← Back
BuildNYC
Two stories - detached, small or mid-size
87-03 CHEVY CHASE STREET
QUEENS · BIN 4213532
💬 Discuss this project
1940Year Built
2Stories
A1Building Class
R1-2Zoning
1,520 sfGross Floor Area
1Units
Rent Stabilized3 Active Violations ▸FDNY Report ↗
Two stories - detached, small or mid-size · Owner of record: Mercy I Property · 8,900 sf lot · 0.17 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
AtticFixture replacement, bathrooms, boiler, and drywells4p · 1 filing · 20 docs
Floor 2Fixture replacement, bathrooms, boiler, and drywells4p · 1 filing · 20 docs
Floor 1Fixture replacement, bathrooms, boiler, and drywells4p · 1 filing · 20 docs
CellarFixture replacement, bathrooms, boiler, and drywells6p · 1 filing · 20 docs
Site & exteriorFixture replacement, bathrooms, boiler, and drywells8p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Mercy I Property2607/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
07/30/2018$1.2M—Private party → Mercy I Property$822/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Rike Tech Associates310/07/2025
Haym S. Gross, Architect112/20/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Britz Enterprises803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
FRSS GroupScaffold607/08/2026
All Pro Plumbing & HeatingPlumbing207/08/2026
Blue Seagull ElectricalElectrical103/22/2026
FRSS GroupFire Protection104/09/2026
FRSS GroupGeneral Contractor810/11/2024
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Rike Tech Associates2965310/07/2025
Building Lifecycle
02/27/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
SYED RIZVI
02/27/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
SYED RIZVI
02/27/2026
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
SYED RIZVI
02/27/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SYED RIZVI
02/27/2026
Special inspection requirement — Energy Code Compliance Inspections
SYED RIZVI
58 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedAll Pro Plumbing & Heating12/13/2024
DOB NOWConstruction FenceSigned-offFRSS Group03/19/2024
DOB NOWConstruction FenceSigned-offFRSS Group08/23/2023
DOB NOWPlumbingPermit IssuedAll Pro Plumbing & Heating03/06/2023
DOB NOWConstruction FenceSigned-offFRSS Group09/12/2022
DOB NOWConstruction FenceSigned-offFRSS Group10/01/2021
DOB NOWConstruction FenceSigned-offFRSS Group10/31/2020
BISOTISSUEDFRSS Group10/11/2024
BIS—ISSUEDFRSS Group09/11/2024
BIS—ISSUEDFRSS Group08/28/2024
BIS—ISSUEDFRSS Group08/09/2023
BIS—ISSUEDFRSS Group08/09/2023
BISOTISSUEDFRSS Group08/16/2022
BISOTISSUEDFRSS Group08/17/2021
BISOTISSUEDFRSS Group04/30/2021
1 project · most recent 10/07/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
10/07/2025Permit IssuedAll Pro Plumbing & HeatingGas, Storm, Water/Sanitary
3 projects · most recent 08/09/2024
General Wiring
FiledStatusContractorScope
08/09/2024Permit IssuedBlue Seagull Electrical—
03/21/2023Permit IssuedLens ElectricGeneral Wiring
07/15/2018Permit IssuedPro-Code ElectricalGeneral Wiring
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
05/26/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/26/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/26/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 19
DateRequirementInspectorRole
02/27/2026Subsurface Investigations (Borings/Test Pits)SYED RIZVIspecial
02/27/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationSYED RIZVIspecial
02/27/2026Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesSYED RIZVIspecial
02/27/2026Fire-Resistant Penetrations and JointsSYED RIZVIspecial
02/27/2026Energy Code Compliance InspectionsSYED RIZVIprogress
02/27/2026Fire-Resistance Rated ConstructionSYED RIZVIprogress
02/27/2026HVAC and service water heating system controls SYED RIZVIenergy_progress
02/27/2026HVAC insulation and sealing SYED RIZVIenergy_progress
02/27/2026HVAC and service water heating equipment SYED RIZVIenergy_progress
09/15/2025Fire-Resistant Penetrations and JointsSYED RIZVIspecial
09/15/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationSYED RIZVIspecial
09/15/2025Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesSYED RIZVIspecial
09/15/2025Subsurface Investigations (Borings/Test Pits)SYED RIZVIspecial
09/15/2025Energy Code Compliance InspectionsSYED RIZVIprogress
09/15/2025Fire-Resistance Rated ConstructionSYED RIZVIprogress
09/15/2025HVAC and service water heating equipment SYED RIZVIenergy_progress
09/15/2025HVAC and service water heating system controls SYED RIZVIenergy_progress
09/15/2025HVAC insulation and sealing SYED RIZVIenergy_progress
12/16/2021Post-installed AnchorsSYED RIZVIspecial
114 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account