← Back
Two family converted from one family
87-10 ELMHURST AVENUE
QUEENS · BIN 4038919
💬 Discuss this project
1910Year Built
3Stories
B3Building Class
R5Zoning
2,654 sfGross Floor Area
2Units
0 Open Violations
Two family converted from one family · Owner of record: JIREH US INC. · 1,845 sf lot · 1.44 FAR built · Flood zone X
Locations of Work
ArchitectureMechanical
Floor 314p · 2 filings · 20 docs
Floor 216p · 1 filing · 20 docs
Floor 115p · 2 filings · 20 docs
Cellar13p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MEI BUILDING SERVICES CORP.103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/07/2022$725K—Private party → JIREH US INC.$273/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
S M TAM ARCHITECT, PLLC708/10/2023
EJC ENGINEERING, PLLC110/05/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
S M TAM ARCHITECT203/21/2026
MEI BUILDINGS SERVICES803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NY BUILDING ASSOCIATES INGeneral Contractor307/08/2026
AL-LECTRIC ELECT'L CONTRGElectrical103/22/2026
AMERICAN STANDARD PLUMBING &Fire Protection107/08/2026
AMERICAN STANDARD P&H CORORP.Plumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NKM ENGINEERING PLLC6244808/10/2023
Building Lifecycle
All (98)Filed (8)Permit Issued (4)Signed Off (3)Violation (2)Inspection (9)Objection (42)Special Inspection (30)
11/29/2023
Signed off — Alteration
PROPOSED PLUMBING WORK WHICH INCLUDES WATER/SANITARY WORK AND GAS PIPING WORK OF INSTALLING 1 NEW GAS METER, WATER CLOSETS, SINKS, LAVATORIES, SHOWERS, WASHER, GAS DRYER, STOVES AND BOILERS @ CELLAR, 1ST, 2ND AND 3RD FLOOR AS PER PLAN.
Q00752056-I1
10/26/2023
Signed off — Alteration
INSTALLATION OF NEW SPRINKLER SYSTEM FOR 3-STORY BUILDING
Q00762832-I1
10/26/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
NARESH MAHANGU
10/26/2023
Special inspection requirement — Interior lighting power
NARESH MAHANGU
10/26/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
NARESH MAHANGU
10/26/2023
Special inspection requirement — Permanent certificate
NARESH MAHANGU
10/26/2023
Special inspection requirement — Fenestration air leakage
NARESH MAHANGU
10/26/2023
Special inspection requirement — Fenestration areas
NARESH MAHANGU
10/26/2023
Special inspection requirement — Maintenance information
NARESH MAHANGU
10/26/2023
Special inspection requirement — Energy Code Compliance Inspections
NARESH MAHANGU
10/26/2023
Special inspection requirement — Fire-Resistance Rated Construction
NARESH MAHANGU
10/19/2023
Objection resolved — Addressed
10/06/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/25/2023
Signed off — Alteration CO
CONVERT EXISTING ONE (1) FAMILY RESIDENTIAL BUILDING INTO TWO (2) FAMILY RESIDENTIAL BUILDING. PROPOSED GENERAL INTERIOR RENOVATION AS PER PLAN. NO CHANGE IN EXISTING BUILDING BULK.
Q00751981-S2
09/12/2023
Permit issued — Mechanical Systems
Q00751981-S2-MS
08/17/2023
Objection raised — Scope
08/10/2023
Filed — Alteration CO
CONVERT EXISTING ONE (1) FAMILY RESIDENTIAL BUILDING INTO TWO (2) FAMILY RESIDENTIAL BUILDING. PROPOSED GENERAL INTERIOR RENOVATION AS PER PLAN. NO CHANGE IN EXISTING BUILDING BULK.
Q00751981-P3
08/04/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
08/01/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
07/11/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/31/2023
Permit issued — Sprinklers
Q00762832-I1-EW-SP
02/14/2023
Filed — Alteration CO
CONVERT EXISTING ONE (1) FAMILY RESIDENTIAL BUILDING INTO TWO (2) FAMILY RESIDENTIAL BUILDING. PROPOSED GENERAL INTERIOR RENOVATION AS PER PLAN. NO CHANGE IN EXISTING BUILDING BULK.
Q00751981-P2
02/13/2023
Special inspection requirement — Maintenance information
NARESH MAHANGU
02/13/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
NARESH MAHANGU
02/13/2023
Special inspection requirement — Energy Code Compliance Inspections
NARESH MAHANGU
02/13/2023
Special inspection requirement — Fire-Resistance Rated Construction
NARESH MAHANGU
02/13/2023
Special inspection requirement — Interior lighting power
NARESH MAHANGU
02/13/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
NARESH MAHANGU
02/13/2023
Special inspection requirement — Fenestration air leakage
NARESH MAHANGU
02/13/2023
Special inspection requirement — Fenestration areas
NARESH MAHANGU
02/13/2023
Special inspection requirement — Permanent certificate
NARESH MAHANGU
02/09/2023
Objection raised — Zoning
02/09/2023
Objection resolved — Addressed
02/09/2023
Objection raised — Admin
02/09/2023
Objection resolved — Addressed
02/08/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/07/2023
Filed — Alteration CO
CONVERT EXISTING ONE (1) FAMILY RESIDENTIAL BUILDING INTO TWO (2) FAMILY RESIDENTIAL BUILDING. PROPOSED GENERAL INTERIOR RENOVATION AS PER PLAN. NO CHANGE IN EXISTING BUILDING BULK.
Q00751981-S2
02/06/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
NARESH MAHANGU
02/06/2023
Special inspection requirement — HVAC-R and service water heating equipment
NARESH MAHANGU
02/06/2023
Special inspection requirement — Energy Code Compliance Inspections
NARESH MAHANGU
02/06/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
NARESH MAHANGU
02/06/2023
Special inspection requirement — HVAC-R and service water heating system controls
NARESH MAHANGU
02/06/2023
Special inspection requirement — Maintenance information
NARESH MAHANGU
01/06/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/03/2023
Special inspection requirement — HVAC-R and service water heating system controls
NARESH MAHANGU
01/03/2023
Special inspection requirement — Maintenance information
NARESH MAHANGU
01/03/2023
Special inspection requirement — HVAC-R and service water heating equipment
NARESH MAHANGU
01/03/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
NARESH MAHANGU
12/29/2022
Filed — Alteration
PROPOSED PLUMBING WORK WHICH INCLUDES WATER/SANITARY WORK AND GAS PIPING WORK OF INSTALLING 1 NEW GAS METER, WATER CLOSETS, SINKS, LAVATORIES, SHOWERS, WASHER, GAS DRYER, STOVES AND BOILERS @ CELLAR, 1ST, 2ND AND 3RD FLOOR AS PER PLAN.
Q00752056-P1
11/29/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
11/29/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/29/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
11/07/2022
Filed — Alteration CO
CONVERT EXISTING ONE (1) FAMILY RESIDENTIAL BUILDING INTO TWO (2) FAMILY RESIDENTIAL BUILDING. PROPOSED GENERAL INTERIOR RENOVATION AS PER PLAN. NO CHANGE IN EXISTING BUILDING BULK.
Q00751981-P1
10/18/2022
Objection raised — Other
10/18/2022
Objection resolved — Addressed
10/12/2022
Objection raised — Scope
10/12/2022
Objection resolved — Addressed
10/12/2022
Objection raised — Structural
10/12/2022
Objection resolved — Addressed
10/12/2022
Objection raised — Scope
Latest 60 of 98 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offNY BUILDING ASSOCIATES IN09/12/2023
DOB NOWSprinklersSigned-offAMERICAN STANDARD PLUMBIN05/31/2023
DOB NOWPlumbingSigned-offAMERICAN STANDARD P&H CORORP.10/11/2022
DOB NOWGeneral ConstructionPermit IssuedNY BUILDING ASSOCIATES IN08/15/2022
1 project · most recent 08/10/2023
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
08/10/2023Signed-offNY BUILDING ASSOCIATES INHeating and Air Conditioning Systems
Heat / Cool
Gree 3VIR12HP230V1AH 12,000 BTU · Fan Coil Indoor ×2
3VIR18HP230V1AH 18,000 BTU · Fan Coil Indoor ×2
3VIR18HP230V1AO 24,000 BTU · Condensing Unit ×2
MULTI18HP230V1CO 19,000 BTU · Condensing Unit ×2
3VIR09HP230V1AH 9,100 BTU · Fan Coil Indoor ×1
1 project · most recent 05/22/2023
General Wiring
FiledStatusContractorScope
05/22/2023CompleteAL-LECTRIC ELECT'L CONTRGGeneral Wiring
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
10/06/2023Pass-Final CND-Occupancy InspectionPassView ↗
08/04/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/01/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/11/2023Pass-Final CND-Occupancy InspectionPassView ↗
02/08/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/06/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/29/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
11/29/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/29/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 32
DateRequirementInspectorRole
10/26/2023Fire-Resistant Penetrations and JointsNARESH MAHANGUspecial
10/26/2023Interior lighting powerNARESH MAHANGUenergy_progress
10/26/2023Fenestration and door U-factor and product ratingsNARESH MAHANGUenergy_progress
10/26/2023Permanent certificateNARESH MAHANGUenergy_progress
10/26/2023Fenestration air leakageNARESH MAHANGUenergy_progress
10/26/2023Fenestration areasNARESH MAHANGUenergy_progress
10/26/2023Maintenance informationNARESH MAHANGUenergy_progress
10/26/2023Energy Code Compliance InspectionsNARESH MAHANGUprogress
10/26/2023Fire-Resistance Rated ConstructionNARESH MAHANGUprogress
02/13/2023Maintenance informationNARESH MAHANGUenergy_progress
02/13/2023Fire-Resistant Penetrations and JointsNARESH MAHANGUspecial
02/13/2023Energy Code Compliance InspectionsNARESH MAHANGUprogress
02/13/2023Fire-Resistance Rated ConstructionNARESH MAHANGUprogress
02/13/2023Interior lighting powerNARESH MAHANGUenergy_progress
02/13/2023Fenestration and door U-factor and product ratingsNARESH MAHANGUenergy_progress
02/13/2023Fenestration air leakageNARESH MAHANGUenergy_progress
02/13/2023Fenestration areasNARESH MAHANGUenergy_progress
02/13/2023Permanent certificateNARESH MAHANGUenergy_progress
02/06/2023HVAC-R and service water piping design and insulationNARESH MAHANGUenergy_progress
02/06/2023HVAC-R and service water heating equipmentNARESH MAHANGUenergy_progress
02/06/2023Energy Code Compliance InspectionsNARESH MAHANGUprogress
02/06/2023Fire-Resistant Penetrations and JointsNARESH MAHANGUspecial
02/06/2023HVAC-R and service water heating system controlsNARESH MAHANGUenergy_progress
02/06/2023Maintenance informationNARESH MAHANGUenergy_progress
01/03/2023HVAC-R and service water heating system controlsNARESH MAHANGUenergy_progress
Latest 25 of 32.
▾Documents — 56 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/25/2026Q00762832-I1Request digital key ↗
08/25/2026Q00752056-P1Request digital key ↗
08/24/2026Q00751981-P1Request digital key ↗
Showing 3 of 8 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00751981-I1Open ↗
▸Seals & Professional Certifications28
▸DOB NOWProgress Inspector Seal & Signature13
09/02/2026Q00751981-I1Open ↗
09/02/2026Q00751981-I1Open ↗
09/02/2026Q00751981-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/25/2026Q00752056-I1Open ↗
08/13/2026Q00751981-P3Open ↗
08/13/2026Q00752056-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/02/2026Q00751981-I1Open ↗
09/01/2026Q00751981-S2Open ↗
09/01/2026Q00751981-S2Open ↗
Showing 3 of 7 on file for this type
▸Safety & Tenant Protection5
▸DOB NOWStreet Tree Checklist4
08/13/2026Q00751981-I1Open ↗
08/13/2026Q00751981-P1Open ↗
08/13/2026Q00751981-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q00751981-I1Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/14/2026Q00752056-I1Open ↗
08/13/2026Q00751981-S2Open ↗
08/13/2026Q00751981-I1Open ↗
Showing 3 of 8 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026Q00751981-I1Open ↗
▸Other Documents5
▸DOB NOWProperty Ownership Certification4
08/13/2026Q00751981-P1Open ↗
08/13/2026Q00751981-P2Open ↗
08/13/2026Q00751981-P3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWFinal Survey1
08/13/2026Q00751981-I1Open ↗