ECB10/24/2026Observed proposed 16 story mixed use NB with supported scaffold erected at exp 1 & 3. At time of inspection i observed supported scaffolding netting not maintained as per code. Debris netting was loose and uns$2K due
ECB10/14/2026Observed sidewalk shed installed @ exposure 1 of jobsite. The shed has large amount of material storage on top of it. Materials consist of construction debris/materials and scaffold components. Stop all materia$2K due
ECB10/14/2026Observed supported scaffold installed expo 1 &3. Base of scaffold is with 2 foot frames with connections on both shed and concrete slab on 2ND fl and elevated shed section not shown on approved plans. 2 fully p$1K due
ECB09/19/2026Observed proposed 16 story NB closed site. At time of exterior inspection i observed jersey barriers were not maintained as per manufacturer specifications and not interlocked. These conditions are unsafe to$2K due
ECB09/19/2026Observed proposed 16 story NB closed site. At time of inspection upon knocking on fence and announcing my self to alert watchperson and verify compliance, no required watch person was available, these condition$2K due
ECB09/19/2026Observed proposed 16 story NB closed site. At time of exerioe inspection i observed supported scaffold debris netting not maintained as per code. These conditions are unsafe and prompt material and debris to be$2K due
ECB09/08/2026Failure to institute safety equip measures or temporary construction "no toe board". As noted: at time of inspection at an active jobsite ofa proposed 16 story building already at the bulkhead level. Observed a$5K due
ECB09/08/2026Failure to maintain adequate housekeeping per section requirement. As noted: at time of inspection at an active jobsite of a proposed 16 story building already at the bulkhead level. Observed from 8TH floor lev$2K due
ECB09/09/202516 story new building active site concrete pouring on 11 fl at exp#1.observed street operations concrete truck with boom arm, concrete mixing truck, washout box in place on street with yodok barriers in place p$6K due
ECB09/09/202516 story new building active site concrete pour 11 fl. Observed supported scaffold in place approx. 110 ft in height all exposures. Manual hoisting pulley system installed on scaffold at exp#2. Upon request for$6K due
ECB09/09/2025Proposed 16 story new building active site. Concrete pouring at 11 fl.roof protection installed contrary to ssp details pg ssp 119.01. Roof not fully protected/inadequate missing protection on coping stones. Mi$6K due
ECB09/09/202516 story new building active site.concrete pouring at 11 fl. Supported scaffold 110 ft in height in place at all exposures.scaffold installed contrary to plans/manufacturer specs.missing cross bracing on shed e$6K due
ECB09/08/202516 story new building active site concrete pour on 11 fl. Observed guardrail/vertical netting systems not installed/maintained secured as required/unsafe missing/loose cables missing zero cables/safety netting$10K due
ECB06/12/2025Observed major building forming the 11TH floor under application #210180481 & subsequent in conjunction with permit X00305247-I1-st for 16 story NB, observed a mix of concrete forms, reshores, and make-shift co$12K due
ECB06/12/2025Observed pipe scaffold installed at exterior perimeter & at expo 3&4 trust beams not per plans. Needle beams @ expo 4 missing connection clamps between beams, sidewalk shed @ EXPO1 overloaded w/ construction ma$12K due
ECB06/12/2025(ac 28-110.1)observed major building forming the 11TH floor under application #210180481& subsequent in conjunction permit X00305247-I1-st for 16 story NB, upon reviewing of the provided ssp, material hoist ins$12K due
ECB06/12/2025Observed major building forming the 11TH floor under application #210180481& subsequent in conjunction permit X00305247-I1-st for 16 story NB. Upon reviewing the department records alerted me that the concrete$25K due
ECB06/12/2025Observed major building forming the 11TH floor under application #210180481& subsequent in conjunction permit X00305247-I1-st for 16 story NB. Upon reviewing the department records, no site safety manager has b$25K due
ECB07/18/2026At time of inspection, closed 14-story building observed with yodocks at exposure 1 not maintained per manufacturer specifications. Barriers were not properly connected and were not filled for stability. ConditHearing held — result not yet published$1K proposed
ECB06/11/2026At time of inspection, closed 16-story NB site. Perimeter safety netting observed ripped and damaged at upper levels of the building. Damaged netting may fail to contain falling materials, creating a hazard toHearing held — result not yet published$2K proposed
ECB06/11/2026At time of inspection, closed 16-story NB site. Heavy debris beneath sidewalk shed at EXP2 storage zone not maintained. Shed posts at parking area lack reflective markings. Sidewalk shed at exp 1 not maintainedHearing held — result not yet published$2K proposed
ECB06/12/2025Observed major building forming the 11TH floor under application #210180481& subsequent in conjunction permit X00305247-I1-st for 16 story NB, observed that standpipe wasn't painted red ( state of readiness ) aNothing owed — awaiting certificate of correction