← Back
One story - permanent living quarter
87-04 215 PLACE
QUEENS · BIN 4228908
💬 Discuss this project
1960Year Built
1Stories
A2Building Class
R2Zoning
2,404 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
One story - permanent living quarter · Owner of record: THE NEW YORK BUDDHIST VIHARA FOUNDATION · 5,750 sf lot · 0.42 FAR built · Flood zone X
Locations of Work
ElectricalGeneral
Roof1p · 1 filing · 20 docs
Floor 11p · 1 filing · 20 docs
Cellar1p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NEW YORK BUDDHIST VIHARA FOUNDATION1104/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/04/2014$610K—— → —$254/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
KNF SERVICES CROP609/05/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
KNF SERVICES CROP303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JH CREW INCGeneral Contractor404/08/2026
HAY MECHANICAL SOLUTIONSPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP5616509/05/2025
Building Lifecycle
All (63)Filed (6)Permit Issued (4)Signed Off (3)Violation (2)Inspection (8)Objection (10)Special Inspection (30)
10/06/2025
Signed off — Alteration
ALT-GC FILING FOR REAR HORIZONTAL EXTENTION @ CELLAR, 1ST FLOOR AND ROOF. NO CHANGE IN USE EGRESS AND OCCUPANCY. PLUMBING WILL BE FILED SEPERATELY.
Q00707527-I1
09/30/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
09/29/2025
Signed off — Alteration
PLUMBING FILING TO INSTALL NEW LAVORATORY, WC AND STAND SHOWER AT 1ST FLOOR AND ALSO INSTALL A DRY WELL AT THE MENTIONED LOCATION IN THE DRAWING IN CONJUNCTION WITH JOB # Q00707527-I1. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
Q00748059-I1
09/05/2025
Filed — Alteration
ALT-GC FILING FOR REAR HORIZONTAL EXTENTION @ CELLAR, 1ST FLOOR AND ROOF. NO CHANGE IN USE EGRESS AND OCCUPANCY. PLUMBING WILL BE FILED SEPERATELY.
Q00707527-P2
09/04/2025
Special inspection requirement — Concrete - Cast-In-Place
FAHAD FATEH
09/04/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
FAHAD FATEH
09/04/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
09/04/2025
Special inspection requirement — Masonry
FAHAD FATEH
09/04/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
FAHAD FATEH
09/04/2025
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
FAHAD FATEH
09/04/2025
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
09/04/2025
Special inspection requirement — Final
FAHAD FATEH
09/04/2025
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
09/04/2025
Special inspection requirement — Footing and Foundation
FAHAD FATEH
09/04/2025
Special inspection requirement — Structural Wood Frame
FAHAD FATEH
09/04/2025
Special inspection requirement — Protection of exposed foundation insulation
FAHAD FATEH
09/04/2025
Special inspection requirement — Lighting controls
FAHAD FATEH
09/04/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
09/04/2025
Special inspection requirement — Interior lighting power
FAHAD FATEH
09/04/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
09/04/2025
Special inspection requirement — Fenestration areas
FAHAD FATEH
09/04/2025
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
09/04/2025
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
08/13/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
07/27/2025
Objection resolved — Addressed
06/04/2025
Objection raised — Scope
05/21/2025
Filed — Alteration
ALT-GC FILING FOR REAR HORIZONTAL EXTENTION @ CELLAR, 1ST FLOOR AND ROOF. NO CHANGE IN USE EGRESS AND OCCUPANCY. PLUMBING WILL BE FILED SEPERATELY.
Q00707527-P1
03/29/2025
Special inspection requirement — Concrete - Cast-In-Place
FAHAD FATEH
03/29/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
FAHAD FATEH
03/29/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
03/29/2025
Special inspection requirement — Masonry
FAHAD FATEH
03/29/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
FAHAD FATEH
03/29/2025
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
FAHAD FATEH
03/29/2025
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
03/29/2025
Special inspection requirement — Final
FAHAD FATEH
03/29/2025
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
03/29/2025
Special inspection requirement — Footing and Foundation
FAHAD FATEH
03/29/2025
Special inspection requirement — Structural Wood Frame
FAHAD FATEH
05/06/2024
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
01/22/2024
Filed — Alteration
PLUMBING FILING TO INSTALL NEW LAVORATORY, WC AND STAND SHOWER AT 1ST FLOOR AND ALSO INSTALL A DRY WELL AT THE MENTIONED LOCATION IN THE DRAWING IN CONJUNCTION WITH JOB # Q00707527-I1. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
Q00748059-P1
10/26/2023
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
10/19/2023
Permit issued — Plumbing
Q00748059-I1-PL
09/22/2023
Permit issued — Structural
Q00707527-I1-GC-CX
04/07/2023
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
03/24/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/21/2023
Signed off — Alteration
Q00770301-I1
03/17/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/17/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
12/08/2022
Permit issued — Plumbing
Q00748059-I1-PL
08/09/2022
Violation issued (ECB, closed)
Construction
08/09/2022
Violation issued (ECB, closed)
Construction
07/13/2022
Permit issued — Construction Fence
Q00770301-I1-FN
07/07/2022
Filed — Alteration
Q00770301-I1
06/10/2022
Filed — Alteration
PLUMBING FILING TO INSTALL NEW LAVORATORY, WC AND STAND SHOWER AT 1ST FLOOR AND ALSO INSTALL A DRY WELL AT THE MENTIONED LOCATION IN THE DRAWING IN CONJUNCTION WITH JOB # Q00707527-I1. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
Q00748059-I1
05/12/2022
Objection raised — Scope
05/12/2022
Objection resolved — Addressed
04/29/2022
Objection raised — Other
04/29/2022
Objection resolved — Addressed
04/29/2022
Objection raised — Inspections
04/29/2022
Objection resolved — Addressed
Latest 60 of 63 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offHAY MECHANICAL SOLUTIONS10/19/2023
DOB NOWStructuralSigned-offJH CREW INC09/22/2023
DOB NOWPlumbingSigned-offHAY MECHANICAL SOLUTIONS12/08/2022
DOB NOWConstruction FenceSigned-offJH CREW INC07/13/2022
1 project · most recent 10/13/2022
General Wiring
FiledStatusContractorScope
10/13/2022CompleteJSP ELECTL CNTNG CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
09/30/2025Pass-Final General Construction Non-Directive 14PassView ↗
08/13/2025Fail-Final General Construction Non-Directive 14FailView ↗
05/06/2024Fail-Final General Construction Non-Directive 14FailView ↗
10/26/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
04/07/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
03/24/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/17/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/17/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 40
DateRequirementInspectorRole
09/04/2025Concrete - Cast-In-PlaceFAHAD FATEHspecial
09/04/2025Excavations - Sheeting, Shoring, and BracingFAHAD FATEHspecial
09/04/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
09/04/2025MasonryFAHAD FATEHspecial
09/04/2025Structural Stability – Alterations of existing buildingsFAHAD FATEHspecial
09/04/2025Wall Panels, Curtain Walls, and VeneersFAHAD FATEHspecial
09/04/2025Energy Code Compliance InspectionsFAHAD FATEHprogress
09/04/2025FinalFAHAD FATEHprogress
09/04/2025Fire-Resistance Rated ConstructionFAHAD FATEHprogress
09/04/2025Footing and FoundationFAHAD FATEHprogress
09/04/2025Structural Wood FrameFAHAD FATEHprogress
09/04/2025Protection of exposed foundation insulationFAHAD FATEHenergy_progress
09/04/2025Lighting controlsFAHAD FATEHenergy_progress
09/04/2025HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
09/04/2025Interior lighting powerFAHAD FATEHenergy_progress
09/04/2025Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
09/04/2025Fenestration areasFAHAD FATEHenergy_progress
09/04/2025Air barrier - visual inspectionFAHAD FATEHenergy_progress
09/04/2025Fenestration air leakageFAHAD FATEHenergy_progress
03/29/2025Concrete - Cast-In-PlaceFAHAD FATEHspecial
03/29/2025Excavations - Sheeting, Shoring, and BracingFAHAD FATEHspecial
03/29/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
03/29/2025MasonryFAHAD FATEHspecial
03/29/2025Structural Stability – Alterations of existing buildingsFAHAD FATEHspecial
03/29/2025Wall Panels, Curtain Walls, and VeneersFAHAD FATEHspecial
Latest 25 of 40.
▾Documents — 39 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/26/2026Q00748059-P1Request digital key ↗
08/26/2026Q00748059-I1Request digital key ↗
08/26/2026Q00770301-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026Q00707527-P2Open ↗
08/13/2026Q00707527-P1Open ↗
08/13/2026Q00707527-I1Open ↗
▸Seals & Professional Certifications15
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/26/2026Q00748059-P1Open ↗
08/26/2026Q00748059-I1Open ↗
08/13/2026Q00707527-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
08/29/2026Q00707527-P1Open ↗
08/29/2026Q00707527-P1Open ↗
08/28/2026Q00748059-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
08/29/2026Q00707527-P1Open ↗
08/29/2026Q00707527-P1Open ↗
08/24/2026Q00707527-P2Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/26/2026Q00748059-P1Open ↗
08/26/2026Q00748059-I1Open ↗
08/13/2026Q00707527-P1Open ↗
Showing 3 of 5 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026Q00707527-I1Open ↗
▸Other Documents9
▸DOB NOWPlot Diagram3
08/13/2026Q00707527-I1Open ↗
08/13/2026Q00707527-P2Open ↗
08/13/2026Q00707527-P1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026Q00707527-P1Open ↗
08/13/2026Q00707527-I1Open ↗
08/13/2026Q00707527-P2Open ↗
▸DOB NOWSite Survey: Initial3
08/13/2026Q00707527-P1Open ↗
08/13/2026Q00707527-P2Open ↗
08/13/2026Q00707527-I1Open ↗