Issued | A & H INSTALLATION INC | 09/02/2026 |
| DOB NOW | Plumbing | Signed-off | VITELLO SEWER W.M H&P SER | 05/18/2026 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | A H INSTALLATION | 02/17/2026 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | A H INSTALLATION | 02/17/2026 |
| DOB NOW | Supported Scaffold | Permit Issued | RELIABLE ENTERPRISES INC | 02/03/2026 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | A H INSTALLATION | 01/29/2026 |
| DOB NOW | Construction Fence | Permit Issued | DASR CORP | 01/07/2026 |
| DOB NOW | Sprinklers | Permit Issued | JVR PLBG AND HEATING INC | 11/20/2025 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | A H INSTALLATION | 09/09/2025 |
| DOB NOW | Sidewalk Shed | Permit Issued | A H INSTALLATION | 09/04/2025 |
| DOB NOW | Structural | Signed-off | DASR CORP | 04/28/2025 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | A H INSTALLATION | 03/18/2025 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | A H INSTALLATION | 03/18/2025 |
| DOB NOW | Supported Scaffold | Permit Issued | RELIABLE ENTERPRISES INC | 03/04/2025 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | A H INSTALLATION | 02/10/2025 |
| DOB NOW | Standpipe | Permit Issued | DOUG'S PLBG & HTG SERV CO | 01/17/2025 |
| DOB NOW | Sprinklers | Permit Issued | DOUG'S PLBG & HTG SERV CO | 01/16/2025 |
| DOB NOW | Standpipe | Permit Issued | DOUG'S PLBG & HTG SERV CO | 01/16/2025 |
| DOB NOW | Construction Fence | Permit Issued | DASR CORP | 10/24/2024 |
| DOB NOW | Sidewalk Shed | Permit Issued | A H INSTALLATION | 10/18/2024 |
| DOB NOW | Plumbing | Permit Issued | JVR PLBG AND HEATING INC | 09/03/2024 |
| DOB NOW | Standpipe | Permit Issued | PACIFIC PLBG. & HTG. CORP | 01/19/2024 |
| DOB NOW | Construction Fence | Permit Issued | DASR CORP | 10/10/2023 |
| DOB NOW | Construction Fence | Permit Issued | CHUN LIN CHIANG | 12/17/2019 |
| DOB NOW | Construction Fence | Permit Issued | CHUN LIN CHIANG | 11/01/2019 |
| BIS | — | ISSUED | DASR CORP | 06/16/2025 |
| BIS | — | ISSUED | DASR CORP | 10/29/2024 |
| BIS | — | ISSUED | DASR CORP | 07/22/2024 |
| BIS | — | ISSUED | DASR CORP | 04/26/2024 |
| BIS | — | ISSUED | DASR CORP | 04/26/2024 |
| BIS | — | ISSUED | DASR CORP | 02/15/2024 |
| BIS | — | RE-ISSUED | DASR CORP | 02/08/2024 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 04/07/2025 | — | — | Air Conditioning Systems, Generators, Heating Systems, Ventilation Systems | Cooling Mitsubishi Electric PUHY-EP72TNU 72,000 BTU · Vrf Outdoor ×9 PURY-HP120 120,000 BTU · Vrf Outdoor ×7 PURY-HP72TKMU 72,000 BTU · Vrf Outdoor ×7 Heating General Electric AZ65H15BD 13,000 BTU · Ptac ×268 Ventilation Greenheck ERV-10-20H 645 CFM · Erv ×4 Generators Mtu 6R0225 DS350 Generator ×4 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 03/30/2025 | Permit Issued | DOUG'S PLBG & HTG SERV CO | 258 heads, 41 outlets |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 03/30/2025 | Permit Issued | PLUMB-IT MECHANICAL INC | Gas, Storm, Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 03/03/2026 | Permit Issued | INTELOGIC ELECTRIC, INC. | — |
| 10/21/2025 | Permit Issued | PRESTIGE ELECL CONTG CORP | General Wiring |
| 03/06/2025 | Permit Issued | ENTERPRISE ELEC'L SYSTEMS | General Wiring |
| 03/04/2025 | Permit Issued | RICHARD NEU | — |
| 02/24/2025 | Permit Issued | ENTERPRISE ELEC'L SYSTEMS | — |
| 10/17/2024 | Permit Issued | RICHARD NEU | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/23/2024 | Signed-off | DASR CORP | Steel, Concrete |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/11/2025 | Permit Issued | RELIABLE ENTERPRISES INC | Scaffold |
| 07/11/2025 | Permit Issued | A & H INSTALLATION INC | Sidewalk Shed |
| Date | Type | Result | Report |
|---|---|---|---|
| 07/23/2026 | Pass-Final General Construction Non-Directive 14 | Pass | View ↗ |
| 05/04/2026 | Certified StandPipe - SD - Hydrostatic 63/09 Test (100 Foot Increments) | Certified | View ↗ |
| 04/28/2026 | Certified StandPipe - SD - Hydrostatic 63/09 Test (100 Foot Increments) | Certified | View ↗ |
| 03/04/2026 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 02/26/2026 | Certified StandPipe - SD - Hydrostatic 63/09 Test (100 Foot Increments) | Certified | View ↗ |
| 12/29/2025 | Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet) | Certified | View ↗ |
| 12/23/2025 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 08/12/2025 | Certified StandPipe - SD - Hydrostatic 63/09 Test (100 Foot Increments) | Certified | View ↗ |
| 04/15/2025 | Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet) | Certified | View ↗ |
| 01/28/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 09/10/2024 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 01/24/2026 | Fuel-Oil Storage and Fuel-Oil Piping Systems | FAHAD FATEH | special |
| 04/03/2025 | Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation | FAHAD FATEH | special |
| 04/03/2025 | Maintenance information | FAHAD FATEH | energy_progress |
| 04/03/2025 | HVAC and service water heating system controls | FAHAD FATEH | energy_progress |
| 04/03/2025 | HVAC and service water heating equipment | FAHAD FATEH | energy_progress |
| 04/03/2025 | Fire-Resistance Rated Construction | FAHAD FATEH | progress |
| 04/03/2025 | Energy Code Compliance Inspections | FAHAD FATEH | progress |
| 04/03/2025 | Sprinkler Systems | FAHAD FATEH | special |
| 04/03/2025 | Standpipe Systems | FAHAD FATEH | special |
| 03/06/2025 | Heating Systems | FAHAD FATEH | special |
| 03/06/2025 | Fire-Resistant Penetrations and Joints | FAHAD FATEH | special |
| 03/06/2025 | Emergency and Standby Power Systems (Generator) | FAHAD FATEH | special |
| 03/06/2025 | HVAC insulation and sealing | — | energy_progress |
| 03/06/2025 | HVAC and service water heating system controls | — | energy_progress |
| 03/06/2025 | HVAC and service water heating equipment | — | energy_progress |
| 03/06/2025 | Maintenance information | — | energy_progress |
| 03/06/2025 | Shutoff dampers | — | energy_progress |
| 03/06/2025 | Final | FAHAD FATEH | progress |
| 03/06/2025 | Smoke Control Systems Testing | FAHAD FATEH | special |
| 03/06/2025 | Mechanical Systems | FAHAD FATEH | special |
| 10/16/2024 | Structural Steel - Details | Jieming Wang | special |
| 10/16/2024 | Structural Steel - High Strength Bolting | Jieming Wang | special |
| 10/16/2024 | Preliminary | Jieming Wang | progress |
| 10/16/2024 | Fire-Resistance Rated Construction | Jieming Wang | progress |
| 10/16/2024 | Final | Jieming Wang | progress |
| Tenant | Space | Floors | Renovation projects |
|---|---|---|---|
| Concourse West Hotel | Other | — | Project X01188918 |