← Back
Two stories - detached, small or mid-size
87-16 253 STREET
QUEENS · BIN 4176467
💬 Discuss this project
1935Year Built
2.5Stories
A1Building Class
R2AZoning
1,350 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 3,400 sf lot · 0.4 FAR built · Flood zone X
Locations of Work
Architecture
Floor 21p · 1 filing · 6 docs
Floor 11 filing · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PRAMNOS607/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/28/2021$675K—Private party → Private party$500/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ABEJA ENGINEERING PLLC108/03/2021
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ABEJA ENGINEERING PLLC7269108/03/2021
Building Lifecycle
All (8)Filed (1)Permit Issued (2)Inspection (2)Special Inspection (3)
06/12/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/30/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/06/2022
Permit issued — General Construction
Q00556422-I1-GC
11/02/2021
Permit issued — General Construction
Q00556422-I1-GC
08/03/2021
Filed — Alteration
FILING FOR THE INTERIOR RENOVATION THROUGH OUT THE 1ST. AND 2ND FLOORS ONLY. INCLUDES REPLACING / REPAIRING FINISHES, FLOORING, AND PAINT ON THE WALLS AND CEILING. PATCH 10SF OF CONCRETE IN EXISTING DRIVEWAY IN OPEN SPACE.
Q00556422-I1
07/13/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHANN VELEZ
07/13/2021
Special inspection requirement — Fire-Resistance Rated Construction
JOHANN VELEZ
07/13/2021
Special inspection requirement — Final
JOHANN VELEZ
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedPRAMNOS LLC.10/06/2022
DOB NOWGeneral ConstructionPermit IssuedPRAMNOS LLC.11/02/2021
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
06/12/2026Pass-Final CND-Occupancy InspectionPassView ↗
03/30/2023Pass-Final CND-Occupancy InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
07/13/2021Fire-Resistant Penetrations and JointsJOHANN VELEZspecial
07/13/2021Fire-Resistance Rated ConstructionJOHANN VELEZprogress
07/13/2021FinalJOHANN VELEZprogress
▾Documents — 6 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/27/2026Q00556422-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWProgress Inspector Seal & Signature2
08/28/2026Q00556422-I1Open ↗
08/28/2026Q00556422-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/27/2026Q00556422-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/28/2026Q00556422-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/27/2026Q00556422-I1Open ↗