← Back
Two stories - detached, small or mid-size
87-15 260 STREET
QUEENS · BIN 4180684
💬 Discuss this project
1955Year Built
2.25Stories
A1Building Class
R2AZoning
1,938 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · 5,500 sf lot · 0.35 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 210p · 2 filings · 20 docs
Floor 110p · 2 filings · 20 docs
Cellar11p · 2 filings · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ARCHITECTURAL CONCEPT508/19/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ARCHITECTUAL CONCEPT403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
UNITED GENERAL CONTRA CORGeneral Contractor407/08/2026
HORBRIDGE PLUMBING & HEATINGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ARCHITECTURAL CONCEPT3642408/19/2023
Building Lifecycle
All (61)Filed (5)Permit Issued (3)Violation (1)Inspection (4)Objection (18)Special Inspection (30)
03/27/2026
Special inspection requirement — HVAC-R and service water heating system controls
06/04/2024
Special inspection requirement — Permanent certificate
MUZAFFAR JAMAL
06/04/2024
Special inspection requirement — Metering
MUZAFFAR JAMAL
06/04/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
MUZAFFAR JAMAL
06/04/2024
Special inspection requirement — Energy Code Compliance Inspections
MUZAFFAR JAMAL
06/04/2024
Special inspection requirement — Maintenance information
MUZAFFAR JAMAL
06/04/2024
Special inspection requirement — HVAC-R and service water heating system controls
MUZAFFAR JAMAL
06/04/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
MUZAFFAR JAMAL
06/04/2024
Special inspection requirement — HVAC-R and service water heating equipment
MUZAFFAR JAMAL
05/27/2024
Objection resolved — Addressed
10/10/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/08/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/23/2023
Objection raised — Accessibility
08/19/2023
Filed — Alteration
Install new plumbing fixtures and related piping as per drawing.
Q00765553-P1
07/19/2023
Special inspection requirement — Permanent certificate
MUZAFFAR JAMAL
07/19/2023
Special inspection requirement — Energy Code Compliance Inspections
MUZAFFAR JAMAL
07/19/2023
Special inspection requirement — Metering
MUZAFFAR JAMAL
07/19/2023
Special inspection requirement — HVAC-R and service water heating system controls
MUZAFFAR JAMAL
07/19/2023
Special inspection requirement — HVAC-R and service water heating equipment
MUZAFFAR JAMAL
07/19/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
MUZAFFAR JAMAL
07/19/2023
Special inspection requirement — Maintenance information
MUZAFFAR JAMAL
07/19/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
MUZAFFAR JAMAL
05/12/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/12/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
04/24/2023
Permit issued — Plumbing
Q00765553-I1-PL
02/18/2023
Violation issued (ECB, closed)
Construction
01/31/2023
Permit issued — Construction Fence
Q00765554-I1-FN
01/30/2023
Permit issued — General Construction
Q00765552-I1-GC-CX
01/19/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
MUZAFFAR JAMAL
01/19/2023
Special inspection requirement — Ventilation and air distribution system
MUZAFFAR JAMAL
01/19/2023
Special inspection requirement — Fenestration areas
MUZAFFAR JAMAL
01/19/2023
Special inspection requirement — Insulation placement and R values
MUZAFFAR JAMAL
01/19/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
MUZAFFAR JAMAL
01/19/2023
Special inspection requirement — Interior lighting power
MUZAFFAR JAMAL
01/19/2023
Special inspection requirement — Fenestration air leakage
MUZAFFAR JAMAL
01/19/2023
Special inspection requirement — Mechanical Systems
MUZAFFAR JAMAL
01/19/2023
Special inspection requirement — Concrete - Cast-In-Place
MUZAFFAR JAMAL
01/19/2023
Special inspection requirement — Masonry
MUZAFFAR JAMAL
01/19/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
MUZAFFAR JAMAL
01/19/2023
Special inspection requirement — Subgrade Inspections
MUZAFFAR JAMAL
01/19/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
MUZAFFAR JAMAL
01/17/2023
Filed — Alteration CO
ADDITION & ALTERATION OF ONE FAMILY HOUSE
Q00765552-P1
10/26/2022
Objection raised — Accessibility
10/26/2022
Objection resolved — Addressed
10/25/2022
Filed — Alteration
Q00765554-I1
10/24/2022
Filed — Alteration
Install new plumbing fixtures and related piping as per drawing.
Q00765553-I1
09/07/2022
Objection raised — Zoning
09/07/2022
Objection resolved — Addressed
09/07/2022
Objection raised — Scope
09/07/2022
Objection resolved — Addressed
09/07/2022
Objection raised — Zoning
09/07/2022
Objection resolved — Addressed
09/07/2022
Objection raised — Zoning
09/07/2022
Objection resolved — Addressed
09/07/2022
Objection raised — Zoning
09/07/2022
Objection resolved — Addressed
09/07/2022
Objection raised — Zoning
09/07/2022
Objection resolved — Addressed
09/07/2022
Objection raised — Scope
09/07/2022
Objection resolved — Addressed
Latest 60 of 61 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedHORBRIDGE PLUMBING & HEAT04/24/2023
DOB NOWConstruction FencePermit IssuedUNITED GENERAL CONTRA COR01/31/2023
DOB NOWGeneral ConstructionPermit IssuedUNITED GENERAL CONTRA COR01/30/2023
1 project · most recent 01/17/2023
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
01/17/2023Permit IssuedUNITED GENERAL CONTRA CORAir Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Goodman ASPT 39C14 3 tons · Fan Coil Indoor ×2
Ventilation
Greenheck SP-C50-QD 50 CFM · Exhaust Fan ×6
SP-B90 100 CFM · Kitchen Exhaust ×2
1 project · most recent 08/19/2023
Gas Water/Sanitary
FiledStatusContractorScope
08/19/2023Permit IssuedHORBRIDGE PLUMBING & HEATGas, Water/Sanitary
1 project · most recent 07/22/2024
General Wiring
FiledStatusContractorScope
07/22/2024CompleteMETROPOLITAN ELEC OF NY IGeneral Wiring
1 project · most recent 01/17/2023
Concrete Masonry Wood
FiledStatusContractorScope
01/17/2023Permit IssuedUNITED GENERAL CONTRA CORConcrete, Masonry, Wood
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
10/10/2023Pass-Final CND-Occupancy InspectionPassView ↗
09/08/2023Pass-Final CND-Occupancy InspectionPassView ↗
05/12/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/12/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 40
DateRequirementInspectorRole
03/27/2026HVAC-R and service water heating system controls—energy_progress
06/04/2024Permanent certificateMUZAFFAR JAMALenergy_progress
06/04/2024MeteringMUZAFFAR JAMALenergy_progress
06/04/2024HVAC-R and service water piping design and insulationMUZAFFAR JAMALenergy_progress
06/04/2024Energy Code Compliance InspectionsMUZAFFAR JAMALprogress
06/04/2024Maintenance informationMUZAFFAR JAMALenergy_progress
06/04/2024HVAC-R and service water heating system controlsMUZAFFAR JAMALenergy_progress
06/04/2024Fire-Resistant Penetrations and JointsMUZAFFAR JAMALspecial
06/04/2024HVAC-R and service water heating equipmentMUZAFFAR JAMALenergy_progress
07/19/2023Permanent certificateMUZAFFAR JAMALenergy_progress
07/19/2023Energy Code Compliance InspectionsMUZAFFAR JAMALprogress
07/19/2023MeteringMUZAFFAR JAMALenergy_progress
07/19/2023HVAC-R and service water heating system controlsMUZAFFAR JAMALenergy_progress
07/19/2023HVAC-R and service water heating equipmentMUZAFFAR JAMALenergy_progress
07/19/2023HVAC-R and service water piping design and insulationMUZAFFAR JAMALenergy_progress
07/19/2023Maintenance informationMUZAFFAR JAMALenergy_progress
07/19/2023Fire-Resistant Penetrations and JointsMUZAFFAR JAMALspecial
01/19/2023HVAC-R and service water piping design and insulationMUZAFFAR JAMALenergy_progress
01/19/2023Ventilation and air distribution systemMUZAFFAR JAMALenergy_progress
01/19/2023Fenestration areasMUZAFFAR JAMALenergy_progress
01/19/2023Insulation placement and R valuesMUZAFFAR JAMALenergy_progress
01/19/2023Fenestration and door U-factor and product ratingsMUZAFFAR JAMALenergy_progress
01/19/2023Interior lighting powerMUZAFFAR JAMALenergy_progress
01/19/2023Fenestration air leakageMUZAFFAR JAMALenergy_progress
01/19/2023Mechanical SystemsMUZAFFAR JAMALspecial
Latest 25 of 40.
▾Documents — 59 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/25/2026Q00765554-I1Request digital key ↗
08/25/2026Q00765552-P1Request digital key ↗
08/25/2026Q00765552-P2Request digital key ↗
Showing 3 of 6 on file for this type
▸Zoning, Tax Lot & Property Records4
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026Q00765552-P1Open ↗
08/13/2026Q00765552-P2Open ↗
08/13/2026Q00765552-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00765552-I1Open ↗
▸Seals & Professional Certifications22
▸DOB NOWProgress Inspector Seal & Signature12
09/01/2026Q00765553-I1Open ↗
09/01/2026Q00765553-I1Open ↗
08/31/2026Q00765552-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/25/2026Q00765552-P2Open ↗
08/25/2026Q00765552-I1Open ↗
08/25/2026Q00765552-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/01/2026Q00765553-I1Open ↗
08/31/2026Q00765552-I1Open ↗
08/24/2026Q00765552-P2Open ↗
Showing 3 of 4 on file for this type
▸Trade Schedules & Equipment3
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/13/2026Q00765552-P2Open ↗
08/13/2026Q00765552-I1Open ↗
08/13/2026Q00765552-P1Open ↗
▸Safety & Tenant Protection5
▸DOB NOWStreet Tree Checklist3
08/13/2026Q00765552-P2Open ↗
08/13/2026Q00765552-P1Open ↗
08/13/2026Q00765552-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026Q00765552-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026Q00765552-I1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/25/2026Q00765552-P1Open ↗
08/25/2026Q00765552-P2Open ↗
08/15/2026Q00765553-I1Open ↗
Showing 3 of 5 on file for this type
▸Other Documents14
▸DOB NOWSite Survey: Initial3
08/13/2026Q00765552-I1Open ↗
08/13/2026Q00765552-P1Open ↗
08/13/2026Q00765552-P2Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026Q00765552-I1Open ↗
08/13/2026Q00765552-P2Open ↗
08/13/2026Q00765552-P1Open ↗
▸DOB NOWPlot Diagram3
08/13/2026Q00765552-I1Open ↗
08/13/2026Q00765552-P1Open ↗
08/13/2026Q00765552-P2Open ↗
▸DOB NOWProperty Ownership Certification3
08/25/2026Q00765552-P1Open ↗
08/25/2026Q00765552-P2Open ↗
08/15/2026Q00765552-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00765552-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00765552-I1Open ↗