← Back
Primarily 1 family with 1 store or office
87-20 WOODHAVEN BOULEVARD
QUEENS · Woodhaven · BIN 4184267
💬 Discuss this project
1931Year Built
2.5Stories
S1Building Class
R3-1Zoning
3,085 sfGross Floor Area
2Units
2 Open Violations ▸FDNY Report ↗
Primarily 1 family with 1 store or office · Owner of record: J&M ENTERPRIZE LLC · 4,800 sf lot · 0.64 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Attic10p · 1 filing · 20 docs
Floor 235p · 3 filings · 20 docs
Floor 130p · 4 filings · 20 docs
Cellar38p · 4 filings · 20 docs
Site & exterior9p · 2 filings · 20 docs
Filed — no permit issued4p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC REAL PROPERTY CONSULTANTS2807/08/2026
ERA PARK LANE REALTY403/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AUTOGRAPHIC CO403/03/2026
ARJUNE DESIGN STUDIO411/22/2025
STONE ENGINEERING& ARCHITECTURE DPC310/07/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
RS CONST & EXP SERVICES1803/21/2026
ADSSPECIAL INSPECTIONS203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
J&J DESIGNS INCGeneral Contractor407/08/2026
INFINITI ESC PLUMBING CORPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AUTOGRAPHIC CO1579803/03/2026
ADS SPECIAL INSPECTIONS1270711/22/2025
Building Lifecycle
All (96)Filed (11)Permit Issued (5)Violation (10)Inspection (4)Objection (36)Special Inspection (30)
08/30/2026
Objection resolved — Resolved
08/30/2026
Objection resolved — Resolved
08/30/2026
Objection resolved — Resolved
08/13/2026
Objection raised — Cost
06/16/2026
Objection resolved — Addressed
06/02/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
asghar Ghodsi
06/02/2026
Special inspection requirement — Final
asghar Ghodsi
06/02/2026
Special inspection requirement — Structural Steel - Welding
asghar Ghodsi
06/02/2026
Special inspection requirement — Post-installed Anchors
asghar Ghodsi
06/02/2026
Special inspection requirement — Structural Wood Frame
asghar Ghodsi
06/02/2026
Special inspection requirement — Wood – Seismic Resistance
06/02/2026
Special inspection requirement — Masonry
asghar Ghodsi
06/02/2026
Special inspection requirement — Concrete - Cast-In-Place
asghar Ghodsi
06/02/2026
Special inspection requirement — Structural Steel - Details
asghar Ghodsi
06/02/2026
Special inspection requirement — Structural Steel - High Strength Bolting
asghar Ghodsi
06/02/2026
Special inspection requirement — Subgrade Inspections
asghar Ghodsi
03/03/2026
Filed — Alteration
Q00987446-P2
03/03/2026
Special inspection requirement — Masonry
asghar Ghodsi
03/03/2026
Special inspection requirement — Structural Steel - Welding
asghar Ghodsi
03/03/2026
Special inspection requirement — Final
asghar Ghodsi
03/03/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
asghar Ghodsi
03/03/2026
Special inspection requirement — Structural Steel - Details
asghar Ghodsi
03/03/2026
Special inspection requirement — Wood – Seismic Resistance
03/03/2026
Special inspection requirement — Structural Wood Frame
asghar Ghodsi
03/03/2026
Special inspection requirement — Post-installed Anchors
asghar Ghodsi
03/03/2026
Special inspection requirement — Structural Steel - High Strength Bolting
asghar Ghodsi
03/03/2026
Special inspection requirement — Subgrade Inspections
asghar Ghodsi
03/03/2026
Special inspection requirement — Concrete - Cast-In-Place
asghar Ghodsi
12/31/2025
Objection resolved — Addressed
12/29/2025
Objection resolved — Addressed
12/22/2025
Special inspection requirement — Interior lighting power
NISCHAL ARJUNE
12/22/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
asghar Ghodsi
12/22/2025
Special inspection requirement — Insulation placement and R values
NISCHAL ARJUNE
12/22/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
NISCHAL ARJUNE
12/22/2025
Special inspection requirement — Lighting controls
NISCHAL ARJUNE
12/22/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
NISCHAL ARJUNE
12/22/2025
Special inspection requirement — Energy Code Compliance Inspections
NISCHAL ARJUNE
12/22/2025
Special inspection requirement — Fenestration areas
NISCHAL ARJUNE
11/22/2025
Filed — Alteration
MINOR INTERIOR RENOVATION AT CELLAR, FIRST, SECOND, AND ATTIC FLOORS AS PER PLANS
Q00923538-P3
11/11/2025
Objection raised — Fire_Protection
11/11/2025
Objection raised — Scope
11/11/2025
Objection raised — Other
11/11/2025
Objection raised — Accessibility
11/11/2025
Objection raised — Scope
10/07/2025
Filed — Alteration
Q00943773-P1
07/03/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/04/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/04/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
11/26/2024
Filed — Alteration
Q00992809-I1
10/29/2024
Permit issued — Structural
Q00987446-I1-ST
10/29/2024
Permit issued — General Construction
Q00923538-I1-GC
10/29/2024
Permit issued — Mechanical Systems
Q00987439-I1-MS
10/16/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
10/03/2024
Permit issued — Plumbing
Q00943773-I1-PL
06/25/2024
Filed — Alteration
Q00987446-P1
03/15/2024
Filed — Alteration
MINOR INTERIOR RENOVATION AT CELLAR, FIRST, SECOND, AND ATTIC FLOORS AS PER PLANS
Q00923538-P2
03/06/2024
Filed — Alteration
Q00987446-I1
02/29/2024
Objection resolved — Addressed
02/29/2024
Objection resolved — Addressed
02/21/2024
Objection resolved — Addressed
Latest 60 of 96 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralPermit IssuedJ&J DESIGNS INC10/29/2024
DOB NOWGeneral ConstructionPermit IssuedJ&J DESIGNS INC10/29/2024
DOB NOWMechanical SystemsPermit IssuedJ&J DESIGNS INC10/29/2024
DOB NOWPlumbingPermit IssuedINFINITI ESC PLUMBING COR10/03/2024
DOB NOWGeneral ConstructionPermit IssuedJ&J DESIGNS INC09/27/2023
BIS—ISSUEDMAUCERI SIGNS03/21/1996
BISPLISSUEDMAGOR PLG04/07/1995
BIS—ISSUEDMAUCERI SIGNS03/08/1995
BIS—ISSUEDMAUCERI SIGNS03/08/1995
BISOTISSUEDMAUCERI SIGN CO03/08/1995
BIS—ISSUEDN/A08/03/1994
1 project · most recent 01/18/2024
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
01/18/2024Permit IssuedJ&J DESIGNS INCHeating and Air Conditioning Systems
Heat / Cool
Fujitsu AIR HANDLER 1750 CFM, MADE FUJITSU, MODEL FF98MV508521UP 84 000 BTU HEATING. EFFICIENCY 98.1% FURNACE FILED UNDER PL Q00943773 48,000 BTU · Fan Coil Indoor ×1
AIR HANDLER LOCATED AT CELLAR LEVEL: MADE FUJITSU, MODEL FF96TV3040174M4 42000 BTU. EFF 98.1% , FURNACE FOR HEATING FILED UNDER PL Q00943773 42,000 BTU · Fan Coil Indoor ×1
MADE: FUJITSU, MODEL F04813C, 48000 BTU COOLING LOCATED IN OPEN SPACE 48,000 BTU · Condensing Unit ×1
MADE: FUJITSU, MODEL FO24113C 24 000 BTU COOLING LOCATED IN OSP 48,000 BTU · Condensing Unit ×1
1 project · most recent 10/04/2023
General Wiring
FiledStatusContractorScope
10/04/2023Permit IssuedPOWER SURGE ELECTRIC, INCGeneral Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
07/03/2025Pass-Final CND-Occupancy InspectionPassView ↗
03/04/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/04/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
10/16/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 70
DateRequirementInspectorRole
06/02/2026Subgrade Inspectionsasghar Ghodsispecial
06/02/2026Structural Stability – Alterations of existing buildingsasghar Ghodsispecial
06/02/2026Masonryasghar Ghodsispecial
06/02/2026Concrete - Cast-In-Placeasghar Ghodsispecial
06/02/2026Structural Wood Frameasghar Ghodsiprogress
06/02/2026Post-installed Anchorsasghar Ghodsispecial
06/02/2026Structural Steel - High Strength Boltingasghar Ghodsispecial
06/02/2026Structural Steel - Detailsasghar Ghodsispecial
06/02/2026Structural Steel - Weldingasghar Ghodsispecial
06/02/2026Finalasghar Ghodsiprogress
06/02/2026Wood – Seismic Resistance—special
03/03/2026Concrete - Cast-In-Placeasghar Ghodsispecial
03/03/2026Structural Stability – Alterations of existing buildingsasghar Ghodsispecial
03/03/2026Structural Wood Frameasghar Ghodsiprogress
03/03/2026Finalasghar Ghodsiprogress
03/03/2026Wood – Seismic Resistance—special
03/03/2026Subgrade Inspectionsasghar Ghodsispecial
03/03/2026Structural Steel - Weldingasghar Ghodsispecial
03/03/2026Structural Steel - High Strength Boltingasghar Ghodsispecial
03/03/2026Structural Steel - Detailsasghar Ghodsispecial
03/03/2026Post-installed Anchorsasghar Ghodsispecial
03/03/2026Masonryasghar Ghodsispecial
12/22/2025Energy Code Compliance InspectionsNISCHAL ARJUNEprogress
12/22/2025Fenestration areasNISCHAL ARJUNEenergy_progress
12/22/2025Lighting controlsNISCHAL ARJUNEenergy_progress
Latest 25 of 70.
▾Documents — 99 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
08/23/2026Q00987439-I1Request digital key ↗
08/23/2026Q00987446-P1Request digital key ↗
08/23/2026Q00987446-I1Request digital key ↗
Showing 3 of 11 on file for this type
▸Seals & Professional Certifications77
▸DOB NOWSpecial Inspector Seal & Signature34
09/02/2026Q00987446-P1Open ↗
09/02/2026Q00987446-P1Open ↗
09/02/2026Q00987446-P1Open ↗
Showing 3 of 34 on file for this type
▸DOB NOWProgress Inspector Seal & Signature32
09/02/2026Q00987446-P1Open ↗
09/02/2026Q00987446-P1Open ↗
09/01/2026Q00923538-P2Open ↗
Showing 3 of 32 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature11
08/23/2026Q00987439-I1Open ↗
08/23/2026Q00987446-I1Open ↗
08/23/2026Q00987446-P1Open ↗
Showing 3 of 11 on file for this type
▸Environmental & Asbestos11
▸DOB NOWDEP ACP-5: Asbestos Assessment Report11
08/23/2026Q00987439-I1Open ↗
08/23/2026Q00987446-P1Open ↗
08/23/2026Q00987446-P2Open ↗
Showing 3 of 11 on file for this type