← Back
QUEENS
87-14 GAR 250 STREET
QUEENS · BIN 4623906
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Flood zone X
Locations of Work
ArchitectureStructuralCivil
Roof3p · 1 filing · 20 docs
Floor 11 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CL ENGINEERING P.C.307/11/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
METRO DESIGN CONSULTANTS INC603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
STELLAR INDUSTRIES INCGeneral Contractor303/21/2026
RISHON HOMES CORPGeneral Contractor203/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CL ENGINEERING P.C.6781307/11/2023
Building Lifecycle
All (41)Filed (3)Permit Issued (2)Inspection (3)Objection (10)Special Inspection (23)
07/17/2025
Inspection — Certified StandPipe-SD-Fixtures-Finish-SD
Certified
View inspection ↗
07/15/2025
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
04/08/2024
Permit issued — Structural
Q00577949-I1-GC-CX
07/17/2023
Special inspection requirement — Subgrade Inspections
CHRISTIAN LOZADA
07/17/2023
Special inspection requirement — Concrete - Cast-In-Place
CHRISTIAN LOZADA
07/17/2023
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Rajasekhar Sakhamuri
07/17/2023
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
CHRISTIAN LOZADA
07/17/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
07/17/2023
Special inspection requirement — Masonry
CHRISTIAN LOZADA
07/17/2023
Special inspection requirement — Final
CHRISTIAN LOZADA
07/17/2023
Special inspection requirement — Structural Wood Frame
CHRISTIAN LOZADA
07/17/2023
Special inspection requirement — Footing and Foundation
CHRISTIAN LOZADA
07/17/2023
Special inspection requirement — Fire-Resistance Rated Construction
CHRISTIAN LOZADA
07/17/2023
Special inspection requirement — Interior lighting power
CHRISTIAN LOZADA
07/17/2023
Special inspection requirement — Electric vehicle service equipment requirements
CHRISTIAN LOZADA
07/11/2023
Filed — New Building
PROPOSED NEW ENCLOSED ONE (1) CAR GARAGE.
Q00577949-P2
07/10/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/03/2021
Filed — New Building
PROPOSED NEW ENCLOSED ONE (1) CAR GARAGE.
Q00577949-P1
11/02/2021
Special inspection requirement — Concrete - Cast-In-Place
CHRISTIAN LOZADA
11/02/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
11/02/2021
Special inspection requirement — Masonry
CHRISTIAN LOZADA
11/02/2021
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
CHRISTIAN LOZADA
11/02/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
11/02/2021
Special inspection requirement — Final
CHRISTIAN LOZADA
11/02/2021
Special inspection requirement — Fire-Resistance Rated Construction
CHRISTIAN LOZADA
11/02/2021
Special inspection requirement — Footing and Foundation
CHRISTIAN LOZADA
11/02/2021
Special inspection requirement — Structural Wood Frame
CHRISTIAN LOZADA
11/02/2021
Special inspection requirement — Electric vehicle service equipment requirements
CHRISTIAN LOZADA
11/02/2021
Special inspection requirement — Interior lighting power
CHRISTIAN LOZADA
10/28/2021
Permit issued — Earth Work
Q00577949-I1-GC-CX
09/15/2021
Objection resolved — Addressed
09/15/2021
Objection resolved — Addressed
09/15/2021
Objection resolved — Addressed
09/15/2021
Objection resolved — Addressed
09/03/2021
Objection resolved — Addressed
09/01/2021
Objection raised — Other
08/24/2021
Objection raised — Energy
08/24/2021
Objection raised — Energy
08/24/2021
Objection raised — Energy
08/24/2021
Objection raised — Energy
08/18/2021
Filed — New Building
PROPOSED NEW ENCLOSED ONE (1) CAR GARAGE.
Q00577949-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralPermit IssuedRISHON HOMES CORP04/08/2024
DOB NOWEarth WorkPermit IssuedSTELLAR INDUSTRIES INC10/28/2021
1 project · most recent 11/07/2023
General Wiring
FiledStatusContractorScope
11/07/2023CompletePOWER SURGE ELECTRIC, INCGeneral Wiring
1 project · most recent 07/11/2023
Masonry Wood
FiledStatusContractorScope
07/11/2023Permit IssuedRISHON HOMES CORPMasonry, Wood
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
07/17/2025Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
07/15/2025Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
07/10/2023Pass-Final CND-Occupancy InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 23
DateRequirementInspectorRole
07/17/2023Subgrade InspectionsCHRISTIAN LOZADAspecial
07/17/2023Concrete - Cast-In-PlaceCHRISTIAN LOZADAspecial
07/17/2023Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
07/17/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationCHRISTIAN LOZADAspecial
07/17/2023Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
07/17/2023MasonryCHRISTIAN LOZADAspecial
07/17/2023FinalCHRISTIAN LOZADAprogress
07/17/2023Structural Wood FrameCHRISTIAN LOZADAprogress
07/17/2023Footing and FoundationCHRISTIAN LOZADAprogress
07/17/2023Fire-Resistance Rated ConstructionCHRISTIAN LOZADAprogress
07/17/2023Interior lighting powerCHRISTIAN LOZADAenergy_progress
07/17/2023Electric vehicle service equipment requirementsCHRISTIAN LOZADAenergy_progress
11/02/2021Concrete - Cast-In-PlaceCHRISTIAN LOZADAspecial
11/02/2021Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
11/02/2021MasonryCHRISTIAN LOZADAspecial
11/02/2021Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationCHRISTIAN LOZADAspecial
11/02/2021Structural Stability – Alterations of existing buildings—special
11/02/2021FinalCHRISTIAN LOZADAprogress
11/02/2021Fire-Resistance Rated ConstructionCHRISTIAN LOZADAprogress
11/02/2021Footing and FoundationCHRISTIAN LOZADAprogress
11/02/2021Structural Wood FrameCHRISTIAN LOZADAprogress
11/02/2021Electric vehicle service equipment requirementsCHRISTIAN LOZADAenergy_progress
11/02/2021Interior lighting powerCHRISTIAN LOZADAenergy_progress
▾Documents — 37 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/24/2026Q00577949-P1Request digital key ↗
08/24/2026Q00577949-P2Request digital key ↗
08/15/2026Q00577949-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records4
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026Q00577949-I1Open ↗
08/13/2026Q00577949-P2Open ↗
08/13/2026Q00577949-P1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00577949-I1Open ↗
▸Seals & Professional Certifications11
▸DOB NOWSpecial Inspector Seal & Signature4
09/27/2026Q00577949-P1Open ↗
08/31/2026Q00577949-I1Open ↗
08/31/2026Q00577949-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/27/2026Q00577949-P1Open ↗
09/27/2026Q00577949-P1Open ↗
08/31/2026Q00577949-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/24/2026Q00577949-I1Open ↗
08/24/2026Q00577949-P2Open ↗
08/24/2026Q00577949-P1Open ↗
▸Trade Schedules & Equipment1
▸DOB NOWStandpipe Alarms Drawings1
08/15/2026Q00577949-I1—
▸Safety & Tenant Protection4
▸DOB NOWStreet Tree Checklist3
08/24/2026Q00577949-P1Open ↗
08/24/2026Q00577949-P2Open ↗
08/15/2026Q00577949-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q00577949-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026Q00577949-I1Open ↗
▸Inspections & Test Reports3
▸DOB NOWSOIL REPORT2
08/13/2026Q00577949-P2Open ↗
08/13/2026Q00577949-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q00577949-I1Open ↗
▸Other Documents10
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026Q00577949-P2Open ↗
08/13/2026Q00577949-P1Open ↗
08/13/2026Q00577949-I1Open ↗
▸DOB NOWProperty Ownership Certification3
08/24/2026Q00577949-P1Open ↗
08/24/2026Q00577949-P2Open ↗
08/15/2026Q00577949-I1Open ↗
▸DOB NOWSite Survey: Initial2
08/13/2026Q00577949-P2Open ↗
08/13/2026Q00577949-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00577949-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00577949-I1Open ↗